Application to Amend License DPR-57,changing Tech Specs Re one-time Extension of RHR Surveillance Interval Until End of Cycle 8,scheduled for 840901
ML20091G381
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/25/1984
From: Beckham J
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20091G382 List:
References
NED-84-275, TAC-55087, NUDOCS 8406040241
Download: ML20091G381 (5)


Text

,.

' Georgia Power Corrmany -

- 0*J3 Piedmont Avenue _.

". Attanta. Georgia 30308 '

Te:ephone 404 526 7020

{

Maang Addrets:

J Por,t Othee Box 4545" -

Atianta. Geofgta 30302 Georgia Power r

J. T. Beckham, Jr.

Vee President and Ger'eral Manager l

Nuclear Generahon NED-84-275 i-1 May 25, 1984

. Director of Maclear Reactor Reg 11ation Attention: ' Mr. John F. Stolz, Chief i

Operating Reactors Branch No. 4 Division of Licensing U. S. M1 clear Reg 11atory Commission Washington, D.-C.

20555 i

1NBC DOCKET 50-321-OPERATING LICENSE DPR-57

'ENIN I. HATOI NUCIEAR PLAlfr WIT 1 ONE TDE EX'IENSIN CF RHR SURVEILIANCE IlfrERVAL i

i Puralant to.10 CPR 50.90, as reg 11 red by 10 CPR 50.59(c) (1),' Georgia l

Power nnepany hereby reglests 'a change to. the Technical Specifications, Appendix A to the operating license.

- The proposed change is a one-time extension of-Surveillance Reglirement 4.5.B.l.a.,. which reg 11res air testing of the drywell.and torus _ headers and nozzles once ' per 5 years to demonstrate. operability of the containment.

cooling mode of RHR. Under otirrent reglirements, which include a 25 percent grace period, the airveillances mast be performed prior to Jiane 19, 1984, 1

l-(torus) and Jiane. 22, '1984 -(drywell).. In order-to prevent a unit 'shitdown solely for. the performance of this alrveillance, we'.hereby. reglest an-extension of ' the alrveillance ' interval until-the. end of cycle 8, schediled approximately for September 1,1984.- The. extension would 1be the. eglivilant of extending the grace period from 25 to approximately 30 percent.3

. The Plant Review Board has reviewed the' prewpaad change and determined -

-that --it. does not involve an - unreviewed safety ~ question. -

Accident probabilities ard conseglences are not! increased above those analyzed in the FSAR.. The: parpose of the -containment spray ~ system Jis ' to redice primary.

containment presaire: followingia design basis accident.

The long1 term

presaire.and temperabtre response of the primary ~oontainment' is' analyzed in Section 14.4.3.3.2 ~of the PSM.: Cases are analyzed for.~several1RHR--system conditions, inchiding no containment spray. ; Thef effactLof no containment -

sprayLis1.a. higher : secondary. peak ' containment presaire. (14.3 vermis r11.8:

~

3 poig). As : stated in - the FSAR,- this.is :inconsegmential;since _it Lis bounded Dy the ; initial; peak presaire and. is - far ~ below' the ' design: contaimeent

' presaire of 56 psig. Ttus,toperability of _the ;oontainment spray. system is-not ~reglired to meet sthe design basis. 'The regnested; airveillance interval?

.. extension lrea11ts -in ' only a. maall additional - probability? that-potential 2 system finoperability L might1.. remain;' undetected. JNo new zaccidents arei

created. The _ margin of; safety is not affected.by this change.-

n i

t ww. - g.,y J n'"n M8En*c..osooopy 7

&. A4 1

4

-L, t.-

=

GeorgiaPower d U. S. Riclear Regalatory Comnission Director of Reactor Regulation May 25,1984 Page 2 details our determination, puraiant to 10 TR 50.92, that the proposed amendment does not involve significant hazards considerations.

In order to avoid unit shutdown, it is necessary that we obtain staff review and isa2ance of the license amendment prior to the surveillance &e date of aine 19, 1984.

This win reg 2 ire an exemption from prior notice and opportunity for a hearing or for public comment under the provisions of 10 GR 50.91(a) (5).

We hereby reglest alch an exemption.

10 GR 50.91(a) (5) further states that the licensee mist explain why the emergency situation occurred.

In this case, failure to sche &le the alrveillance in a prior outage was &e to an isolated problem in the site sirveillance assigment system.

The missed assignment was not detected until it was recently identified by the fonowup tickler file maintained by the site Regulatory coupliance staff.

Due to this late discovery, we mist reglest emergency licensig relief to avoid unit shutdown.

Should an outage of alfficient & ration to perform the albject airveinance oco2r, either before or after approval of the reglested exenption, we win perform the airveinance at that time.

Enclosed along with the proposed charges is a determination of amendment class and payment of applicable licensing fees.

Riraiant to the regiirements of 10 GR 50.91, Mr. J. L. Ledbetter of the Envirorsnental Protection Division of the Georgia Department of Natural Resources will be sent a copy of this letter and all applicable attachments.

J. T. Beckham, Jr. states that he is Vice President of Georgia Power Conpany and is althorized to exeatte this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts m t forth in this letter are true.

GEDRGIA RXER COMPANY By

}

J. T. Beckham, Jr.

n nd ore th 1984.

Notsry Riblic ' ~

" ~~'

REB /

Encloalres xc:

H. C. Nix, Jr.

Senior Resident Inspector l

J. P. O'Reilly, (NRC-Region II)

J. L. Iedbetter F00775 L_

L ATTACFDENT.1 NRC DOO Tr 30-321 OPERATING LIGNSE DPR-57 EDWIN.I. HA'IGI NUCLEAR PIANP LNIT,1,

DETERMINATICE OF NO SIGNIFICANT HAZARDS 1.

One-time. extension of surveillance requirement for drywell and torus containment spray system headers and nozzles.

BASIS This change is not a significant hazards consideration in that:

1) It does not involve a significant increase in the probability or consequences of an accident previously evaluated. The requested one-time surveillance interval extension involves a system that is not required to meet design basis conditions.

The FSAR accident analysis does not assume operability of the system. Therefore, the slight increase in probability of potential system inoperability remaining. undetected, due to the extended surveillance interval, has no effect on analyzed accidents.

2) It does not create the possibility of a new or different kind of accident from any accident previously evaluated, since no new modes of operation are involved.
3) It does not involve a significant reduction in a margin of safety.

The margin of safety would be maintained without operability of the system.

?

y 6-_'

ATTAC&ENT 2 NRC D00 Tr 50-321 OPERATING LICENSE DPR-57 EDWIN I. HA'IGI NUCLFAR PLANT UNIT 1 DE7PMMINATION OF AENDMWr CLASS Rirmant to 10 CPR,170.12 (c), Georgia Power Conpany has' evaluated the attached proposed amendment to Operating License DPR-57 and has determined that:

a)

The proposed amendment does not reglire the evaluation of a new Safety Analysis Report or rewrite of the facility license; b)

The proposed amendment does not contain several couplex ismes,

does not involve ACRS review, and does not reglire an environmental inpact statement; c)

The proposed amendment does not involve. a couplex isme or more than one environmental or safety isme; d)

'Ihe proposed amendment does involve a single safety isme; namely, a one-time extension of a sirveillance interval.

e)

'Ihe proposed ' amendment is therefore a Class III amendment.

E b

d 1

i d =

l J

W

+

i ATTACIMNr 3 NRC DOCKET 50-321.

EDWIN I..HA'IGI NUCLEAR PIRff INIT 2 PROPOSED CHANGE TO TBCHNICAL SPECIFICATIONS The proposed change to Technical Specifications (Appendix A to Operating

- Licenm DPR-57) would be incorporated as follows:

Remove Page Insert Page 3.5-2 3.5-2

- z,

f.%6 '

f-S

+ i s

T.

e, s

+ a

( '

5.7

~

l s

,.:-y-.

y+,_

~

3

....