Letter Sequence Other |
|---|
|
|
MONTHYEARML20050C9591982-04-0505 April 1982 Proposed Tech Specs for Amend to HPCI & Reactor Core Isolation Cooling Requirements Project stage: Other ML20050C9561982-04-0505 April 1982 Application to Amend License DPR-57,changing Tech Spec Operability Requirements for HPCI Sys & Reactor Core Isolation Cooling Sys,Per 10CFR50.90 & 10CFR50.59(c)(1) Project stage: Request ML20070P0331983-01-19019 January 1983 Rev to 820405 Application to Amend License DPR-57.Document Control Error Resulted in Inadvertent Inclusion of Changed Tech Spec Page Containing Automatic Dispatch Sys Operability Requirement Project stage: Request ML20236E0911983-08-10010 August 1983 Requests Addl Info Re Util 820405 & 830101 Tech Spec Change Requests to Increase Pressure Above Which HPCI & RCIC Sys Must Be Operable.Notification of Intent to Withdraw Request or Revise Submittals Requested.Background Info Encl Project stage: Other ML20078F7301983-10-0303 October 1983 Withdraws Proposed Amend to Tech Specs Changing Requirements for HPCI & RCIC Sys to Require Operability at Pressure Greater than 150 Psig,Per Project stage: Other ML20083E5451983-12-21021 December 1983 Application for Amend to Licenses DPR-57 & NPF-5,revising Tech Specs to Clarify Operability Conditions for Drywell Hydrogen & Oxygen Analyzers to Meet NUREG-0737,Item II.F.1 Requirements Project stage: Request ML20083E5581983-12-21021 December 1983 Proposed Tech Specs Re Hydrogen & Oxygen post-accident Monitoring Project stage: Other ML20080J1421984-01-16016 January 1984 Hpci/Rcic Operability Limit Ei Hatch Nuclear Plant - Unit 1 Project stage: Other ML20081B4871984-02-0606 February 1984 Application for Amend to Licenses DPR-57 & NPF-5,revising Tech Specs Re Listed TMI Action Plan Items,Per Generic Ltr 83-36 Project stage: Request ML20081B5011984-02-0606 February 1984 Proposed Tech Specs Re Instrumentation Providing Surveillance info,post-accident Sampling & Analysis & post-accident Monitoring Instrumentation Project stage: Other ML20080J1181984-02-0606 February 1984 Proposed Tech Specs 3.5-6-8 & 3.5-16-17 Re Changes to HPCI & RCIC Sys Requirements Project stage: Other ML20080J0681984-02-0606 February 1984 Application for Amend to License DPR-57,changing Tech Spec Requirements for HPCI & RCIC Sys,To Require Sys Operability When Reactor Vessel Pressure Greater than 150 Psig Project stage: Request ML20083P9771984-04-16016 April 1984 Revised Proposed Tech Spec Re Transversing in-core Probe Sys,Hydrogen & Oxygen post-accident Monitoring & HPCI & RCIC Project stage: Other ML20083P9681984-04-16016 April 1984 Revised Application for Amend to Licenses DPR-57 & NPF-5, Changing Tech Specs Re Transversing in-core Probe Sys, Hydrogen & Oxygen post-accident Monitoring & HPCI & RCIC Project stage: Request ML20112H3421985-03-12012 March 1985 Safety Evaluation Supporting Amend 107 to License DPR-57 Project stage: Approval ML20112H3341985-03-12012 March 1985 Amend 107 to License DPR-57,revising Tech Spec to Increase Reactor Pressure Operability Requirement for HPCI & RCIC Sys from 113 Psig to 150 Psig Project stage: Other ML20141A5181986-03-26026 March 1986 Amends 124 & 62 to Licenses DPR-57 & NPF-5,respectively, Revising Tech Specs to Modify Limiting Conditions for Operation & Surveillance Intervals for Hydrogen & Oxygen post-accident Monitors & to Correct Typos Project stage: Other 1983-08-10
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
Georgia Power Corrpany 333 Pmdmont Avenue Atlanta, Georgia 30308 Telepree 404 5266S26 Maang Address.
Post off ce Box 4545 Atlanta. Georgia 30302 g
Georgia Power L T. Gucwa tw sou+tec estnc snt-m Manager Naclear Engineering and Cruef Nuclear Engineer NED-83-433 October 3, 1983 Director of tOclear Reactor Regulation Attention:
Mr. John F. Stolz, Chief Operating Reactors Branch tb. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 WITIORAWAL OF HPCI IND RCIC LCO CHANGE PROPOSAL Gentlemen:
By letter dated April 5, 1982, Georgia Power Company (GPC) proposed an amendment to the Plant Hatch Unit 1 Technical Specifications (Appendix A to the Operating License).
This amendment would have changed the requirements ft the High Pressure Coolant Injection (HPCI) system and the Reactor Core Isolation Cooling (RCIC) system to require both to be operable at reactor pressures greater than 150 psig.
GPC hereby withdraws this proposal from further consideration by the PRC.
Very Truly Yours, A)%zh /&
L. T. Gucwa MJB xc: J. T. Beckham, Jr.
T. V. Greene J. P. O'Reilly Senior Resident Inspector 8310110126 831003 PDR ADOCK 05000321 P
PDR I b 1 i
. _.