MONTHYEARML20059H8251993-10-29029 October 1993 Summary of 931028 Meeting W/Util Re Current Licensing Actions Ongoing at Plant.Licensing Actions Discussed Listed ML20248D8821989-09-26026 September 1989 Summary of 890907 Meeting W/Util in Rockville,Md to Discuss Safety Sys Outage Mods Insp Finding IC-3,alleging That non-Class 1E Pressure Transmitters Powered from Class 1E Buses W/O Proper Isolation.Viewgraphs & Attendees List Encl ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20246B8971989-07-0505 July 1989 Summary of 890615 Meeting W/Util & Westinghouse Re Lead Plant Implementation for Westinghouse Merits Tech Specs. List of Attendees,Agenda & Merits Program Description Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20247F1991989-03-24024 March 1989 Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20154P4171988-05-13013 May 1988 Summary of 880408 Meeting W/Util & Arrowhead Industrial Water,Inc in Rockville,Md Re Very Low Level Radioactive Concentrations Observed in Reverse Osmosis Sys Used to Generate Makeup Water at Plant.Attendance List Encl ML20151L0681988-04-0404 April 1988 Summary of 880127 CRGR Meeting 128 Re Listed Items,Including Review of Proposed Generic Ltr to Inform Licensees of New NRC Position on Guidelines for Determining Whether Operating Basis Earthquake Limits Exceeded ML20148K0921988-01-22022 January 1988 Summary of ACRS Subcommittee on Metal Components & Thermal Hydraulic Phenomena 871215 Meeting W/Vepco & Westinghouse in Washington,Dc Re Steam Generator Tube Rupture Failure & Dl Johnson Comments on Criteria for ECCS Rule ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20238A5321987-08-26026 August 1987 Summary of 870729 Meeting W/Util & Westinghouse at Plant Re 870715 Steam Generator Tube Rupture.List of Attendees, Meeting Viewgraphs & North Anna Unit 1 870715 Steam Generator Tube Rupture Event Rept Encl ML20237G3791987-08-11011 August 1987 Summary of Operating Reactors Events Meeting 87-23 on 870721.List of Attendees,Viewgraphs & Summary of Reactor Scrams & Significant Events Encl ML20141F4091986-04-10010 April 1986 Summary of Operating Reactors Events Meeting 86-10 W/Ofc Director,Div Directors & Representatives Re Events Since 860324.Viewgraphs & Supporting Documentation Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20151N3021985-12-19019 December 1985 Summary of 851216 Operating Reactor Events Meeting 85-27. Attendance List,Viewgraphs of Events Discussed,Significant Event Elements,Assignment of Followup Review Responsibility & Status of Previous Assignments Encl ML20141E9501985-11-18018 November 1985 Summary of ACRS Subcommittee on Reactor Operations 851104 Meeting in Washington,Dc to Discuss Recent Plant Operating Experience.Fr Notice,Schedule of Discussion & Agenda Encl ML20136C5141985-11-11011 November 1985 Summary of Operating Reactors Event Meeting 85-21 on 851028.List of Attendees,Events Discussed & Completion Dates Assigned Encl ML20133E4631985-10-0101 October 1985 Summary of Operating Reactors Events Meeting 85-17 on 850923.List of Attendees & Viewgraphs Encl ML20138A1201985-09-23023 September 1985 Trip Rept of 850617-20 Site Visits Re Reduction of Wrong Unit/Wrong Train Events at Facilities ML20133Q4171985-09-0505 September 1985 Summary of 850823 Meeting W/Util in Atlanta,Ga Re Development of Scaling Factors for 10CFR61.55 Compliance. Attendance List Encl ML20128C9601985-06-25025 June 1985 Summary of 850607 Meeting W/Util in Bethesda,Md Re Svc Water Sys Piping Corrosion & Preservation Program.Nrr Approval Given to Portion of Util Mechanical Cleaning Program ML20127A7001985-06-0505 June 1985 Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl ML18139B9671982-07-13013 July 1982 Trip Rept of 820512-14 Visit to Facilities Re Radiological Effluent Tech Specs ML20126L2331981-05-0101 May 1981 Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation ML20126H6141981-04-0909 April 1981 Summary of 810320 Meeting W/Utils,Westinghouse & EPRI in Bethesda,Md Re Testing of Block Valves.Attendance List, Handouts & Vendor Ltrs Encl 1993-10-29
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20059H8251993-10-29029 October 1993 Summary of 931028 Meeting W/Util Re Current Licensing Actions Ongoing at Plant.Licensing Actions Discussed Listed ML20248D8821989-09-26026 September 1989 Summary of 890907 Meeting W/Util in Rockville,Md to Discuss Safety Sys Outage Mods Insp Finding IC-3,alleging That non-Class 1E Pressure Transmitters Powered from Class 1E Buses W/O Proper Isolation.Viewgraphs & Attendees List Encl ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20246B8971989-07-0505 July 1989 Summary of 890615 Meeting W/Util & Westinghouse Re Lead Plant Implementation for Westinghouse Merits Tech Specs. List of Attendees,Agenda & Merits Program Description Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20247F1991989-03-24024 March 1989 Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20154P4171988-05-13013 May 1988 Summary of 880408 Meeting W/Util & Arrowhead Industrial Water,Inc in Rockville,Md Re Very Low Level Radioactive Concentrations Observed in Reverse Osmosis Sys Used to Generate Makeup Water at Plant.Attendance List Encl ML20151L0681988-04-0404 April 1988 Summary of 880127 CRGR Meeting 128 Re Listed Items,Including Review of Proposed Generic Ltr to Inform Licensees of New NRC Position on Guidelines for Determining Whether Operating Basis Earthquake Limits Exceeded ML20148K0921988-01-22022 January 1988 Summary of ACRS Subcommittee on Metal Components & Thermal Hydraulic Phenomena 871215 Meeting W/Vepco & Westinghouse in Washington,Dc Re Steam Generator Tube Rupture Failure & Dl Johnson Comments on Criteria for ECCS Rule ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20238A5321987-08-26026 August 1987 Summary of 870729 Meeting W/Util & Westinghouse at Plant Re 870715 Steam Generator Tube Rupture.List of Attendees, Meeting Viewgraphs & North Anna Unit 1 870715 Steam Generator Tube Rupture Event Rept Encl ML20237G3791987-08-11011 August 1987 Summary of Operating Reactors Events Meeting 87-23 on 870721.List of Attendees,Viewgraphs & Summary of Reactor Scrams & Significant Events Encl ML20141F4091986-04-10010 April 1986 Summary of Operating Reactors Events Meeting 86-10 W/Ofc Director,Div Directors & Representatives Re Events Since 860324.Viewgraphs & Supporting Documentation Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20151N3021985-12-19019 December 1985 Summary of 851216 Operating Reactor Events Meeting 85-27. Attendance List,Viewgraphs of Events Discussed,Significant Event Elements,Assignment of Followup Review Responsibility & Status of Previous Assignments Encl ML20141E9501985-11-18018 November 1985 Summary of ACRS Subcommittee on Reactor Operations 851104 Meeting in Washington,Dc to Discuss Recent Plant Operating Experience.Fr Notice,Schedule of Discussion & Agenda Encl ML20136C5141985-11-11011 November 1985 Summary of Operating Reactors Event Meeting 85-21 on 851028.List of Attendees,Events Discussed & Completion Dates Assigned Encl ML20133E4631985-10-0101 October 1985 Summary of Operating Reactors Events Meeting 85-17 on 850923.List of Attendees & Viewgraphs Encl ML20133Q4171985-09-0505 September 1985 Summary of 850823 Meeting W/Util in Atlanta,Ga Re Development of Scaling Factors for 10CFR61.55 Compliance. Attendance List Encl ML20128C9601985-06-25025 June 1985 Summary of 850607 Meeting W/Util in Bethesda,Md Re Svc Water Sys Piping Corrosion & Preservation Program.Nrr Approval Given to Portion of Util Mechanical Cleaning Program ML20127A7001985-06-0505 June 1985 Summary of 850506 Meeting W/Utils & Bechtel Corp in Bethesda,Md Re Respiratory Protection for Subatmospheric Containments.Agenda & List of Attendees Encl ML20126L2331981-05-0101 May 1981 Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Pressure Vessels.All Parties Agree That Thermal Shock W/Subsequent Repressurization Is Safety Concern Needing Prompt Evaluation ML20126H6141981-04-0909 April 1981 Summary of 810320 Meeting W/Utils,Westinghouse & EPRI in Bethesda,Md Re Testing of Block Valves.Attendance List, Handouts & Vendor Ltrs Encl 1993-10-29
[Table view] |
Text
I l
joareg
- f. UNITED STATES
[.'"[tj NUCLEAR REGULATORY COMMISSION
$ $ WASHINGTON. D.C. 20555-0001 k '.*. . * ;o# October 29, 1993 Docket Nos. 50-338 and 50-339 i
i LICENSEE: Virginia Electric and Power Company (VEPCO) l FACILITY: North Anna Power Station, Units I and 2 (NA-1&2)
SUBJECT:
MEETING SUPMARY OF OCTOBER 28, 1993 l On October 28, 1993, Messrs. J. Hegner and P. Keep of VEPC0 met with Leon Engle, Project Manager, NRR to discuss the current licensing actions ongoing at NA-112. The licensing actions discussed were:
- 1. TS 278 Control Rod Urgent Failure - Provide adequate time to effect repairs to the rod control system when the affected banks remain trippable '
and within acceptable alignment limits. l
- 2. Service Water Upgrade Exemption Request - Temporary exemption from GDC 2' i
( to support the Phase 1, Stage 4 SW restoration activities. , I l
- 3. TS 294A Review of Safety Evaluations and Procedures - Changes to Section 6.2 to clarify scope of reviews. (CBLA) l l
- 4. TS 296 Remove Periodicity Requirement for Procedure Reviews - Procedure I improvement program includes improved processes which obviate need for a )
" periodic" review. (CBLA) j I
- 5. TS 288 Removal of Audit Frequencies - Proposes relocation of audit frequencies from TS to other licensee administrative controls. (CBLA) l 6. TS 293 Reduce Number of Inspected Steam Generators - Revise TS to require that only one, rather than two, steam generators be inspected following !
replacement. l l
- 7. TS 292 ZIRL0 Clad Fuel Rods - Allows use of ZIRLO Clad Fuel Assemblies. _i l 8. Pump and Valve Test Program, Revision 7 - Incorporates reconmendations of Design Basis Review and responds to NRC's concerns noted in the Revision 6 TER.- 4
- 9. TS 286A Revision to 10 CFR Part 20 - Revises TS to conform to the require- !
ments of the revised 10 CFR Part 20. Supplemental information needed to j support change.
- 10. UFSAR Revision No. 23 - Continue improvement and upgrade of the UFSAR.
gig ((h, 9311100230 931029 PDR ADOCK 05000338 p
P PDR
October 29, 1993 !
i The meeting closed after a brief discussion of VEPCO's efforts to consolidate the NA-1&2 technical specifications into a single entity. No submittal date i has yet been determined. :
i (original Signed By)
{
Leon B. Engle, Project Manager !
Project Directorate II-2 Division of Reactor Projects - I/II ;
Distribution !
Docket File- 1 PDII-2 RF !
NRC & Local PDRs !
T. Murley/F. Miraglia !
! J. Partlow !
S. Varga ;
G. Lainas i H. Berkow L. Engle i E. Tana !
! OGC ;
E. Jordan l ACRS (10)
L. Plisco, EDO RII l M. Sinkule, RII j OF M E LA:PDII-2 PM:PDII-2 D:PDII-2 we ETana E N LEngled HBerkNh DATE 10/ 2 1/93 10/43T/93 10/F5/93 ;
0FFICIAL RECORD COPY - DOCUMENT NAME: C:\ AUTOS \WPDOCS\NOANNA\0CT28. SUM !
t l
l i
North Anna Power Station Virginia Electric & Power Company Units 1 and 2 cc:
Mr. William C. Porter, Jr. Robert B. Strobe, M.D., M.P.H. I County Administrator State Health Commissioner Louisa County Office of the Commissioner i P.O. Box 160 Virginia Department of Health l Louisa, Virginia 23093 P.O. Box 2448 ,
Richmond, Virginia 23218 l Michael W. Maupin, Esq.
Hunton and Williams Regional Administrator, RII Riverfront Plaza, East Tower U.S. Nuclear Regulatory Commission l 951 E. Byrd Street 101 Marietta Street, N.W., Suite 2900 '
Richmond, Virginia 23219 Atlar.ta, Georgia 30323 Dr. W. T. Lough I Virginia State Corporation Commission Mr. G. E. Kane, Manager Division of Energy Regulation North Anna Power Station P.O. Box 1197 P.O. Box 402 Richmond, Virginia 23209 Mineral, Virginia 23117 Old Dominion Electric Cooperative Mr. W. L. Stewart 4201 Dominion Blvd. Senior Vice President - Nuclear Glen Allen, Virginia 23060 Virginia Electric and Power Company l Innsbrook Technical Center l l Mr. M. L. Bowling, Manager 5000 Dominion Blvd.
l Nuclear Licensing & Programs Glen Allen, Virginia 23060
! Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.
Allen, Virginia 23060 Office of the Attorney General Supreme Court Building 101 North 8th Street Richmond, Virginia 23219 t
l Senior Resident Inspector l North Anna Power Station U.S. Nuclear Regulatory Commission Route 2, Box 78 Mineral, Virginia 23117 l
P 1
--