MONTHYEARML20083N6361983-03-19019 March 1983 Rev 1 to Design Rept for Weld Overlay Repairs & Flow Evaluations in Recirculation & RHR Sys Project stage: Other ML20151H6271983-04-28028 April 1983 Notification of 830429 Meeting W/Util in Atlanta,Ga to Discuss Results of Ongoing Ultrasonic Insp of Pipes, Details of Crack Length & Depth Determinations,Proposed Repairs & Bases for Repairs Project stage: Meeting ML20071G5191983-05-19019 May 1983 Advises That Startup Expected to Occur Between 830607-14 Assuming Resolution of Outstanding Licensing Issues.Unknowns Still Exist in Schedule Due to Existence of Pipe Flaw Indications.Draft Rept on Weld Repairs Expected by 830530 Project stage: Draft Other ML20071M0931983-05-25025 May 1983 Discusses Possible Imposition of Augmented Leak Detection Requirements for RCS Due to Discovery of Unacceptable Pipe Flaw Indications in Recirculation & RHR Sys.Util Commitments to Incorporate NUREG-0313,Rev 1,Section IV.B.1.a.2 Project stage: Other ML20071M0811983-05-26026 May 1983 Provides Response to IE Bulletin 83-02 Re Stress Corrosion Cracking in large-diameter Stainless Steel Recirculation Sys Piping at BWR Plants Project stage: Other ML20071M0591983-05-26026 May 1983 Submits Info Re Analyses & Repairs of large-diameter Stainless Steel Piping Welds Per Inservice Insp Conducted During 1983 Maint/Refueling Outage Identifying Unacceptable Ultrasonic Indications in Recirculation & RHR Sys Project stage: Other ML20076G1751983-05-26026 May 1983 Corrected Response to IE Bulletin 83-02 Re Inservice Insp Activities Concerning Stress Corrosion Cracking in Large Diameter,Stainless Steel Recirculation Sys Piping at BWR Plants.Weld Exam List Encl Project stage: Other ML20071M1091983-05-31031 May 1983 Draft Rev a to Design Rept for Weld Overlay Repairs & Flaw Evaluation in Recirculation & RHR Sys, Preliminary Rept Project stage: Draft Other ML20071N5891983-06-0202 June 1983 Submits Revs to 830525 Augmented RCS Leak Detection Submittal & Inservice Insp Program Commitment,Incorporating Surveillance Frequencies Per NUREG-0313,Rev 1.Insp &/Or Mod Plans for Recirculation & RHR Sys Piping Forthcoming Project stage: Other ML20072A4391983-06-0707 June 1983 Rev 0 to Design Rept for Weld Overlay Repairs & Flaw Evaluations in Recirculation & RHR Sys Project stage: Other ML20072A4301983-06-0808 June 1983 Forwards Rev 0 to Design Rept for Weld Overlay Repairs & Flaw Evaluations in Recirculation & RHR Sys. Sensor Check Will Be Performed Every 4 Hours in Addition to Interval Required by Tech Specs,Effective at Restart Project stage: Other ML20077F3671983-06-10010 June 1983 Rev 0 to Investigation of Cause of Cracking in Hatch Unit 2 RCS Piping - Comparison W/Unit 1 Cracking Experience Project stage: Other ML20244C3671983-06-20020 June 1983 Summary of 830601 Meeting W/Util in Bethesda,Md Re Util Evaluation & Repair of Cracks in Weld Area of Reactor Heat Removal & Recirculation Sys Piping.Supporting Documentation & Viewgraphs Encl Project stage: Meeting ML20076N3681983-07-0808 July 1983 Order Confirming Licensee Commitments to Repair Recirculation Pipe Sys Cracks & Authorizing Restart Project stage: Other ML20076K7821983-07-0808 July 1983 Commits to Addl Volumetric Testing of Welds to Determine Extent of Intergranular Stress Corrosion Cracking in Recirculation Sys & RHR Sys Piping,Per 830707 Meeting W/Nrc. Proposed Insp Plan Will Be Submitted by 830805 Project stage: Meeting ML20077F3511983-07-12012 July 1983 Forwards Rev 0 to Investigation of Cause of Cracking in Hatch Unit 2 Rcs,Piping - Comparison W/Unit 1 Cracking Experience. Areas Investigated:Fabrication History, Applied & Residual Stresses & Operational History Project stage: Other ML20078M1931983-10-19019 October 1983 Ro:On 831018,drywell Equipment Drain Sump Pump 2G11-C006B Became Inoperable W/Redundant Pump Also Inoperable.Cause Not Stated.Increase of 1.9 Gpm Unidentified Leakage Into Sump Drain Requested for 30-day Period Project stage: Other ML20083N6191984-03-29029 March 1984 Forwards Rev 1 to Nutech Rept, Design Rept for Weld Overlay Repairs & Flaw Evaluations in Recirculation & RHR Sys Project stage: Other 1983-06-10
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
.
l
+
.r 4
APRIL' 2 2 8 1983 Docket No. 50-366 MEMORANDUM FOR:
J. F. Stolz, Chief Operating Reactors Branch f4, LL FROM:
G. W. Rivenbark, Sr. Project Manager Operating Reactors Branch #4, DL
SUBJECT:
FORTHCOMING HEETING WITH GEORGIA POWER COMPANY (GPC)
DATE:
April 29,1983 TIME:
8:30 am LOCATION:
Region II Offices Atlanta, Georgia PURPOSE:
To discuss the results of the ongoing ultrasonic inspection of the pipes at Hatch 2, the details of the crack length and depth determinations, the proposed repairs, and the bases for the repairs.
Georgia Power Company will present essentially all the information it has developed to date to the NRC staff.
Participants:
HRC -
W. Hazel ton, W. Koo, A. Hert, J. Bla ke, B. Crowley GPC -
H. Nix, R. Burns, J. Edwards, P. Ricadello (consultant), D. Pitcarin (consultant), and others Orignatifgtte(1py G. W. Rivenbark, Sr. Project Manager Operating Reactors Branch #4, DL 8305040711 830428 PDR ADUCK 05000366 G
PDR
.0.RBf.4,:,0),hk/d
- omce, v,
GRiy,en,@,,,
n cus - e>
4&t/.83.....
om>
OFFIClAL RECORD COPY usa m n o -335. m Nac ronu sia 0o-802 nacu eaa
Q V
=
6 MEETING NOTICE DISTRIBUTION OPERATING REACTORS BRANCH #4, DIVISION OF LICENSING Docket File NRC PDR L PDR ORB #4 Rdg Project Managar JStolz Glainas BGrimes OELD TIppolito, ORAB HDenton ELJordan, IE JMTaylor. IE ACRS (10)
MSchaaf NSIC Receptionist Regional Administrator Region (s)
II Resident Inspector NRC Meeting
Participants:
WHazelton WKoo AHert JBlake BCrowley
-.. - -