ML20069F676

From kanterella
Jump to navigation Jump to search
Public Version of Revision 1 to Emergency Plan Implementing Procedures EP G-3, Notification of Offsite Organizations & EP OR-1, Offsite Support & Assistance
ML20069F676
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/12/1982
From:
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML16340C835 List:
References
PROC-820812-01, NUDOCS 8209280200
Download: ML20069F676 (38)


Text

- .

.e m

EMERGENCY PLAN IMPIRENTING PROCEDURES TABLE OF CONTENTS Volume 3A TITLE REV OP-0 Reactor Trip With Safety Injection 3 OP-1 Loss of Coolant Accident 5 OP-2 loss of Secondary Coolant 2 OP-3A Steam Gen Tube Failure 4 OP-3B Minor Steam Gen Tube Failure 1 OP-4 Ioss of Electrical Power 3 OP-5 Reactor Trip Without Safety Injection 5 OP-G Bnergency Boration 5 OP-7 loss of Condenser Vacuum 2 OP-8 Control Room Inaccessibility 5 OP-9 Ioss of Reactor Coolant Immp j 3

OP-10 loss of Auxiliary Salt Water 2 OP-11 Ioss of Component Cooling Water 2 OP-12 Malfunction of Auto Reactor Control 1 O(> Systen OP-12A Failure of a Control Bk to 2 Move in Auto OP-12B Cont Withdrawal of a Control Rod Bank 3 OP-12C Cont Insertion of a Control Rod Bank 2 OP-12D Control Rod Pos Indication Sys Malfunc 3 OP-12E Control Rod Misalignment 2 OP-12F Dropped Control Rod 2 OP-13 Malfunction of Reactor Press Control Systen 2

( OP-14 High Activity in Reactor Coolant 2 OP-15 Ioss of Feedwater 4 OP-16 Nuclear Instrumentation Malfunctions 3 OP-17 Malfunction of RHR System 2 ,

OP-18 01arging or letdown Line Failure 2 OP-19 Malfunction of Reactor Makeup Control 2 OP-20 Excessive Reactor Coolant Systen 2 Leakage l O

~Q 0209280200 820915 PDR ADDCK 05000275

F PDR A _

. TITLE REV OP-21 Ioss of A Coolant Imop RTD 2

,A OP-22 Bnergency Shutdown 1 OP-23 Natural Circulation of Reactor Coolant 2 i 'OP-24 Ioss of Containment _ Integrity 1 OP-25 Tank Ruptures 1 OP-26 Excessive Feedwater Flow 1 OP-27 Irradiated Fuel Damage _

1 OP-28 Startup of an Inactive Reactor Coolant Ioop 1 OP-29 Excessive Ioad Increase 1 OP-30 Inadvertent Ioad Fuel Assly Improper Ibs 1 OP-31 Systen Under Frequency 1 OP-32 Rod Ejection 1 OP-33 Ioss of Instrument Air 1 OP Generator Trip - Full Inad Rejection 1 OP-35 Ioss of Vital or Non-Vital Instr AC Sys 1 OP-36 Turbine Trip 1 OP-37 Ioss of Protection Systen Channel 1 OP-38 Anticipated Transient Without Trip (A1YT) 3 OP-39 BCP Incked Rotor Accident i OP-40 Accidental Depressurization of MS Systen 1 OP-41 Hydrogen " Explosion" Inside Containment 1 OP-44 Gaseous Voids in the RCS 2 R-1 Per Injury (Rad Related) And/Or Overexp 7 R-2 Rel of Airborne Radioactive Materials 3 R-3 Rel of Radioactive Liquids 3 R-4 High External Radiation 3 R-5 Radioactive Liquid Spill 3

( R-6 R-7 Radiological Fire Transportation Accidents 2 5

M-1 Bnployee Injury (Nonradiological) 6 M-2 Injury to Nonenployee (Third Party) 5 M-3 Chlorine Release 4' M-4 Earthquake 6 M-5 Tsunami Thrning 4 M-6 Nonradiological Fire 6 l

M-7 Oil Spill ISO and Clean Up Procedure 3-h O

. , - , - , , . . . - - , . . - . , , . - - - , - , - - n-. . . , y----- ,. - - . . , - , - - , -,~, ..- ,-g, . - - - , - .,

- TITLE REV G-1 Dnergency Classification and Dnergency Plan 2 Activation 0- G-2 Establishment of the On-Site Dnergency Organization 1

G-3 Notification of Off-Site Organizations 1 G-4 Personnel Accountability and Assenbly 2 G-5 Evacuation of Nonessential Site Personnel 0 0

O

NuusER EP G-3 Pacific Gas'and Electric Company LOGS #E REVISION 1 O DEPARTMENT OF NUCLEAR PLANT OPERATIONS 1 AND 2 DATE PAGE 7/7/82 1 OF 3 DIABLO CANYON POWER PLANT UNIT NO(S)

EMERGENCY PROCEDURE g TITLE: NOTIFICATION OF 0FFSITE ORGANIZATIONS 1

APPROVED:

DATE PLANTMANAGER(/

SCOPE This procedure describes the steps to be taken to provide both the initial and follow-up notifications to Federal, State, Local, and Company off-site emergency organizations following the initiation of one of the four classes of Emergency Action Levels as described in EP G-1 " Accident Classification and Emergency Plan Activation."

Notification of off-site organizations which would respond on-site to specific emergency situations, (security threat, personal injury or fire) are discussed in the individual procedures dealing with those specific types of emergencies. If required, requests for this assistance receive priority over notification calls.

GENERAL

1. Notification of San Luis Obispo County should be made within 15 minutes for the Unusual Event classification and sooner (consistent with the need for other emergency actions) for other classes. This time is measured from the time at which the Shift Foreman recognizes I that events have occurred which make declaration of an emergency appropriate.
2. Offsite emergency organizations which require prompt notification in an emergency situation are listed on Form 18-10298 " Required Offsite Organization Call List. The agencies are listed in the order in which the notifications should be performed. The initial contact with an off-site agency should provide as much information concerning the state of the emergency as is available at the time the notification is made. Form 69-10581 " Initial Emergency Notification Form" is provided as a guide to be used in providing the initial notification of an emergency.

It is important that the initial notification of off-site support organizations be made promptly and with as much pertinent information as is available. It should not be delayed if all the information contained on Form 69-10581 is not imediately available. t Figure 1 " San Luis Obispo County Protective Action Zones and Sectors from Plant" and Table 1 "PGandE Recommended Initial General Public DC0042 IVII

NUMBE P G-3

. DIABLO CANYON POWER PLANT UNIT NO(S) 1 AND 2 DATE 7/7/82 v PAGE 2 OF 3 TITLE: NOTIFICATION OF 0FFSITE ORGANIZATIONS Protective Action Criteria" are provided to assist in determining appropriate protective actions to recommend for the general public.

Refer to EP R-2 " Release of Airborne Radioactive Materials" for additional protective action exposure criteria.

3. Followup status reports should also consider including the information that is appropriate on Form 69-10262 " Radiological Emergency Status Form, Form 18-10295 " Plant Status Emergency Form" and Form 18-10296 Onsite/0ffsite Radiological Field Monitoring and PIC Emergency Status Form," where such information is requested and not available to the organization by electronic data transmission.
4. All notifications and contacts with off-site amergency organizations made throughout the course of the eniergency snould be recorded on Form 69-10298 " Required Offsite Organization Call List" or use Form 69-9221 i " Emergency Notification Record" or similar log.

l INITIATING CONDITIONS Notification of off-site emergency organizations shall be initiated by the t')

( Shift Foreman when he declares an Unusual Event, Alert, Site Aree Emergency, or General Emergency in accordance with EP G-1, " Accident Classification and Emergency Plan Activation."

I IMMEDIATE ACTIONS

1. Upon declaration of an Unusual Event, the Shift Foreman, or his designated representative, shall man a telephone in the Control Room and proceed to contact off-site organizations.
2. Upon declaration of an Alert, Site Area Emergency, or General Emergency, the Shift Foreman acting as the interim Site Emergency Coordinator shall appoint an interim Ememncy Liaison Coordinator to perform the initial contact of off-site organizations initially from the Control Room and then from the Technical Support Center (TSC). l SUBSE0 VENT ACTIONS,
1. A verbal summary of actions taken to close out an Unusual Event shall be provided each organization notified by the Site Emergency Coordinator or his designated representative.
2. When personnel are available the TSC will be activated for an Alert or higher classification according to EP EF-1, " Activation of the ,

Technical Support Center." The Emergency Liaison Coordinator shall man his post in the TSC Operations Center and assume responsibility for contact with off-site emergency organizations from the person in N the Control Room.

DC0042 2VII

N G-3 DIABLO CANYON POWER PLANT UNIT NO(S) l' AND 2

. DATE 7/7/82 PAGE 3 OF 3 TrTLE: NOTIFICATION OF 0FFSITE ORGANIZATIONS

3. Status updates should be provided approximately every 15 minutes to I ea'ch organization.
4. Status updates to San Luis Obispo County will be provided by the EOF once it is manned in accordance with Emergency Procedure EF-3

" Activation of the Emergency Operations Facility." Updates to California OES and NRC will continue from the TSC until these i organizations establish their own comunication channels and rio longer i need status reports.

i

5. Status reports to other organizations on Form 69-10298 are only
required as detemined necessary by the Site Emergency Coordinator for
the organization to provide their support function.

ATTACHMENTS

1. Figure 1 " San Luis Obispo County Protective Action Zones and Sectors from Plant"

, 2. Form 69-10298 " Emergency Offsite Organization Call List"

3. ' Mobile Phone and Pager Instructions

, 4. Form 69-10581 " Initial Emergency Notification Fom"

5. Form 69-9221 " Emergency Notification Record"
6. Fom 69-10262 " Radiological Emergency Status Form"
7. Fom 69-10295 " Plant Status Emergency Fom"
8. Fom 69-10296 "Onsite/Offsite Radiological Field Monitoring and PIC Emergency Status Form" SUPPORTING PROCEDURES j EP G-1, " Accident Classification and Emergency Plant Activation" EP EF-1, " Activation of the Technical Support Center"

! EP EF-3, " Activation of the Emergency Operations Facility

EP R-2, " Release of Airborne Radioactive Materials" i

i 4 ,

DC0042 3VII

~':_ . - - __ -_ _ - - --___

Page 1 1 TABLE V

' PG and E Recommended Initial General P L.ic Protective Action Criteria

+

Releasg Site 3 Appropriate Recommended 4 Emergency 3 Status Boundary Dose Initial Protective Action Classification .

None B-Alert All NA

<500 mR (Total W.B.) None C-Site Area Emergency All

" B-Potential Release >500 mR (Total W.B.) C-Evacuate transients i.

(Montana de Oro Visitors, agricultural workers, etc.) in the low population zone (PAZ's l 1 and 2) starting with _the affected sector and two adjacent sectors.

" B-Evacuation of the Site, and

" C-Iminent Release or PAZ l.

D-Release is Occuring None

" E-Release has Occured but stopped A-No Release NA D-Evacuate the site and low D-General Emergency population zone (PAZ's 1 and 2) or starting with the affected B-Potential Release sector and two adjacent sectors. Alert the public in

, the' basic emergency planning zone using the Early Warning System Sirens and EBS Broadcasts.

D-General-Emergency C-Iminent Release NA D-(as above) and shelter or personnel in the affected D-Release is Occuring sector and two adjacent sectors or to the boundary of the Basic E-Release has Occured but EPZ. Specify a further stopped distance from the plant if a total dose >500 mR is projected at further distances.

1. Refer to item 6 of Form 69-10581.
2. Refer to item 4 of Form 69-10581.
3. Calculate in accordance with EP R-2.
4. Refer to item 8 of Form 69-10581.

DC0042 4I

F a 2 s si ,]3 I

if 3lnl9 '

j

]

I, <l g1 'l pi $il! IaI!:s0

>g>

b 4  ! ;:n tl lt t I}

g i Il = is 5 ::II .p ;; si itimlil]j6[ll!IIsnsu..gj';]);ll"3is5In;IIis I

.3 g)i1 1 [  ; s i i] i i I 2

3 :s jh; ja, ' j h

~  ?- L '

m . . . .. . . . . . ._.m.

@ @ g ~-.[

E .- .

,~.

g I '

k ,-

hy lc'-. 9

in killl

)

' pe I <

. IDQle y.

---., x h, 's

}

(e,

,)

'n

, N0I . -

f l

(5 uL

. h'; i.'If

  • ]

f

}s N ' ~ ./ +=[ p/ , '

\

Y y g ,

.: s, ffb \6; gpily, n

. w- s e

,$/ ~

j,AgAn.

y t .3 en, q.m 'tti j W a ga n

, gg

- ., A i '%

l

' f,' ',,A q 3 M

3t ilg *

' b- * \ .

~

e is . '

y lgl &y' Hi @y$ *.bl'im.y

'n;ha ,.

6;;gic I I

,j , , , , '

l-p

-j t=

l

/s. .

  • yQ m

..q.]

g ,.

' '9 B 5 e y

/

.m

... m .. m u m i .

om .

EMERGEhCY OFFSITE ORGANIZATION CALL LIST ORGANIZATION-CONTACT POINT AND COMMUNICATIONS 1 THROUGH 4 ARE REQUIRED EMERGENCY + EMERGENCY +

NOTIFICATIONS FOR ALL EMERGENCY CLASSIFICATION UE CLASSIFICATION UE CLASSIFICATIONS: A STATUS A STATUS UPDATE THESE ORGANIZATIONS ABOUT CONTACT? PERSON SAE FORM CONTACT? PERSON SAE FORM EVERY 15 MINUTES (YES, N O) TIME CONTACTED GE NUMBER (Y ES. N O) TIME CONTACTED GE NUMBER i _

3. SAN LUIS DBlSPO INITIAL COUNTY SHERIFF'S a. AUTOMATIC TIE LINE IN OPERATIONS CCNTROL R00M AND TSC CENTER (PRIMA RY) .

~

b.

c. TELEPHONE:

t 1

2. CORPORATE EMERGENCY - INITIAL RESPONSE ORGANIZATION OFFICE OFFICE
1. .

RECOVERY MANAG ER in emrrro in vnwucrun 4 _ _ _

~

L L L A A A I

I I T T T I

I I N N N I I I .

~

~

3, 3 R O 0 N A ',[

, ,d I

i ql

_ O F O' E C ~

NM S N I

C IO N IL O O

N TO E I R -

E A AI -

1 R C T TL : - .

J. F I AE CO E ~ _

0 N FZ V I T R N _

H._,

A I I TN OB T O ~ N S O A A A M

NH O R N G O P S O CX - L E MRE T N S R T R OH A N

E ".

F Y *T T,

U A. I CFk C

C 1 2 t 2 3 - N RN( E H L

O EE AT '

Y R i

- V O R P C N F I O

R LR O E S E R E T J T O S O T A

- A N L E C N N I M EC T C - T O

C C

H WE O RE ETE HAL T

CI IV FR FE O

P S

E R

- A L

U E

C A EO SS Y~E k E

.K. -

N E

S E

R x

0S G NE R T

P A

CRB T OA AP N AY Y

C E

R O N OH PT R

D

)C l

C T O P N E T

Nr n

S IC N S E E U /> R E l

O P RU S NN E R RI S E S R N C 0 R O L 1 m Y

I O DCI F RE C E AS NN CL - NN RM, OG RT EI TI 5 AJ G  : F I R EN LM NR A

% s NR ! .

R E LE ME CM E E LY -

l E T EG D UO i

AM I T C EN R N O S E N CE NC A N N

I CM O 3

4.

I l l ~ l

, p by.. c . .. . . 9 e n.,; l l f l I

?.O T/F Y ONL Y I?! CASE I -

ggirggt OF RADIOaCTlW RE I 1- l l l'

  • E ASc itJ TO THE OC: J\ '

'SEE EME409.C '

  • v 2. REQU EST C ALIFORNI A CEDUPE R.Js _. _ 'JFFICE OF EMERGENCY s.C AL REGION AL WATEh SERVICES TO PERFORM QUALITY CONTROL 80. NOTIFICATION (OFF CENTR AL C0 AST REGl0N NORMAL HOURS) f FXECUTIVE OFrlCEp SEE NO 3 ABOVE TO SAN LUIS OBISPO CALL l NO T FY ONL Y FOR AN ALER T OR HIGHER CLASSIFICA TION li . 4STITUTE OF NUCLEAR i -c'

~

POVsER OPERATIONS kE AVE MESSAGE WITH AUTOM ATIC ANSWERING '

SE RVICE (O F F. NORM AL c y g g g t N c y p c ',e ep ;E rr.NTt g I

% ~1F f G!dL f !F TECHNICAL. ON-SITE OR AfA TERIALS ASSISTANCE ON REACTOR S> STEMS IS NEEOEO

~~ INiiI AL PRO dtOE PL AN T EAffRGENCY NuAfdER' _

' FOR REP} .

7. WESTINGHOUSE l MONROEVILLE NUCLE AR CENTER ELECTRIC COMPANY j _2 - ~ - C ' " " ' ~ ,

L-. a

, OR

--t

_ _ . . - - - - - ~ . _ _ , _

FIELO SERVICE MANAGER GEORGE OILLON 1st ALTERNATE CLIFF LISSENDEN 2nd ALTERNATE E0 SCHOEN l

M 'l - LINF EQUIP"!., ..:*H ANSWERING OEVICE WHICH WILL TAKE YEnACTS AND CALL ALTERNATES AUTOMATICALLY le sN ABLE T' CONTACT ABOVE. REFER TO EP OR 1.

Page 1 of 1

[ ATTACHMENT 3 REC 0VERY MANAGER MOBILE PHONE AND PAGER INSTRUCTIONS

1. Mobile Phone Instructions Recovery Manager's mobile radio telephone number: { j
a. Dial "0" for operator and ask for the Mobile Conference Operator; then give the phone number and general location of automobile.

When calling from within General Office, dial 7010 and ask PGandE operator to connect with PT&T operator and repeat as above.

2. Pager Instructions--Nuclear Power Generation
a. Message to be left with the General Office Communications P8X Operator (short tone):

/

Call [ [ land request that the particular indi-vidual/ beeper code be paged. Leave message with operator for the irdividual you are paging. The Communications PBX Operator will activate the radio pager for that individual by dialing the unique PT&T number (50 mile radius of San Francisco) pager or the extended coverage PT&T number (if in San Luis Obispo area) assigned to that pager.

b. Message to be left with the Intrastate Radio-Telephone Commercial Message Operator (long tone):

)

Call ' da'n~d request that the particular beeper code be p h -~t. eave message with operator for the individual you are paging.

c. If you want both short and long tones to be paged for one beeper, you may request the operator in Step 2.a above to pass the message to the operator in Step 2.b above, or vice-versa. Both operators are capable of paging in either tone. The type of tone denotes where the person being paged is to call to receive his

, message (s).

Unique Extended Coverage

d. Name Beeper Code PT&T Number PT&T Number ,

J. D. Shiffer

~

ffy Yf /

J. D. Townsend _] ] i, J.'

DC0042 SIV

+**=.ama- +o+..+%e.+= . . - = , . ,

===.- ==a. w -ew- m. . * - - - = e=== .-

69-10581 7/82 (100) Page 1 of 2 PACIFIC GAS AND ELECTRIC COMPANY

\ NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT NOS. 1 AND 2 INITIAL EMERGENCY NOTIFICATION FORM Date / / Time AM/PM Status #

(Form Completed) (Number Sequentially)

Person Authorizing Report (DCPP Only)

Site Emergency Coordinator Data Sheet Completed By (DCPP Only)

Identify yourself, state the call is to provide initial notification of an emergency condition at Diablo Canyon Power Plant, and provide the following information:

1. Describe what happened:

J. Unit Involved [A] 1 [B] 2 Time incident started AM/PM

4. Situation Involves

[A] No Release [C] Inuninent Release [E] Release has occured,

[B] Potential Release [D] Release is Occuring

5. Offsite Assistance Fire (Cal. Dept. of Forestry) 1 ;A ' Has been requested Medical (SLO Ambulance / French Hospital) i ,B; Has been requested Law Enforcement (SLO County Sheriff) .C., Is/has been requested
6. Emergency Classification - Provide standard message or modify as required by the '

situation. Note any modification made.

Message Classification (for SLO County / Calif. OES)

[A] Unusual Event Notification of key emergency organization personnel is required at this level, but no further response is necessary.

[B] Alert . Notification of all emergency response organizations and activation of the E0C and other O response centers is required.

PGandE is activating the E0F.

DC0042 i l

j

69-10581 7/82 (100) Page 2 of 2 PACIFIC GAS AND ELECTRIC COMPANY N NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT N05. 1 AND 2 Message Classificaton (for SLO County / Calif. OES)

Site Area Emergency Imediate mobilization of emergency

[C] response personnel is required.

(Consider

[B]or[C]protectiveactions

) PGandE is activating the EOF.

General Emergency Immediate mobilization of emergency

[D] response personnel is required.

(Recommend protective action [D]

or [E]) PGandE is activating the EOF.

7. Affected sector (check one) - Wind Speed mps (x2.2) = mph j WIND FROM WIND TOWARD AFFECTED DEGREE 5 DIRECTION AFFECTED SECTOR PAZ's (Basic EPZ)

A'-----------349-11-----------N-------------------S----------

'B' ----------- 12-33-----------NNE-----------------SSW--------

'C' ----------- 34-56-----------NE------------------SW---------

l'D' ----------- 57-78-----------ENE-----------------WSW--------

, 'E' ----------- 79-101----------E-------------------W----------

l

'F' -----------102-123----------ESE-----------------WNW-----1,2

'G' -----------124-146----------SE------------------NW------1,2

'H' -----------147-168----------SSE-----------------NNW-----1,2,5,9

'I' -----------169-191----------S-------------------N-------1,2.5,9

'f -----------192-213----------SSW-----------------NNE-----1,2,5,9

' K' -----------214-236----------SW-------


NE------1,2.4,8

'L' -----------237-258----------WSW------ ----------ENE-----1,2,3,4,8

'M' -----------259-281----------W-------------------E-------1,2,3,4,7,8,11

' N' -----------282-303----------WNW-----------------ESE-----1,2,3,6,7,10,11,12

'o' -----------304-326----------NW------------------SE------1,2,12

'P -----------327-348----------NNW------ ----------SSE--------

8. Recomended General Public Protective Actions (Refer to Table 1 and Figure 1 of EP G-3) l

[A]None

[B] Evacuation of the site, and PAZ 1. .

[C] Evacuate transients (Montana de Oro visitors, agriculture workers, etc.)

in the low population zone (PAZ's 1 and 2) starting with the affected sector and two adjacent sectors.

l l [D] Evacuate the low population zone (PAZ's 1 and 2)) starting with the affected sector and two adjacent sectors, i Alert the public in the basic emergency planning zone using the Early Warning System Sirens and EBS Broadcasts.

l

[E] Take actions specified in [D] and shelter personnel in the affected sector and

! two adjacent sectors in the basic EPZ.

s - - - ~~ ~ ~ '- - ~~ YETATN TRIT TORM FUREVEYEVADJA1 TON - - -- - - - - - ~~ - - - - - - -

DC0042 7V

- - . . ~. _

o I i f

' s l

l .

, i I I I l

  • I I l

(

' t i H t UJ l

  • i 5 s

s UJ UJ -

i ,  !

C 8 f

W l' a

+ i i  !

c.

o + . ' 1 .' t t t w '

  1. ! I 6 t  ! ,

f i

I,  !

i f

' i l

'l j I . . #

' i l . . i i  !

I I i  !

  • l s l -

1 g W e W .

el" i

  • f C ,

6 j .

a l '  !

M Z ',  :

,f = m , ,

  • [ l o >  ; *

- .= s a e

p C '

Q i a:" ' t I i d c W l -  : .

w- e e I i ,

I i j y 4 f oE A

J w

E m

M j  !

l l I

i a

i l

-= _ y -

i i

l l

Rm 8 i

! l i aw - ,

l f Q. 2 H  !

i l s 3 l'  ;

C < I , * '

i .

m a. v v) 1 4 4  ! t

< - l f WZ W ,' '

_J o -

=

' l l ,

y >= >= I l l t I ' I '

l.

k v

l i i

. l ,

i l

u. >. >. .

8 i

l CC v G3 l -

I

' J Z 1 , . l Mc w l *

  • Z< C '

u.: - m l l 6 .

  • I ZQ 2

k w

c w

I .

i

< =

O 8 '

A i a 1 EC

=

y I E  !

6 I

Y ,

e i .'

- I *

. I, .

e- ,

} l .

l 5 i  !.

>- 1  !

l

< I '

5

=

3 l  :

8 W &

W f

m '

C 4 .

o =

6 i

- I {

! I i

= I I w 5 .

t i 1 l

M Q . l i l

I j  ! l l N Z W ' g

  • 1 Q =J t . I j J e l  !

m " < '

(

u  ; .

l I

  • ?

e U Z ' }

- Z C e ,

l*

I i 8  !

I N e

d

=

.,g w

. r

, l i ,

l a -  !

i 4 w i ( e a s 1 I

~

69-10262 7/82 (100) Sheet 1 of 4

- PACIFIC. GAS AND ELECTRIC COMPANY DEPARTMENT OF NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT NOS. 1 AND 2 PART A: RADIOLOGICAL EMERGENCY STATUS FORM Provide as much information as is available and appropriate at the time of the status report.

Date: / / Time: AM/PM Status Report #

(FormCompleted) (Number Sequentially)

Person Authorizing Report: (DCPPonly)

Site Emergency Coordinator Person Transmitting Report: Location (DCPP only)

TSC DIST: (9 copies) E0F DIST: (10 copies)

1. Site Emergency Coordinator 1. Recovery Manager
2. Emergency Evaluation & Recovery Coord. 2. UDAC
3. Emergency Liason Coordinator (2) 3. Advisor To The County
4. Emergency Maintenance Coord. 4. Radiological Emerg., R.M.
5. Emergency Operations Coordinator 5. Operations and Analytical, R.M.
6. Emergency Radiological Advisor 6. Engineering and Logistics, R.M.
7. NRC Office 7. Public Information, R.M.
8. TSC File 8. Coporate Law Dept. Coord.
9. TSC Status Board 9. E0F Status File
10. EOF Emerg. Status Board fk
1. Emergency Classification: Unusual Event Site Area Emergency Alert --

General Emergency

2. Update on Incident: Date / / Time Incident Began: AM PM
a. Site Emergency Signal Sounded YES [] NO []
b. What Happened:

i

3. Radiological Release Information: (attach isotopic breakdown if available)
a. Time Data Collected: AM/PM Unit Involved 1 2
b. Release: Occurring Anticipated--When: AM/PM
c. Location of Release: Plant Vent Steam Surface Liquid Dch.
d. Estimated Duration of Release: Hours O

DC0042 8V

69-10262 7/82 (100) Sheet 2 of 4 PACIFIC GAS AND ELECTRIC COMPANY DEPARTMENT'0F NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT NOS. 1 AND 2

e. Release Monitored: by monitors #
f. Iodine: Est. Total Quantity Ci Release Rate Ci/sec,
g. Particulates: Est. Total Quantity Ci Release Rate Ci/sec,
h. Noble Gases: Est. Total Quantity Ci Release Rate Cf/sec, 2
i. Estimate of Surface Contamination: dpm/100cm Where:

(attach form 69-10296 for out of plant contamination readings)

j. Unusual Radiation Levels in Plant: Where: mR/hr:
k. Radiation Level at site boundary (downwind) mR/hr:

(sector)

1. Meteorological Date (Use 10m elevation on primary met tower or designate other Source )
m. Wind Velocity: m/secx2.2= mph Direction (from): deg.
n. Weather Conditions: Rain Clear Fog Cloudy
o. Stability:

Class Sigma A (deg): Delta T: degrees C/m (10m to 76m or )

X/Q 800m= E Mixing Depth m.

p. Projection Time  :

CENTERLINE (EARSSECTOR() DOSE RATE INTEGRATED DOSE DOSE PROJECTIONS PLUME ARRIVAL mR /hr mR AFFECTED (Circle Which) TIME W.B. THY W.B. THY SECTOR Site Boundary (800m) l 2 Miles (2-5) 6 Miles (5-10) 10 Miles (10-20)

EARS PLUME CENTER DOSE radius

4. Recommended Emergency Actions / Protective Measures for SLO County or California Department Radiation Health (Provide only new recommendations):
5. Emergency Response Actions Underway by PGandE:
6. Prognosis for Escalation or Termination of Accident:

DC0042 9V

. ~ . _ _ . _ _ _

69-10262 7/82 (100) Sheet 3 of 4

. PACIFIC. GAS AND ELECTRIC COMPANY DEPARTMENT OF NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT NOS. 1 AND 2 PART B: MISCELLANE0US EMERGENCY INFORMATION FORM Provide as much information as is available and appropriate at the time of the status report.

Date: / / Time: AM/PM Status #

(Report Completed) (Number sequentially)

Person Authorizing Report: (DCPPonly)

Site Emergency Coordinator Person Preparing Report: Location (DCPP only) i Time Data Collected AM/PM

1. Personnel Injuries: How Many? -
a. Type: Contamination: Yes No 1
b. Injured Person Location: Plant Ambulance Hospital (which)

Other j (where)

c. Ambulance requested Yes No, Location .
2. Fires:
a. Location: Time Reported: AM/PM
b. Type: Electrical Fuel (what kind)
c. Contamination Present: Yes No l

l d. Fire Assistance Requested: Yes No

e. Fire Assistance Onsite: Yes No
3. Security / Safeguards:
a. Bomb Threat: Search Conducted: Yes No ,

Search Results:

Site Evacuated: Yes No

b. Intrusion: Insider: Outsider Point of Intrusion: Extent of Intrusion:

Apparent

Purpose:

DC0042 10V

^

- ,- ..:.._--. _ -2

l 69-10262 7/82 (100) Sheet 4 of 4

. PACIFIC GAS AND ELECTRIC COMPANY DEPARTMENT OF NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT NOS. 1 AND 2 Part B: Miscellaneous Emergency Information Form

c. Strike / Demonstrations: Size of Group:

Purpose:

d. Sabotage: Radiological: Yes No Arson: Yes No

. Equipment / Property:

e. Extortion: Source (phone, letter,etc.): -

Location of Letter:

Demands:

f. General: Firearms Involved: Yes No Violence: Yes No Control of Facility Compromised or Threatened: Yes No Stolen / Missing Material:

Agencies Notified (FBI, State Police, County Sheriff, etc.):

(circle agencies onsite)

O 4. Press Information:

Location of Press Release: San Francisco / San Luis Obispo Other:

(where)

Time of Press Release: AM/PM News Media Interest: Yes No Local / National:

Data Received By: '

Date: / / Time: AM/PM RETAIN THIS FORM FOR EVENT EVALUATION DC0042 11V

69-10295 7/82 (100)' Page 1 of 3 DEPARTMENT OF NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT N05. 1 AND 2 PLANT STATUS EMERGENCY FORM

(

Provide as much information as is available and appropriate at the time of the status report.

j Date: /__/ Time: AM/PM Status Report #

(Form Completed) (Number Sequentially) i

Person Authorizing Report
(DCPPonly)

Site Emergency Coordinator Person Transmitting Report: Location (DCPPonly) l TSC DIST: 9 COPIES E0F DIST: 10 COPIES

1. Site Emergency Coordinator 1. Recovery Manager
2. Emergency Evaluation & Recovery Coord. 2. UDAC

. 3. Emergency Liaison Coordinator (2) 3. Advisor To The County

4. Emergency Maintenance Coord. 4. Radiological Emerg. R.M.

l 5. Emergency Operations Coordinator 5. Operations and Analytical M.

6. Emergency Radiological Advisor 6. Engineering and Logistics M.
7. NRC Office 7. Public Information M.
8. TSC File 8. Corporate Law Dept. Coord.
9. TSC Status Board 9. E0F Status File i 10. EOF Emerg. Status Board
1. Emergency Classification: Unusual Event [ ] Alert [ ] Site A ea Emergenc General Emergency Time Data Collected: AM/PM
2. Plant Status -

Description:

3. Reactor Status: [ ] Unit 1 [ ] Unit 2 (Provide a separate form for

, the other unit)

a. Power Level: Before  % Current  % Power Range i

amp Int. Range Source Ranga j

b. Fuel Damage: []None [ ] Minor [] Major 4

Reactor Coolant System:

4.

a. Pressure
psig Est. RCS Leakage gpm where .
b. Loop Status 1 2 3 4

, Temp. (hot / cold), F / / / /

Flow %

i DC0042 12V i

- ~ _ _ _ _ _ _ _ _ ,

J1 _ J _, _ . _ _ . . _ _ _ _ _ _ . .. ._._...___________._.____1___ _ , _ _ _ _ . _ _ _ _ _ _ _ . . _

, 69-10295 7/82 (100) Page 2 of 3

. PACIFIC GAS AND ELECTRIC COMPANY DEPARTMENT ~0F NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT NOS. 1 AND 2 Plant Status Emergency Form

c. RCP Running: []1 []2 []3 []4
d. Incore Thermocouple (s): F Hottest, F Average
e. Reactor Vessel Level:  %
f. Baron Concentration: ppm
g. Margin to Subcooling: degrees F
h. RCS Activity Sample Available: [ ] YES Activity uci/cc [ ] NO
i. RV Head Temp. F
5. Pressurizer:

/ a. Level:  %

b. PORV/ Safety Valves: [ ] Open [ ] Closed
6. ECCS:
a. Operating: [ ] Yes [ ] No Letdown Flow, gpm VCT Level, %
b. Actuation Auto Man.
c. Cent. Chg. Pumps On: []1 []2 Total gpm:
d. SI Pumps On: []1 []2 Total gpm:
e. RHR Pumps On: []1 []2 Total gpm:

RHR Disch. Temp. F.

f. Accumulators Discharged: [ ] YES [ ] N0
g. Mode: [ ] Inject RWST  % [ ] Recirculation  % Contmt. Level
7. Containment: -
a. Pressure / Temperature / Humidity: psig/ F/ dew point i b. Containment Isolation: [ ] Ph. A [ ] Ph. B i '
c. Integrity:
d. Containment Spray Pumps On: []1 []2
e. Fan Coolers On: []1 []2 []3 []4 []5
f. Rad Monitor: R/hr (Hi Range)-

/ mR/hr (Entry / Seal Table)

DC0042 13V l

l i _

69-10295 7/82 (100) . Page 3 of 3

' PACIFIC GAS AND ELECTRIC COMPANY DEPAR.TMENT'0F NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT NOS. 1 AND 2 Plant Status Emergency Form

8. Steam Generators:
a. Level: 1 %2  % 3 %4  %
b. Pressure: 1 psig 2 psig 3 psig 4 psig
c. Auxiliary Feedwater Pumps On: [] Turbine [ ]2 [ ]3 Total gpm:
d. Feedwater Source: [ ] Cond Tk  % [ ] Raw Water  %

[] Fire Water  %

e. Steam Dump: [ ] Atm [ ] Condenser
f. Safety Valves Closed: []1 []2 []3 []4
g. MSIV's Closed: []1 []2 []3 []4
h. Est. Primary to Sec. Leakage: gpm Cooling:
a. CCW Pumps Flow, gpm: 1 2 3
b. ASW Pumps On: []1 []2
10. Electrical:
a. 4KV Bus Energized: []F []G []H
b. Offsite Power Available: [ ] YES [ ] N0
c. Diesel Generators On: []1 []2 []3
11. Other Information:

Data Received By: _

Date / / Time AM/FH RETAIN THIS FORM FOR EVENT EVALUATION l

O DC0042 14V

O

~

O O '

~ ~.

i Sidit85 8 -- .

Inre lil 8 "i gll!Illhul onttoring anil Plc Imerug. y Status form

, .1 oTT .

I p.ste: ,_ /

Part 8: Onsite/Of fslie llailloingical fic ~ '

Iocatlnn

~

Jye Data C61]ect_,e 1 [ a.m: a.m.

u a.m. ....

a.m. a.m.

p.m. p.m. p.m. p.m. p.m. -l p.m. _,R/hr

__,R/hr _,R/hr _ R/lir _,R/hr _R/hr li~am cpm cle 3 cru 3 'I" 3 Cl" 3 e pjf. cle 3 3 pCl/cp pCl/cg pti/cq pCl/cg pCl/cg pCl/cg pCl/m pcl/m d pCl/m pCl/m' pCl/m

~

pCl/m pCl/gui pCl/p  : i pCl/gm pCl/p pCl/gai pCl/gm '

a.m.

a.m. a.m. a.m.

a.m. a.m. p.m/ p.m.

p.m. p.m. p.m.

p.m. R/lir R/hr -

___,R/hr _R/hr __,R/hr _R/hr '

Te;qu cpm cpm cle 3 clu 3 li fil. cpm 3

cle 3 pCl/cm* pCl/cy 3 pCl/cw pCl/cg nCl/cg pCl/cg pCl/m pC1/m2 pCl/m .

pCl/m i.Cl/m2

~

pCl/m __

pCl/gni -

pCl/timi pCl/gm pCl/gm pCl/gm pCl/gm a.m. 4.m. a.m. a.m. .

a.m.

a.m. p.m. p.m.*

i.

p.m. p.m. p.m. p.m.

i

_R/hr _R/lir _R/hr }i,

'Icim R/hr ___,

R /hr _R/hr '

Plf. cgwe cpm 3

cle 3 cle 3 cle 3 cle 3 3 pCl/cg pCl/cg pCl/cm pCl/cg pCl/cg pCl/cg pCl/m pCl/m pCl/m2 pCl/m pCl/m pCl/m pCl/gni _p Cl/gm pCl/p pCl/gm pCl/gni i.Cl/gm a.m. a.m. a.m. a.m.

a.m. a.m.

p.m. p.m. p.m. p.m.

p.m. p.m. . __

' .__ Team R/hr . R/lir A/hr _,,R/lir _R/itr _R/lir tim 3 cle clu c(m 3 cre 3 .

Plc cpm 3 pCl/cm3 3 pCl/cg pCl/cg pCl/cg pCl/cg pCl/cig pCl/m pCl/m pCl/ai2 pCl/m pCl/m ,

901/m pCl/gm pCl/gm pCl/gm pCl/p pCl/gm pCl/gm a.m. a.m. a.m. a.m.

- . a.m. a.m. .,

p.m. p.m. p.m. p.m. p.m.

p.m.

'Iitan R/hr R/hr R/lir R/lir Y,,_.R/lir _R/lir cgm cle 3 cle cle clu 3 Plc cpai 3 3 3 pCl/cm3 pCl/cq pCl/cw pCl/cw pCl/can pCl/cg pCl/m2 pCl/m' pCl/m2 pc g f,,2 pCl/m2  :

pCl/m

- pCl/w i.Cl/gm PCl/gm pCl/um .

pCl/gm T_[ pCl/g*

DISTRIlitillott 1.IST j 'llata Iransmitted By: _

TSCDist.(S[ [0F Dist. (h) [0F Status file i llels Data Sheet filled Out Ry: Site fmerg. Coord. llec. liqr. [0F fautrg. Status Hil. .

Date:_ .. .... Time: 4 * ._._ P * - Itad. fm:rg. Itec. Hgr. '

Emers. Rad. Advisor 1SC File IlilAC 15C Status lid. Adv. In rount y fuurrg. Org.

PGwE. DIABLO CANYm-POWER PLANT

$7,",,y4%f"' PROCEDURE ON-THE-SPOT CHANGE Procedure No. b'b Rev.  ! Und No.10 2O ia2m ru Es+e6hshtwits ne +4tt On hik F\meruncq. Orwu, n a.nhDn Type of Change: h PERMANENT (green) C TEMPORARY (yellow); Expiration Date Requesting Department M Nfl OIL Originator bb b Proposed Change * (Does this alter the intent of onginal procedure?

~

Yes h )

(Does'it constitute an unreviewed safety /envirorsnental question? O YES S NO)

Chany dak on. pcuf. L 04- Form ten-10M']

Atom &l9lS) -fo Gl9 l82.

a

~

!o D

l -

j Reason for Change: **.

l l

To correcl- bgpocpphicA.l enor

^

Authoruatons: c '

/ ~(Pfarpanagement Staff) (Plant Management Stgw/SRO Ucense) Date*

Initial Distribution By:

Imediate distribution to the Control Room and affected work areas required? O YES % NO '

Distributed To: O Control Room C Others Date Received by Document Control PSRC Revow and Ptant Manager's approval no later than Mate atove 'plus 14 days E Review Date 2E gg PSRC recommends approvalO vosO No Ptant Manager's Approval O N/A 32 "g Meeting NumberO O - 0 0 0 Follow-up To Rejected On the-Spot ChangeO Addrisonai iniormaion O kten TakerVRemarks:

E8 l

O Sgas T,' _ piense so addnonal sheetsI DISTRIBUTION: R Otners

2 CURRENT EMERGENCY PLAN IMPIlMENTING PROCEDURES TABLE OF CONTENTS Volume 3B TITLE REV OR-1 Offsite Support & Assistance 0 OR-2 Release of Infonnation to the Public 0 EF-1 Activation of the Technical Support Center 0 EF-2 Activation of the Operational Support Center 1 EF-3 Activation of the Dnergency Operations Facility 0 EF-4 Activation of MEML 0 EF-5 Bnergency Equipnent, Instruments & Supplies 1 EF-6 Activation of the Dnergency Assessment and 0 Response Systen EF-7 Activation of the Nuclear Data Comnunications O Systens

- RB-1 Personnel Dosi1netry Not Issued RB-2 Bnergency Exposure Guides 0 C,)g RB-3 Stable Iodine Thyroid Blocking 0 RB-4 Access to & Establishment of Controlled Areas 0 Under Dnergency RB-5 Personnel Decontamination 0 RB--6 Area & Equipnent Decontamination 1 RB-7 Bnergency On-Site Radiological Environmen+al 1 knitoring RB-8 Bnergency Off-Site Radiological Environmen'al 1 Monitoring RB-9 Calculation of Release Rate & Integrated Release O RB-10 Protective Action Guidelines O RB-ll Dnergency Off-Site Dose Calculations 1 RB-12 Mid and High Range Plant Vent Radiation Monitors O RB-13 Improved In-Plant Air Sampling for Radioiodines 0

  • O

_. z -

- . :_ _ = = .- _- :. ._ _

NW8ER EP OR-1 9GEiB Pacific Gas and Electric Company REVISION 0 CEPARTMENT OF NUCLEAR PLANT OPERATIONS DATE 7/2/82 OIABLO CANYON POWER PLANT UNIT NO(S) 1 AND 2 PAGE 1 OF 2 EMERGENCY PROCEDURE .- l TITLE: OFFSITE SUPPORT AND ASSISTANCE APPROVED: -

PLANT MANAGER C DATE SCOPE This procedure provides a functional list of non-PGandE organizations which are available for emergency response support and assistance.

Telephone numbers are provided which are to be used for initial notification of the need for emergency support. Organizations required to be notified of an emergency are addressed in the procedures referenced below or in the procedure dealing with the type of event.

GENERAL

1. Requests for support or assistance from non-company organizations should be specific concerning the nature of the support or

.[]

V assistance requested, the location where needed and when it it needed. Requests may be made to mobilize support on a standby basis.

2. All initial request for support shall be approved by the Site Emergency Coordinator or the Recovery Manager at the EOF.

Subsequent requests shall receive the same approval if they l require additional resources. Requests for assistance from l organizations supporting San Luis Obispo County also require County Emergency Services Director approval prior to making the

!. request.

l Emergency response organizations are listed in Appendix 1 under i

3.

the following functional titles:

Radiological Emergency Protective Actions Medical Emergency Fire Emergency l Health Physics / Assessment Support l Plant Operation / Repair Support l Offsite Emergency Response Support l Law enforcement emergency contact means are addressed in the appropriate security procedures.

l

.m O l DC0043 IIII l

. - . . _. ~~_. _ . _ _ _ _ _ .._.1___._._._. ___  :. _.1___ . _ .

DIABLO CANYON POWER PLANT UNIT NO(S) 1 AND 2 NUMBER EP OR-1 REVISION 0 DATE 7/2/82 '

PAGE 2 OF 2 TITLE: 0FFSITE SUPPORT AND ASSISTANCE ~}

SUPPORTING PROCEDURES

~

OP 0-4 " Operating Order (One Hour Reporting Requirements to tne NRC)"

EP G-3 " Notification of Offsite Organizations" ATTACHMENTS

1. Appendix 1 - Offsite Support and Assistance Functional Description
2. Table 1 - Offsite Emergency Support Organization i

l I

DC0043 2III

NUMBER P OR-1 DIABLO CANYON POWER PLANT UNIT NO(S) 1 AND 2 q DATE 7/2/82 j

PAGE 1 OF 2 TITLE: OFFSITE SUPPORT AND ASSISTANCE APPENDIX 1 - -

APPENDIX 1 0FFSITE SUPPORT AND ASSISTANCE CONTACT LIST I. Radiological Emergency Protection Actions The organizaticas listed in Table 1 under this heading provide support to the Sac Luis Obispo County Emergency Organization in implementing protective actions for the general public.

All support requests from these organizations should be coordinated with San Luis Obispo County. Direct requests for support would not ordinarily be required, but exceptions to this may be necessary in the event of an initial notification to San Luis Obispo County requiring imediate protective actions in the low population zone (6 mile radius) or beyond in the affected sectors.

II. Medical Emergency p

s The organizations listed in Table 1 under this heading provide assistance in the transportation or treatment of persons injured and contaminated with radioactive material, and/or overexposed to radiation or radioactive materials. Persons so injured will nonnally be treated at French Hospital in San Luis Obispo, however, Saint Francis Memorial Hospital is also available should the need for additional hospital services arise.

III. Fire Emergency The organizations listed in Table 1 under this heading provide backup fire fighting support to the California Department of Forestry (CDF), in the site area. Assistance is coordinated through CDF in all cases.

IV. Health Physics / Assessment Succort The organizations listed in Table 1 under this heading provide assistance in on or offsite monitoring, radiation protection or radiological accident assessment. Requests for assistance are coordinated through the Emergency Radiological Advisor for onsite or near site activities and with San Luis Obispo County for offsite activity.

O DC0043 3III -

e -a.-

u e - - * - ~

NUMBER P OR DIABLO CANYON POWER PLANT UNIT NO(S) 1 AND 2 DATE 7/2/82 PAGE 2 OF 2 TITLE: OFFSITE SUPPORT AND ASSISTANCE 7>

APPENDIX 1 .

~

V. Plant Oceration/Reoair Support The organizations listed in Table 1 under this heading provide assistance in technical assessment of plant conditions, and in maintenance / repair projects. Only those organizations with defined emergency response roles are included. Assistance from these organizations and from the resources of PGandE, other utilities and vendors are available through the Corporate Emergency Response Organization.

VI. Offsite Emeroency Response Suoport The organizations listed in Table 1 under this heading provide offsite response support to the San Luis Obispo County Emergency

_. Organization, or are available for support of PGandE offsite operations. These support organizations are categorized as:

1 Transpirtation 2 Law Eiforcement 3 Traf'ic Control 4 Public Alerting and Care b-l l

l l

l l

l I l DC0043 4III l -

-._..e Pag 2 1 of 9 a

7 PACIFIC GAS AND ELECTRIC COMPANY -

I

  • DEPARTMENT OF NUCLEAR PLANT OPERATIONS

, DIABLO CANYON POWER PLANT UNIT NOS 1 AND 2- .

, TABLE 1 0FFSITE EMERGENCY SUPPORT ORGANIZATION .

PHONE LIST Organization Function (s) location (s) Phone Number (s)

I. Radiological Emergency Protective Actions US Coast Guard 1) . Clear craft from Rescue water near DCPP Coordination Center

2) Shipboard San Francisco radiological or monitoring Monterey Operation decontamination State Protective actions in San Luis Obispo Department of State Parks & Beaches: Headquarters Parks & Montana De Oro Recreation tvila State Beach Hearst Castle Pismo State Beach Morro Bay State Park I /. Atascadero State Beach California - Ingestion pathway 755 "P" St.

Department of monitoring coordination Sacramento, CA Public and food stuff Healt:-Radiolog- interdiction as required.

ical Health Section II. Medical Emergency (See procedures M-1 and R-1 also)

San Luis Onsite ambulance service. 358 Santa Rosa Ambulance San Luis Obispo Service, Inc.

California Air Medivac Hunter ligget National Guard Aris Helcopter Medivac from Santa Maria Santa Maria Service Airport (under PGandE contract) ,

Air Ambulance, Air Transportation 795 Skyway Inc. (fixed wing or San Carlos, CA - --

~~

helicopter) from site .

or air;; ort under PGandE

,, Contract.

DC0043 SIII

'**K y ~'** 3  ;- . _ _ . _-_-. _- -.

= --- = - - -- % *

, -7 - - - - - - --

i

  • Page 2 of 9 j

j TABLE 1 CONTINUED -

(

Organization Function (s) location (s) Phone Number (s) j i

San' Francisco Ambulance Service in 2829 California l Ambulance the San Francisco Area. Street i Service San Francisco French Hospital Emergency Medical 1911 Johnson Ave. i Treatment San Luis Obispo Ot. Fred Mettler Consultant on Radiological Injuries Saint Francis Emergency Medical 900 Hyde Street Memorial Treatment San Francisco Hospital.

III. Fire Emergency California Primary Site Fire Highway 1 Department of Fighting Response San Luis Obispo ' ,

Forestry Air Attack Base Paso Robles Airport Arroyo Grande Backup fire fighting 140 Traffic Way -

Fire Department support. A; royo Grande Pismo Beach Backup fire fighting 1000 Bello Ave.

Fire Department support. Pismo Beach San Luis Obispo Backup fire fighting Garden & Pismo Fire Department support. Streets San Luis Obispo ,

i South Bay Fire Backup fire fighting 2315 Bayview Department support. Heights Drive los Osos Morro Bay Fire Backup fire fighting 715 Harbor Department support. Morro Bay

~

l DC0043 6111 i ,

S .- --

~. ~ . _ - - - - - - -

,- ;- ; y__ _ m . - ._ - - ; . g_- . _ . .

Page 3 of 9 1

( ,.-. / TABLE 1 CONTIff0ED .

Orcanization Function (s) Location (s) Phone Number (s)

I V.* Health Physics / Assessment Succort ,. ,

Onsite Nuclear 1) Onsite assessment 1450 Maria Lane Regulatory 2) Coordinate federal Suite 260 Comission technical' response Walnut Creek, CA Region V 3) Develop protective action

' recomenda tions.

4) Radiological monitorfng Sacramento Chemical-Radiation Rancho Seco Municipal assistants and equipment. Heald, CA '

Utility District Southern Health Physics San Onofre California technicians and San Clemente, CA Edison equipment.

Offsite

,(~' i ' Department of 1) Federal offsite San Francisco Energy -monitoring and Operations assessment Office-Region 7 coordination. 7333 Broadway

2) Coordination of Oakland, CA Federal response 3

(IREP Coordination).

Nevada Operations .

Office

, Las Vegas, Nevada Environmental Complete radiological Reginn IX Protection monitoring and 100 California i Agency assessment assistance. Street i San Francisco '

Office of Radiation Programs - -

Las Vegas Facility 4

\

-DC0043 7I L -.

- - -.- . . . . . _ . . . - . - . -. .. .7 Page 4 of 9 TABLE 1 CONTINUED .<

'Oroanization Function (s) location (s) Phone Number (s)

Department of Assist in monitoring and HQ-6th Army Defense medical assistance if Presidio of San (Army) requested by the IRAP Francisco coordinator or local authorities (Nuclear Accident Incident Control Teams).

Department of Assist in monitoring and HQ-11th Naval Defense medical assistance if District (Navy) requested by the IRAP San Diego, CA Coordinator (Nuclear Accident Teams).

National Weather reports, WSFO-Redwood Weather forecasts and special City Service advice from Weather (NOAA) Service Forecasting WSFO-Los Offices (WSFO)-normally Angeles caordinated through Meterology personnel in CIRC.

State Office Assessment support to Emergency of Emergency local agencies. Response Center .

Services Sacramento, CA I

State Department Ingestion pathway 744 "P" Street of Public monitoring coordination Sacramento, CA Health-Radiolog- and food stuff ical Health interdiction as required.

Section San Luis Obispo Coordinate county County Gov't.

County of emergency response Center Emergency activities and emergency San Luis Obispo Services planning.

San Luis Obispo Direct offsite moni- 2191 Johnson Ave..

, County toring and assessment San Luis Obispo l

Environmental activities of San Luis Health Obispo County.

5574 Capistrano

Ave. Atascadero ..- - -

, '1

. ./

DC0043 8I

Page 5 of 9

(

TABLE 1 CONTINUED Orcanization Function (s) Location (s) Phone Number (s)

V. Plant Operation /Reoair Succort ~

Westinghouse Technical, onsite or Monroeville Electric Company materials assistance or Nuclear Center reactor systems or .

components. Field Service Manager-GEORGE DILLON - '

or .

2 l

CLIFF LISSENDEN -

or ,

ED SCHOEN -

(' .- '

I i

i i

Service Response Manager-r Joe Leblang I Frank Noon - ,

}

HHL= Dedicated

, , line with an John Miller - .--

answering device which will take I a message and automatically I call alternates

~ ~ ~ ~

DC0043 91

--_ ,o _, .-e., .. - .

. . . . . . . - 7". ~.. ~:L . - - __

. .::~

  • Y: . .. . . . -. ~.-

'~

s. ,

Page 6 of 9 Organization TABLE 1 CONTINUED '

('.

Function (s) location (s) Phone Number (s)

Emergency ..

Response Diector- L Hank Ruppel -

Emergency ,

Response Deputy Director /

Ron Lehr - ,/

Emergency News

' Communications -

Mike Mangan -

I.

Institute of 1) locating emergency Emergency ,

Nuclear Power manpower and Response Center --

Operations equipment Atlanta, Georgia

2) Operational analysis

, 3) Information dissemination

4) Organization of l experts for advice l

l-l

\

( _

DC0042 101 i

m

. Paga 7 of 9

,- TABLE 1 CONTINUED Organization Function (s) Location (s) Phone Number (s)

VI. Offsite Emergency Resoonse Succort ~ -

Transoortation Rogers Helicopter on standby Rogers Helicopter Helicopter under PGandE contract Clovis, CA sound system and lighting.

Rotor-Aids, Inc. Helicopter (s), as Rotor-Aids, Inc.

available, under PGandE Ventura, CA contract. or Mr. Warren Lull Mr. Gary Balthzor Arts Helicopter Helicopter (s),as Santa Maris available under PGandE San Jose contract. Medivac capability.

Condor Helicopter (s),as Condor

~

Helicopters available, under PGandE Helicopters and s contract. At least 1 Aviation Inc.

'( . ),- light duty helicopter Oxnard Airport available at all times. Ventura, CA or Mr. Stewart Taft Mr. Jerry Fouts Mr. Walter Attebery Mr. Steve Smith Air Ambulance, Fixed wing or helicopter 795 Skyway Inc. air ambulance service San Carlos, CA >

under PGandE contract.  :

California Fixed wing and heli- Air Attach Base Department of copter for county / Paso Robles Forestry state support, as Ai rport available.

California 1) Fixed wing or Golden Gate Div.

Highway Patrol helicopter for 455 8th Street transportation of San Francisco {

essential personnel. j

2) Escort of priority - - - -

vehicles.

  • w DC0043 11I o

9 -?%- 4, q s m,, , eta

Page 8 cf 9 8 .

4 TABLE 1 CONTIllVED Organization Function (s) location (s) Phone flLmber(s) (

.. Law Enforcement

  • San Luis Obispo 1) Law enforcement in Dispatch office County Sheriff county areas not County under city PD's. Operational
2) Primary response Facility agency under SLO Highway 1 County emergency San Luis Obispo plan.

Arroyo Grande Law enforcement in 200 N. Halcyon Police Arroyo Grande. Rd.

Department Arroyo Grande J Atascadero Law enforcement in Administration ,

Police Atascadero. Building /

Department Lewis Road /

Atascadero Morro Bay Law enforcement in 850 Morro Bay Police Morro Bay. Boulevard Department Morro Bay i

Pismo Beach Law enforcement in Pismo 1000 Bello Ave. ,

Police Beach. Pismo Beach '

Department San Luis Obispo Law enforcement in San 575 Santa Rosa Police Luis Obispo. San Luis Obispo Department Monterey County Law enforcement in Salinas .

Sheriff Monterey County. i l

Santa Barbara Law enforcement in Santa Santa Barbara  !

Cou'nty Sheriff Barbara County.

Traffic Control (City police, fire and public work also support)

California 1) Primary traffic 675 Calif. Blvd.

Highway Patrol control support to San Luis Obispo SLO County.

2) Fixed wirg or Coastal Div. H.Q; helicopter traffic 1122 Laurel Lane' _ _ _

surveillance. San Luis Obispo '-

J DC0043 121

['

  • - * = - - . ..- - .... . . .. .. . .

.'9 mm- ..-6me

Page 9 of 9 e TABLE 1 CONTINUED 3

('

Organization Function (s) location (s) Phone Number (s)

Public Alerting and Care ~

American Nuclear Emergency assistance 270 Farmington Insurers (ANI) funding of the public for Ave.

emergency response Farmington, Conn.

expenses from an extraordinary nuclear .

occurance. Assistance is coordinated through CIRC, Corporate Liaison Coordinator.

American Red Primary operator of care 1216 Morro Cross and feeding facilities _ San Luis Obispo

. in support of SLO County.

Director or Alternates Emergency Primary stations for XVEC Broadcast providing emergency 820 Walnut Stations public infonnation in San Luis Obispo support of SLO County.

KSLY

'2895 S. Higuera San Luis Obispo ,

KATY i 1146 Monterey San Luis Obispo .. _ . . _ -

s g .

DC0043 131 3

P GeaE DIABLO CANYON POWER PLANT h*,;' % /((f"'

PROCEDURE ON-THE-SPOT CHANGE Procedure No.

EP RB-9 Rev. O Und No.10 2O ia20 l r,iie Calculation of Release Rate and Integrated Release Type of Change: @ PERMANENT (green > 0 TruPoa^av <re-i; Eaoiration cate ong,n,,,, A. O. Taylor l peque.t,ng oopenen Chem / Rad Protection Propoeod Change (Does this anet the entent of ongsnal procedure? O ve. 0 Noi (Does it constitute an unreviewed safety /envirorsnental question? O YEs E NO)

Figure 4 on page 26 displays a graph of R/hr vs time (in hours) for exposure rate as measured by rad monitors RE-30 and RE-31 since time of accident on-set. Thedecadelabelingontheordinate(R/hr)exhibitsanambiguityin 8

' skipping' the 105 measure (i.e., it goes 10 8 to 10' to 105 to 10 ). 5The 10 and 10" existing ordinate measures should be relabled to 10" and 10 respectively!

(See copy attached) 8 i

9 .

o d I Reason for Change The ambiguity in ordinate scaling leads to confusion as to which is correct for application. An independent analysis on the response of RE-30 and RE-31 clarified this ambiguity.

Authonzatens // d*M *$ Z.

l (Ptart Managernent staff) '(Pi3ft: vanagemern sraff J/sRO Lcensel oste

  • Initial Distribution Ey:

Imediate distribution to the Control Room and affected work areas required? O YEs E NO Distributed To: O Control Room C Others .

Date Received by Document Control N PsAC Aeview and Plant Manager's approval no tater than 7 n ate acove 'plus 14 days t

Raview cate g PsRC recommends approvalO vos O No 2

Plant Manager's Approval C N/A

  • g u eiing NumoerO O - 0 0 0 Follow-up To Ae r ected On-tt+ spot ChangeO Add'i=aai iaiormaien O Acton TateneRemarks:

O same o, $sbon Piease so. .ddaenai sneets 0 DISTRIBUTION: p . O omers

- NUT.;e.hR EP RB-9 OLABL CANYON POWER PLANT UNIT NO(S) REVISION O

' DATE 9/1/81 '

PAGE 26 OF 57 nTLE: CALCULATION OF RELEASE RATE AND TOTAL RELEASE FIGURE 4

) 'OSURE RATE DBA-LOCA CONTAINMENT MONITOR VS.

TIME SINCE ACCIDENT ONSET (RE-30 AND 31) io10_7_

E-'f

-.-g -=: _ ._.

9 , , ,, - -- -.;C g ,,

r____

l s_ _ _ _

=--

4____

s e s. _ _ _ _.

r___ __. :

i 3  !

g , e 10 . 'm.m- _- __ __ i_=- _ _.aa=- ~ . _ _

.- , m -

i_ = = = = =

mm -

--z

.x--;_+.

=-

y

s. . .

+ ~ ~ ~ =--

F e--- -

-*=^~-

-- ' - - ~~

-=- =..-r=----

--- s

s. _ m_=--
i. 2- = -. z =:;.;.= .:

-- =. ; _ ___ _ _ -

---=.

.... E:-

l R/hr s. _ . -I _ _=. = --

4 g=

.g-

4. =.-

- _y

= :

s__ 2- _-..

2. _ _ . _

m s -  ; -t----

5 ,sx_ , . , , ,

7 ' ' i ._

y=_=7.

ii.Q - -

c-.-_.

e -

-- = g--. __.

=

1. _

... m.._

_= _ .

m _

s. _ _-- -
  1. .w.

_cu-

^ - -~ -

a--

4. . d-- _

=:-_

s._ __.

2. _ __ .

4y ,

la- 100

' 80 0 20 40 Timethourg) -

l

,