Proposed Tech Spec Changes Re one-time Extension of RHR Surveillance Interval Until End of Cycle 8,scheduled for 840901
ML20091G385
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/25/1984
From:
GEORGIA POWER CO.
To:
Shared Package
ML20091G382 List:
References
TAC-55087, NUDOCS 8406040243
Download: ML20091G385 (1)


Text

-

) .'

~

i LIMITING CDt0ITIOt6 POR OPERATION ' '

SURVEILLANQ: REQUIRENENIS i

. I 3.5.A.2 Operation with Inoperable 4.5.A.2 Surveillance with Inoperable Congonents Couponents.

If one CS system loop is When it is determined that inoperable, the reactor may one core spray loop is  !

remain in operation for a inoperable at a time when period not to exceed seven operability is recpired, the (7) days providing all active other core spray loop, the conponents in the other CS RHR system IPCI mode, and the system loop, the RHR system diesel generators shall be LPCI mode and the diesel demonstrated to be operable generators are operable ilimediately. 'Ihe operable core spray loop shall be demonstrated to be operable daily until both loops are returned to normal operation.

3. Stutdown Recpirements If Specification 3.5.A.l.a or 3.5.A.2 cannot be met the reactor shall be placed in the Cbid Sh2tdown Condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B. Resicllal Heat Removal (RHR) B. Resicklal Heat Removal (RHR)

System (LPCI and Containment System (LPCI and Containment

, Cooling Mode) Coolirx3 Mode)

1. Normal System Availability 1. Normal Operational Tests RHR system testing shall'be performed as follows:

Item Frecpertmf

a. The RHR System shall be a. Air test on Once/5 years
  • operable: drywell head-ers and nozzles (1) Prior to reactor startup -and air or from a cold condition, or water test on

-torus headers (2) When icradiated fuel is- and nozzles in the reactor vessel and the reactor presaire is greater 'un atmospheric weept as stated in Specification 3.5.B.2 A one-time exenption from 4.5.B.l.a is granted to allow alrveillance to be performed at- the end of cycle 8 3.5-2 8406040243 840525