ML20085N117

From kanterella
Jump to navigation Jump to search
Revised Tech Spec Table 3.3-9 Re Remote Shutdown Monitoring Instrumentation
ML20085N117
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/06/1991
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20085N115 List:
References
NUDOCS 9111140092
Download: ML20085N117 (1)


Text

. _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ -

..t

-s.

-TABLE 3'.3-9

_g REMOTE SHUTDOWN MONITORING INSTRUMENTATION i.

. ti o 8$.L MINIMUM N

. READ 0UT-MEASUREMENT CHANNELS o'o INSTRUMENT

LOCATION RANGE.

OPERABLE u-om l '. Reactor Trip Breaker'

- CRD.switchgear room open-close.

I per trip breaker and 38g p

Indication' 124 foot ' elevation -

1-per secondary trip breaker-n Remote' shutdown panel.

520-620*F-1 per loop 2.

Reactor ~ Coolant Temperature -'Th L

j 3.

Reactor. Coolant Pressure-Remote, shutdown panel 0-2500 psig

'l f'

4.

Pressurizer Level

Remote shutdown' panel 0-320" H O 1

2 5.

Steam Generator Pressure Remote shutdown panel 0-1200 psig 1 per steam generator 6.

Steam Generator Level Remote shutdown panel 0-100%

1 per steam generator l

t l

7.

Decay Heat Removal.

Remote shutdown panel 0-300*F 1 per cooler Temperature 8.

Motor Driven Emergency

. Intermediate. Building 0-2000'psig 1 per pump 5

Feedwater-Pressure 95 foot elevation l

9.

Nuclear Services Closed '

-Auxiliary' Building-0-300 psig 1

i Cycle Cooling. Pumps 95' foot elevation j.

Discharge Pressure

10. Nuclear Services Closed Auxiliary Building 0-250*F 1 per cooler i

Cycle Cooling Cooler.

95 foot. elevation-j Outlet' Temperature i

i

)

CRYSTAL-RIVER.-' UNIT 3 3/4 3 ' Amendment No.

. _ _ _