Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217N3001999-10-21021 October 1999 Proposed Tech Specs,Correcting Two Textual Errors & Changing Designation of Referenced Figure ML20217K8731999-10-18018 October 1999 Proposed Tech Specs Revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 ML20212F6941999-09-21021 September 1999 Proposed Tech Specs,Increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank ML20211J0211999-08-31031 August 1999 Proposed Tech Specs Bases Page 91,allowing Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line (Predicted) Uncorrected Solution & on-line (Measured) 3D-Monicore Exposure Corrected Solution ML20211B7051999-08-18018 August 1999 Proposed Tech Specs Revising Reactor Core Spiral Reloading Pattern to Begin Around SRM ML20211B6781999-08-18018 August 1999 Proposed Tech Specs Revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance ML20210D2481999-07-20020 July 1999 Proposed Tech Specs Revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20210D3371999-07-20020 July 1999 Proposed Tech Specs Re Enhancements to Support Implementation of Increased Core Flow ML20209G1671999-07-12012 July 1999 Proposed Tech Specs Revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values ML20196K2951999-06-29029 June 1999 Proposed Tech Specs Pages for Proposed Change 220,revising Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2881999-06-24024 June 1999 Proposed Tech Specs Revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20195J8691999-06-15015 June 1999 Proposed Tech Specs Increasing Stis,Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9531999-06-0909 June 1999 Proposed Tech Specs,Supplementing Proposed Change 213, Allowing Use of ASME Code Case N-560,per GL 88-01 ML20195C8841999-05-26026 May 1999 Proposed Tech Specs Clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3771999-05-0606 May 1999 Proposed Tech Specs Pages ,Eleting Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 ML20206J7231999-05-0505 May 1999 Proposed Tech Specs Pages for Proposed Change 212,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys ML20205S9431999-04-20020 April 1999 Proposed Tech Specs,Revising Reactor Core Spiral Reloading Pattern Such That It Begins Around Source Range Monitor ML20205T4721999-04-19019 April 1999 Marked-up Tech Specs Pages Re Suppl to 990201 Request for Amend to License DPR-28,revising Portions of Proposed Change 208 ML20205S4081999-04-16016 April 1999 Proposed Tech Specs Modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 ML20205S3121999-04-15015 April 1999 Proposed Tech Specs Revised Bases Pages 90,227,164 & 221a, Accounting for Change in Reload Analysis,Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20202E5451999-01-25025 January 1999 Proposed Tech Specs Re Technical Requirements Manual Content ML20206S0661999-01-22022 January 1999 Proposed TS to Change Number 189,proposing Relocation of Fire Protection Requirements from TSs to TRM ML20198D5381998-12-15015 December 1998 Proposed Tech Specs Page 142,correcting Wording to Reflect Previously Approved Wording,Last Revised in Amend 160 ML20198B7421998-12-11011 December 1998 Proposed Tech Specs Changing Wording of Primary Containment Integrity Definition to State That Manual PCIVs Which Are Required to Be Closed During Accident Conditions May Be Opened Intermittently Under ACs ML20197J4631998-12-10010 December 1998 Proposed Tech Specs Section 4.9.2,revising Info Re Calibr of Augmented Offgas Sys Hydrogen Monitors ML20197H0031998-12-0707 December 1998 Proposed Tech Specs Change 209,resolving Emergency Concern Re Potential Operation Outside of LCO Contained in Current TS & Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation ML20155F7421998-11-0303 November 1998 Proposed Tech Specs Incorporating Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G5061998-11-0202 November 1998 Proposed Tech Specs Re ECCS Actuation Instrumentation - LPCI A/B RHR Pump Start Time Delay Requirements & CS Sys A/B Pump Start Delay Requirements ML20151U0131998-09-0404 September 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel Assemblies ML20236H4551998-06-30030 June 1998 Proposed Tech Specs Modifying Table 4.2.1 to Delete ECC Actuation Instrumentation Re Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247E5671998-05-0808 May 1998 Proposed Tech Specs Page 270,containing Wording Inadvertently Deleted from TS Proposed Change 202 ML20247J8121998-05-0808 May 1998 Proposed Tech Specs Reducing Normal Operating Suppression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances That Add Heat to Suppression Pool ML20217P4171998-05-0101 May 1998 Proposed Tech Specs Re Administrative Controls Section ML20217G7131998-04-23023 April 1998 Proposed Tech Specs Change 200 Revising Station SW & Alternate Cooling Sys Requirements ML20217C4591998-03-20020 March 1998 Proposed Tech Specs Re Containment Purge & Vent ML20217A1271998-03-13013 March 1998 Proposed Tech Specs Bases Section 3.10.B,updated to Require That Station Battery,Eccs Instrumentation Battery,Or Uninterruptable Power Sys Battery Be Considered Inoperable If Any One Cell Is Below Specification Cell Voltage ML20202H2611998-02-0606 February 1998 Revised TS Pages Re Change 190,w/typos Corrected ML20197E8481997-12-22022 December 1997 Replacement Pages 160 & 279 & mark-up Pages to Proposed TS Change 190 Containing Editorial Changes ML20203F0131997-12-11011 December 1997 Proposed Tech Specs Revising Current Value for SLMCPR for Cycle 20,next Operating Cycle ML20199K8501997-11-21021 November 1997 Replacement Pages 147,156,157 & mark-up Pages to Proposed TS Change 190,removing Ref to Documents Outside of TS That Define Components to Which Program Applies ML20199J7661997-11-20020 November 1997 Proposed Tech Specs Pages,Revising Requirements for Main Station Batteries ML20217H6931997-10-10010 October 1997 Proposed Tech Specs Revising & Clarifying Requirements for Offsite Power Sources ML20211A6461997-09-18018 September 1997 Proposed Tech Specs,Providing marked-up Pages for Proposed Changes 192 & 193 ML20217Q3311997-08-22022 August 1997 Proposed Tech Specs Pages 245 & 252,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys ML20217N4111997-08-20020 August 1997 Proposed Tech Specs Pages 270 & 270a,updating Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle-specific Thermal Operating Limits to COLR ML20141H1171997-07-11011 July 1997 Proposed Tech Specs,Replacing Pages 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1861997-06-0909 June 1997 Proposed Tech Specs Change 191,updating Section 6.0 Administrative Controls ML20132B5771996-12-10010 December 1996 Proposed Tech Specs 3.13 Re Fire Protection Sys ML20129C4521996-10-17017 October 1996 Proposed Tech Specs,Revising Pages 89,89a & 90 to Incorporate Changes from Amends 148 & 149 ML20128N6031996-10-11011 October 1996 Proposed Tech Specs,Revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.2 1999-09-21
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217N3001999-10-21021 October 1999 Proposed Tech Specs,Correcting Two Textual Errors & Changing Designation of Referenced Figure ML20217K8731999-10-18018 October 1999 Proposed Tech Specs Revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 ML20212F6941999-09-21021 September 1999 Proposed Tech Specs,Increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank ML20211J0211999-08-31031 August 1999 Proposed Tech Specs Bases Page 91,allowing Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line (Predicted) Uncorrected Solution & on-line (Measured) 3D-Monicore Exposure Corrected Solution ML20211B6781999-08-18018 August 1999 Proposed Tech Specs Revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance ML20211B7051999-08-18018 August 1999 Proposed Tech Specs Revising Reactor Core Spiral Reloading Pattern to Begin Around SRM ML20210D2481999-07-20020 July 1999 Proposed Tech Specs Revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20210D3371999-07-20020 July 1999 Proposed Tech Specs Re Enhancements to Support Implementation of Increased Core Flow ML20209G1671999-07-12012 July 1999 Proposed Tech Specs Revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values ML20196K2951999-06-29029 June 1999 Proposed Tech Specs Pages for Proposed Change 220,revising Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2881999-06-24024 June 1999 Proposed Tech Specs Revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20195J8691999-06-15015 June 1999 Proposed Tech Specs Increasing Stis,Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9531999-06-0909 June 1999 Proposed Tech Specs,Supplementing Proposed Change 213, Allowing Use of ASME Code Case N-560,per GL 88-01 ML20195C8841999-05-26026 May 1999 Proposed Tech Specs Clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3771999-05-0606 May 1999 Proposed Tech Specs Pages ,Eleting Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 ML20206J7231999-05-0505 May 1999 Proposed Tech Specs Pages for Proposed Change 212,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys ML20205S9431999-04-20020 April 1999 Proposed Tech Specs,Revising Reactor Core Spiral Reloading Pattern Such That It Begins Around Source Range Monitor ML20205T4721999-04-19019 April 1999 Marked-up Tech Specs Pages Re Suppl to 990201 Request for Amend to License DPR-28,revising Portions of Proposed Change 208 ML20205S4081999-04-16016 April 1999 Proposed Tech Specs Modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 ML20205S3121999-04-15015 April 1999 Proposed Tech Specs Revised Bases Pages 90,227,164 & 221a, Accounting for Change in Reload Analysis,Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20202E5451999-01-25025 January 1999 Proposed Tech Specs Re Technical Requirements Manual Content ML20206S0661999-01-22022 January 1999 Proposed TS to Change Number 189,proposing Relocation of Fire Protection Requirements from TSs to TRM ML20198D5381998-12-15015 December 1998 Proposed Tech Specs Page 142,correcting Wording to Reflect Previously Approved Wording,Last Revised in Amend 160 ML20198B7421998-12-11011 December 1998 Proposed Tech Specs Changing Wording of Primary Containment Integrity Definition to State That Manual PCIVs Which Are Required to Be Closed During Accident Conditions May Be Opened Intermittently Under ACs ML20197J4631998-12-10010 December 1998 Proposed Tech Specs Section 4.9.2,revising Info Re Calibr of Augmented Offgas Sys Hydrogen Monitors ML20197H0031998-12-0707 December 1998 Proposed Tech Specs Change 209,resolving Emergency Concern Re Potential Operation Outside of LCO Contained in Current TS & Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation ML20155F7421998-11-0303 November 1998 Proposed Tech Specs Incorporating Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G5061998-11-0202 November 1998 Proposed Tech Specs Re ECCS Actuation Instrumentation - LPCI A/B RHR Pump Start Time Delay Requirements & CS Sys A/B Pump Start Delay Requirements ML20196A7851998-10-0909 October 1998 Rev 19 to Vynp IST Program Plan ML20151U0131998-09-0404 September 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel Assemblies ML20237E9571998-08-27027 August 1998 Start-Up Test Rept Vynp Cycle 20 ML20236H4551998-06-30030 June 1998 Proposed Tech Specs Modifying Table 4.2.1 to Delete ECC Actuation Instrumentation Re Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247J8121998-05-0808 May 1998 Proposed Tech Specs Reducing Normal Operating Suppression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances That Add Heat to Suppression Pool ML20247E5671998-05-0808 May 1998 Proposed Tech Specs Page 270,containing Wording Inadvertently Deleted from TS Proposed Change 202 ML20217P4171998-05-0101 May 1998 Proposed Tech Specs Re Administrative Controls Section ML20217G7131998-04-23023 April 1998 Proposed Tech Specs Change 200 Revising Station SW & Alternate Cooling Sys Requirements ML20217C4591998-03-20020 March 1998 Proposed Tech Specs Re Containment Purge & Vent ML20217A1271998-03-13013 March 1998 Proposed Tech Specs Bases Section 3.10.B,updated to Require That Station Battery,Eccs Instrumentation Battery,Or Uninterruptable Power Sys Battery Be Considered Inoperable If Any One Cell Is Below Specification Cell Voltage ML20202H2611998-02-0606 February 1998 Revised TS Pages Re Change 190,w/typos Corrected ML20197E8481997-12-22022 December 1997 Replacement Pages 160 & 279 & mark-up Pages to Proposed TS Change 190 Containing Editorial Changes ML20203F0131997-12-11011 December 1997 Proposed Tech Specs Revising Current Value for SLMCPR for Cycle 20,next Operating Cycle ML20199K8501997-11-21021 November 1997 Replacement Pages 147,156,157 & mark-up Pages to Proposed TS Change 190,removing Ref to Documents Outside of TS That Define Components to Which Program Applies ML20199J7661997-11-20020 November 1997 Proposed Tech Specs Pages,Revising Requirements for Main Station Batteries ML20217H6931997-10-10010 October 1997 Proposed Tech Specs Revising & Clarifying Requirements for Offsite Power Sources ML20211A6461997-09-18018 September 1997 Proposed Tech Specs,Providing marked-up Pages for Proposed Changes 192 & 193 ML20217Q3311997-08-22022 August 1997 Proposed Tech Specs Pages 245 & 252,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys ML20217N4111997-08-20020 August 1997 Proposed Tech Specs Pages 270 & 270a,updating Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle-specific Thermal Operating Limits to COLR ML20141H1171997-07-11011 July 1997 Proposed Tech Specs,Replacing Pages 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1861997-06-0909 June 1997 Proposed Tech Specs Change 191,updating Section 6.0 Administrative Controls ML20149M7451997-01-24024 January 1997 Startup Test Rept,Vermont Yankee Cycle 19 1999-09-21
[Table view] |
Text
1 D 000 -
E8M Du O UI' ~
gg VYNPS .
n N
023.12 LIMITING CONDITION FOR OPERATION 4.12 SURVEILLANCE REQUIREMENT ora 00 u ~
.N 6" moved and one in an adjacent quadrant. For an SRM Thereafter, the SRMs shall be checked daily to be considered operable the f ollowing conditions f or response, shall be satisfied:
- 1. The SRM shall be inserted to the normal operating level. (Use of special movable, dunking type detectors during initial f uel loading and major core alternations in place of normal detector is permissible as long as
! the detectors is connected into the proper circuitry which contain the required rod blocks). .
- 2. The SRM shall have a minimum of 3 cps with 8
]
all rods fully inserted in the core.
- 3. Pr,ior to spiral unloadirg, the SRMs shall be Prior to spiral unicadirg or eloading, r t'IE i proven operable as stated in Sections SRMs shall be functionally tested. Prior to 3.12.B.1 and 3.12.B.2 above, however, during spiral reloading, the SRMs shall' be checked i
spiral unloading the count rate may drop f or neutron response.
below 3 cps.
- 4. Prior to spiral reloading, two diagonally t adjacent fuel assemblies, which have l previously accumulated exposure in the
! reactor, shall be loaded into their designated core positions next to each of the
}
j I 4 SRMs to obtain the required 3 cps. Until these eight bundles have been loaded, the 3 l cps requirement is not necessary.
1 l C. Fuel Storage Pool Water Level C. Fuel Storage Pool Water Level i
Whenever irradiated fuel is stored in the Whenever irradiated fuel is stored in the
! fuel storage pool the pool water level shall fuei .icrage pool, the pool level shall be d
be maintained at a level of at least 36 feet, recorded daily.
- 183 I
1 _ _ _ _
VYNPS.
3.12 LIMITING CONDITION FOR OPERATION 4.12 SURVEILLANCE REQUIREMENT
- 1. The reactor mode switch shall be locked in 1. This surveillance requirement is the same as the " Refuel" position. The refueling that given in Specification 4.12.A.
- interlock which prevents more than one control rod from being withdrawn may be bypassed on a withdrawn control rod af ter the fuel assemblies in the cell containing (controlled by) that control rod have been removed from the reactor core. All other refueling interlocks shall be operable.
- 2. SRMs shall be operable in the core quadrant 2. This surveillance requiretent is the same as where fuel or control rods are being moved, that given in Specification 4.12.B and in an adjacent quadrant. The requirements for an SRM to be considered operable are given in Specification 3.12.B.
- 3. If the spiral unload / reload method of core alteration is to be used, the following conditions shall be met:
- a. Prior to spiral unload and reload, the SRMs shall be proven operable as stated in Specification 3.12.B1 and 3.12.B2.
However, during spiral urloading, the count rate may drop below 3 cps.
I
- b. The core may be spirally reloaded to either the original configuration or a different configuration in the reverse sequence of that used to unload, with the exception that two (2) diagonally adjacent fuel assemblies, which have previously accumulated exposure in the reactor, shall be loaded into their designated core positions next to each of the four (4) SRMs to obtain the required 3 cps. Until these eight (8) bundles have been loaded, the 3 cps rer.ui rement is not necessary. 185
VYNPS 3.12 LIMITING CONDITION FOR OPERATION 4.12 SURVEILLANCE REQUIREMENT-
! Following insertion of the initial.eight
- (8) bcndles, the reactor will be l spirally reloaded from the center cell outwards, until the core is fully loaded,
]
i
- c. At least 50% of the fuel assemblies to be reloaded into the core shall have l previously accumulated a minimum exposure of 1000 Mwd /T.
F. Fuel Movement F. Fuel Movement l Fuel shall not be moved or handled in the Prior to any fuel handling or movement in the reactor core for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following reactor reactor core, the licensed operator shall-l shutdown to cold shutdown conditions. verify that the reactor has been in the cold shutdown condition for a minimum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
G. Crane Operability G. Crane Operability l
j 1. The Reactor Building crane shall be 1. a. Within one month prior to spent operable when the crane is used for fuel cask handling operations, an
, handling of a spent fuel cask. inspection of crane cables, i sheaves, hook, yoke, and cask 3
lifting trunnions will be made.
These inspections shall meet the requirements of ANSI Standard 185-a
VYNPS 3.12 LIMITING CONDITION FOR OPERATION 4.12 SURVEILLANCE REQUIREMENT B30.2, 1967. A crane rope shall be replaced if any of the replacement criteria given in ANSI B30.2.0-1967 are met.
- b. No-load mechanical and electrical tests will be conducted prior to lif ting the empty cask from its transport vehicle to verify proper operation of crane controls, brakes and lifting speeds. A functional test of the crane brakes will be conducted each time _ an empty cask is lifted clear of its transport vehicle.
- 2. Crane Travel 2. Crane Travel 4 Spent fuel casks shall be prohibited Crane travel limiting mechanical stops from travel over irradiated fuel shall be installed on the crane trolley assemblies. rails prior to cask handling operations to prohibit cask travel over irradiated fuel assemblies.
H. Spent Fuel Pool Water Temperature H. Spent Fuel Pool Water Temperature Whenever irradiated fuel is stored in the Whenever irradiated fuel is in the spent fuel spent fuel pool, the pool water temperature pool, the pool water temperature shall be shall be maintained below 1500F. recorded daily. If the pool water temperature reaches 1500F, all refueling operations tending to raise the pool water temperature shall cease and measures taken immediately to reduce the pool water temperature below 1500F.
185-b
I j
VYNPS-Bases:
1 2
3.12 & 4.12 REFUELING 4 A. During refueling operations, the reactivity potential of the core-is being altered. It is necessary to require certain interlocks and restrict certain refueling procedures such that there is assurance that inadvertent
,^
criticality does not occur.
To minimize the possibility of loading fuel into a cell containing no control rod, it is required that all 4
control rods are **11y inserted when fuel is being loaded into the reactor core. This requirement assures that
! during refueling he refueling interlocks, as designed, will prevent inadvertent criticality. The core
- reactivity limitat' a of Specification 3.2 limits the core alterations to assure that the resulting core loading
! can be controlled with the Reactivity Control System and interlocks at any time during shutdown or the following operating cycle, j
j The addition of large amounts of reactivity to the core is prevented by operating procedures, which are in turn i backed up by refueling interlocks on rod withdrawal and movement of the refueling platform. When the mode i switch is in the " Refuel" position, interlocks prevent the refueling platform from being moved over the core if
! a control rod is withdrawn and fuel is on a hoist.
i
! Likewise, if the refueling platform is over the core with fuel on a hoist, control rod motion is blocked by the-interlocks. With the mode switch in the refuel position, only one control rod can be withdrawn.
! B. The SRMs are provided to monitor the core during periods of station shutdown and to guide the operator during j refueling operations and station startup. Requiring two operable SRMs in or adjacer.t to any core quadrant where
{ fuel or control rods are being moved assures adequate monitoring of that quadrant during such alterations. The requirement of 3 counts per second provides assurance that neutron flux is being monitored. Under the special t j condition of complete spiral core unloading, it is expected that the count rate of the SRMs will drop below 3 cps before all the fuel is unloaded. Since there will be no reactivity additions, a lover number of counts will not present a hazard. When all of the fuel has been removed to the spent fuel storage pool, the SRMs will no
! longer be required. Requiring the SRMs to be operational prior to fuel removal assures that the SRMs are
, operable and can be relied on even when the count rate may.go below 3 cps.
Prior to spiral reload, two diagonally adjacent fuel assemblies, which have previously accumulated exposure in j the reactor, will be loaded into their designated core positions next to each of the 4 SRMs to obtain the required 3 cps. Exposed fuel continuously produces neutrons by spontaneous fission of certain plutonium isotopes, photo fission, and photo disintegration of deuterium in the moderator. This.neutrcn production is normally great enough to meet the 3 cps minimum SRM requirement, thereby providing a means by.which SRM response may be demonstrated before the spiral reload begins. During the spiral reload, the fuel will be loaded in the I reverse sequence that it was unloaded with the exception of the initial eight (8) fuel assemblies which are loaded next to the SRMs to provide ~a means of SRM response.
- 186
> VYNPS 3.12'& 4.12 (Continued) -
C. To assure that there is adequate water to shield and cool the irradiated fuel assemblies ~ stored'in the pool, a minimum pool water level is established. This minimum water level of 36 feet is established because it would be a significant change from the normal level, well above a level to assure adequate cooling (just above active fuel).
J 1
1 b
186-a i
-. . ._ = - .
VYNPS
~
1 3.12 & 4.12 (Continued)
- D. DurJ ng certain periods, it is desirable to perfona maintenance on two control rods and/or control rod drives at
! the.same time. This specification provides assurance that inadvertent criticality does not occur during such
- maintenance.
i The maintenance is perf ormed with the mode switch in the " Refuel" position-to provide the refueling interlocks
- normally available during refueling operations as explained in Part A of these Bases. in order te withdraw a second control rod af ter withdrawal of the first rod, it is necessary to bypass the refueling interlock on the first control rod which prevents more than one control rod from being withdrawn at the same time. The i requirement that an adequate shutdown margin be demonstrated with the control rods remaining in service ensures that inadvertent criticality cannot occur during this maintenance. The shutdown margin is ~ verified - by
! demonstrating that' the core is shut down even if the strongest . control rod remaining in service is fully withdrawn. Disarming the directJonal control valves does not inhibit . control rod scram capability.
E. The intent of this specification is to permit the unloading of a significant portion of' the reactor core for such purposes as inservice inspection requirements, examination of the core support plate, etc. This specification provides assurance that inadvertent criticality does not occur during such operation.
! This operation is performed with the mode switch in the " Refuel" position to provide the refueling interlocks
. normally available during refueling as explained in the Bases for Specification 3.12.A. In order to withdraw more than one control rod, it is necessary to bypass the refueling interlock on each withdrawn control rod which
, prevents more than one control rod from being withdrawn at a time. The requirement. that the fuel assemblies in the cell controlled by the control rod be removed from the reactor core before the interlock can be bypassed ensures that withdrawal of ancther control rod does not result in inadvertent criticality. each control rod l essentially provides reactivity control for the fuel assemblies in the cell associated with that control rod.
Thus, resonal of an entire cell (fuel assemblies plus control rod) results in a ' lower reactivity potential of the core.
! One method available for unloading or reloading the core is the spiral unload / reload. A spiral unloading i
pattern is one by which the fuel in the outermost cells (four fuel bundles surrounding a control rod) is removed
! l first. Unloading continues by unloading the remaining outermost fuel by cell spiralling inward towards the
- I center cell which is the last cell removed. ' Spiral reloading is reverse of unloading, with the exception that 4
two (2) diagonally adjacent bundles, which have previously accumulated exposure in-core, are placed next to each of the 4 SRMs before the actual spiral reloading begins. The spiral reload then begins in the center cell and spirals outward until the core in fully loaded. Additionally, at least 50% of the fuel assemblies to be i
I 187 I
I
VYNPS 3.12 & 4.12 (Continued) ,
! reloaded into the core shall have previously . accumulated a minimum exposure of 1000 Mwd /T to ensure the prerence -
of a minimum neutron flux as described in Bases Section 3.12.B.
F. The intent of this specification is to assure.that the reactor core has been in the cold shutdown corsdition for
! at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following power operation and prior to fuel handling or movement. The safety analysis - for the -
4 postulated refueling accident assumed that the reactor had been shut down for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for fission product decay
' prior to any fuel handling which could result in dropping of a fuel ~ assembly.
G. The operability requirements of the reactor building crane ensures that the redundant features of the crane have been adequately inspected just prior to using it for handling of a spent fuel cask. The redundant hoist cyotem ensures that a load will not be dropped for any postulated credible single component failures. Details of the J design of the redundant features of the crane and specific testing requirements for the crane.are delineated in the Vermont Yankee document entitlad " Reactor Building Crane Modification" (Deces'cer 1975).
l H. The Spent Fuel Fool Cooling System is designed to maintain the pool water temperature below 1250F during
- normal refueling operations. If the reactor core is completely discharged , the temperature of the pool water may increase to greater than 1250F. The RHR System supplemental fuel poc'., ccoling may be used under these l conditions to maintair. the pool water temperature less than 1500F.
l y
t
- 187-a i
L