Letter Sequence Other |
|---|
|
Results
Other: ML20008G315, ML20023B690, ML20023B693, ML20064D127, ML20064G097, ML20064K897, ML20064N491, ML20070W125, ML20070W130, ML20071A617, ML20079N907, ML20083N032, ML20083N079
|
MONTHYEARML20008G3151981-06-29029 June 1981 Responds to Generic Ltr 81-04 Re Implementation of NUREG-0313,Revision 1, Technical Rept on Matl Selection & Processing Guidelines for BWR Coolant Pressure Boundary Piping, Per NRC 810226 Request Project stage: Other ML20064D1271982-12-15015 December 1982 Responds to Items 1 & 4 of IE Bulletin 82-03 Re Stress Corrosion Cracking in Austenitic Stainless Steel Recirculation Sys Piping.Total of 51 Circumferential & Branch Connection Welds & 6 Longitudinal Welds Examined Project stage: Other ML20064G0971983-01-0606 January 1983 Forwards Documentation of 821207,13 & 14 Telcons Re Inservice Insp Findings & Resultant Repair Activities Conducted During Maint/Refueling Outage Presently in Progress Project stage: Other ML20064K8971983-01-26026 January 1983 Responds to IE Bulletin 82-03 Re Stress Corrosion Cracking in Austenitic Stainless Steel in BWR Recirculation Sys Piping.Info Re Items 1 & 4 Submitted 821215.Info Completes Response Project stage: Other ML20083N0321983-01-26026 January 1983 Responds to Items 2 & 3 of IE Bulletin 82-03 Re Stress Corrosion Cracking in Austenitic Stainless Steel BWR Recirculation Sys Piping.Responses to Items 1 & 4 Provided in Util .Recirculation Sys Welds Will Be Repaired Project stage: Other ML20083M9661983-01-27027 January 1983 Forwards Info Re Analyses & Repairs of Recirculation & RHR Sys Piping Welds.Details of Inservice Insp Discussed.Util Intends to Return Unit to Power Operation Upon Completion of Current Outage.Meeting Scheduled for 830201 to Discuss Subj Project stage: Meeting ML20083N0791983-01-31031 January 1983 Rev 0 to Design Rept for Recirculation Sys & RHR Sys Weld Overlay Repairs & Flaw Evaluation at Ei Hatch Nuclear Power Plant Unit 1 Project stage: Other ML20064N4771983-02-10010 February 1983 Application for Amend to License DPR-57,revising Tech Specs on Reactor Coolant Leakage Limiting Conditions for Operation & Surveillance Requirements Project stage: Request ML20064N4911983-02-10010 February 1983 Proposed Tech Specs Re Reactor Coolant Leakage Limiting Conditions for Operation & Surveillance Requirements Project stage: Other ML20070W1251983-02-11011 February 1983 Forwards Corrected Proposed Tech Specs Re Recirculation & RHR Sys Piping Repairs Submitted on 830210.Typographical Errors Contained in Paragraphs 2.a & 2.b of Page 3.6-8 Project stage: Other ML20071A6171983-02-11011 February 1983 Notice of Issuance & Availability of Amend 93 to License DPR-57 Project stage: Other ML20070W1301983-02-11011 February 1983 Corrected Proposed Tech Spec Page 3.6-8 Re Reactor Coolant Leakage Project stage: Other ML20071A6061983-02-11011 February 1983 Safety Evaluation Supporting Amend 93 to License DPR-57 Project stage: Approval ML20079N9071983-02-18018 February 1983 Documents 830124 Telcon Re Replacement of Selected Portion of Stainless Steel 4-inch Diameter Reactor Water Cleanup Return Line Piping Project stage: Other ML20023B6931983-03-0404 March 1983 Rev 1 to Design Rept for Recirculation Sys & RHR Sys Weld Overlay Repairs & Flaw Evaluation at Ei Hatch Nuclear Power Plant,Unit 1 Project stage: Other ML20023B6901983-04-28028 April 1983 Forwards Rev 1 to Design Rept for Recirculation Sys & RHR Sys Weld Overlay Repairs & Flaw Evaluation at Ei Hatch Nuclear Power Plant,Unit 1 Project stage: Other 1983-01-06
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
Georgia Power Company 333 Piedmont Avenue Atlanta, Gec<g;3 30308 Telephone 404 526 7895 Ma: Lng Address Post Office Bcx 4545 h
Atlanta. Georg;a 30302 Georgia Power the southem oWjre system J.c.causey NED-83-094 Vice President Fossil and Hydro Generation February 11, 1983 Director of Nuclear Reactor Regulation Attention: Mr. John Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 ERRORS IN PROPOSED CHANGES TO TEC W ICAL SPECIFICATIONS Gentlemen:
Attached are corrigenda to the proposed changes to Technical Specifications for Plant Hatch Unit 1 submitted by our letter dated February 10, 1983, titled " Recirculation and R$ Systens Piping Repairs".
The errors corrected were of a typographical nature, and were contained in paragraphs 2.a and 2.b of page 3.6-8 of the proposed Technical Specifications as 1
marked.
The corrections were discussed with the MC Plant Hatch Project Manager on February 10 and 11, 1983.
Should you have any questions in this regard, please contact this office.
J. C. Causey states that he is Vice President of Georgia Power. Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.
GEORGIA POWER COWANY b h /./ /
4 By:
t J7 C. Causey
~f Sworn t and subscribed before me this 11th day February.1983.
/((, f[M _, My Commession Espres Sept. 20,1983
/
Notary Public. Georgia, State at [.arge U1,
.w
~
Notary Public JAE/mb Enclosures A
xc:
J. T. Beckham, Jr.
l l,M H. C. Nix, Jr.
Senior Resident Inspector
'I 'V J. P. O'Reilly. (NRC-Region II) 0302180287 830211 PDR ADOCK 05000321 p
PDR