Similar Documents at Cook |
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML17335A5551999-10-12012 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5591999-10-11011 October 1999 Supplement to Application for Amends to Licenses DPR-58 & DPR-74,replacing Correct TS Pages Inadvertently Included in 990923 Submittal.Attached Pages Also Include Appropriate Administrative Changes ML17335A5411999-10-0101 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Containment Recirculation Sump Water Inventory.Calculation & non-proprietary WCAP-15302 Rept Also Encl ML17326A1571999-09-23023 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,involving Movement of Loads in Excess of Design Basis Seismic Capability of Auxiliary Bldg Load Handling Equipment & Structures ML17326A1421999-09-17017 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,to Allow Credit of Rod Cluster Control Assemblies for Cold Leg Large Break LOCA Subcriticality.Ts Pages & non-proprietary Versions of WCAP-15246 Encl.Proprietary Version Withheld ML17326A1161999-09-10010 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0921999-08-17017 August 1999 Application for Amend to License DPR-58,to Change TS 3/4.4.5 & Bases for TS 3/4.4.5,3/4.4.6.2 & 3/4.4.8 to Remove voltage-based Repair Criteria,F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarify Bases Sections ML17325B6041999-05-21021 May 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Limitations of Positive Reactivity Additions in Several TS Action Statements ML17325B5511999-04-19019 April 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3/4.8.1.2, Electrical Power Systems & Associated Bases to Provide one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3661998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,adding TS for Distributed Ignition Sys ML17335A3631998-12-0303 December 1998 Application for Amend to License DPR-58,revising TS 3/4.7.7, Sealed Source Contamination & Associated Bases to Address Testing Requirements for Fission Detectors ML17335A3591998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,making Administrative Changes to Remove Obsolete Info,To Provide Consistency Between Units 1 & 2,to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3561998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases to Reflect Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A2631998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Containment Sys Bases 3/4.6.1.4 Re Internal Pressure & 3/4.6.1.5 Re Air Temp ML17335A2761998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2671998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3.4.1.3, RCS - Shutdown & Associated Bases to Provide Separate Requirements for Modes 4 & 5 with Loops Filled & Mode 5 with Loops Not Filled ML17335A2311998-09-14014 September 1998 Application for Amends to Licenses DPR-58 & DPR-74,changing Runout Limits for Safety Injection Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1901998-08-28028 August 1998 Application for Amend to License DPR-58,requesting Extension of SG Surveillance,Which TSs Require to Be Performed on or Before 990408,until End of Current Refuel Cycle Currently Scheduled for Mar 2000.W/assessment of SG Degradation & TSs ML17334A7471998-06-10010 June 1998 Application for Amends to Licenses DPR-54 & DPR-78,changing Implementation Date to Reduce Boric Acid Concentration in Boric Acid Storage Sys.Attachment 1 to Ltr Contains Description of Proposed Change & Justification for Change ML17334B7011998-03-0303 March 1998 Application for Amends to TS for Licenses DPR-58 & DPR-74, Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Plants TS 3/4.6.4 Bases ML17334B6561997-10-0808 October 1997 Application for Amends to Licenses DPR-58 & DPR-78,changing TSs 3/4.6.5 & 3/4.5.5 to Increase Both Minimum Required Ice Mass Per Ice Basket & Total Minimum Required Ice Mass. Proprietary Summary of Sump Inventory Calculations,Encl ML17333B0431997-09-19019 September 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9831997-08-11011 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2101997-08-0101 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig from TS ML17333A8281997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74, Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8311997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74,changing Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted ML17333A7121996-12-20020 December 1996 Application for Amends to Licenses DPR-58 & DPR-74, Requesting Rev of Reactor Coolant Pump Flywheel Insp Frequency ML17334B5941996-07-11011 July 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Support Operation of Unit 2 at Increased Core Rated Thermal Power of 3,588 Mwt.Rev 1 to WCAP-14489, ...Unit 2 3,600 Mwt Uprating Program Licensing Rept Encl ML17334B5901996-06-19019 June 1996 Application for Amend to License DPR-58,addressing Applicable Requirements of NRC GL 95-05, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking. ML17334B5891996-06-11011 June 1996 Application for Amends to Licenses DPR-58 & DPR-74,removing TSs Certain Requirements for Administrative Controls,Related to QA Requirements,Per Administrative Ltr 96-05 ML17333A4201996-04-0808 April 1996 Application for Amends to Licenses DPR-58 & DPR-74,moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3551996-03-12012 March 1996 Application for Amend to License DPR-74,removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3, 4 & 5 ML17334B5751996-02-29029 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Reduce Boric Acid Concentration in Boric Acid Storage Sys from Approx 12 Percent to Approx 4 Percent by Weight. Technical Rept Presenting Justificaion for Changes Encl ML17334B5741996-02-26026 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.6.2 to Increase Current Limit on Nominal Fuel Assembly Enrichment for New,Westinghouse - Fabricated Fuel Stored in New Fuel Storage Racks ML17333A3201996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3151996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A2641996-01-12012 January 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2391995-12-19019 December 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 3/4.6.1.2,3/4.6.1.3,3/4.6.1.6 & 3/4.6.1.6 to Require Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) to Be Performed Per 10CFR50,App J Option B ML17332B0111995-11-10010 November 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising Ts,By Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9971995-10-20020 October 1995 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Add Exemption to TS 4.0.4 in Surveillance Requirements for MSIV ML17332A9111995-08-0606 August 1995 Application for Amends to Licenses DPR-58 & DPR-74,informing That Licensee Has 45 Days from Date of Issuance to Implement Amend Unless Otherwise Specified ML17334B5561995-08-0404 August 1995 Application for Exigent Amend to License DPR-58,modifying TS 4.4.5.4 & 4.4.5.5 for Repair of Hybrid Expansion Joint Sleeved SG Tubes.Proprietary W Rept WCAP-14446, Repair...Of Hybrid Expansion Joint...Tubes Encl.W Rept Withheld ML17332A8271995-06-30030 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,changing TS Section 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02, Suppl 1 ML17334B5501995-06-20020 June 1995 License Amend Request to Licenses DPR-58 & DPR-74,to Remove Requirements for Fire Protection Systems from Licenses & Guidance in GL 86-10,GL 88-12 & GL 93-07 ML17332A7991995-06-15015 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H ML17334B5481995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Support Operation of Unit 1 at SG Tube Plugging Levels Up to 30%,make One Unit 1 TS More Nearly Like Corresponding Unit 2 TS & Maintain Consistency of Unit 2 Criteria ML17334B5461995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying Tech Specs 3/4.3.1 (Reactor Trip Sys Instrumentation) & 3/4.3.2 (ESFAS Instrumentation) & Bases to Relocate Tables of Response Time Limits to Ufsar,Per GL 93-08 ML17332A7661995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Incorporate Cycle & Burnup Dependent Peaking Factor Penalty ML17332A7741995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02,Suppl 1 ML17332A7771995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Table 4.3-2 to Change Main Steam Line Isolation Valve Manual Actuation Sys Surveillance Frequency from Monthly to Quarterly 1999-09-23
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17335A5551999-10-12012 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5591999-10-11011 October 1999 Supplement to Application for Amends to Licenses DPR-58 & DPR-74,replacing Correct TS Pages Inadvertently Included in 990923 Submittal.Attached Pages Also Include Appropriate Administrative Changes ML17335A5411999-10-0101 October 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Containment Recirculation Sump Water Inventory.Calculation & non-proprietary WCAP-15302 Rept Also Encl ML17326A1571999-09-23023 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,involving Movement of Loads in Excess of Design Basis Seismic Capability of Auxiliary Bldg Load Handling Equipment & Structures ML17326A1421999-09-17017 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,to Allow Credit of Rod Cluster Control Assemblies for Cold Leg Large Break LOCA Subcriticality.Ts Pages & non-proprietary Versions of WCAP-15246 Encl.Proprietary Version Withheld ML17326A1161999-09-10010 September 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0921999-08-17017 August 1999 Application for Amend to License DPR-58,to Change TS 3/4.4.5 & Bases for TS 3/4.4.5,3/4.4.6.2 & 3/4.4.8 to Remove voltage-based Repair Criteria,F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarify Bases Sections ML17325B6041999-05-21021 May 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising Limitations of Positive Reactivity Additions in Several TS Action Statements ML17325B5511999-04-19019 April 1999 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3/4.8.1.2, Electrical Power Systems & Associated Bases to Provide one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3661998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,adding TS for Distributed Ignition Sys ML17335A3631998-12-0303 December 1998 Application for Amend to License DPR-58,revising TS 3/4.7.7, Sealed Source Contamination & Associated Bases to Address Testing Requirements for Fission Detectors ML17335A3591998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,making Administrative Changes to Remove Obsolete Info,To Provide Consistency Between Units 1 & 2,to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3561998-12-0303 December 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases to Reflect Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A2631998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS Containment Sys Bases 3/4.6.1.4 Re Internal Pressure & 3/4.6.1.5 Re Air Temp ML17335A2761998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2671998-10-0808 October 1998 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 3.4.1.3, RCS - Shutdown & Associated Bases to Provide Separate Requirements for Modes 4 & 5 with Loops Filled & Mode 5 with Loops Not Filled ML17335A2311998-09-14014 September 1998 Application for Amends to Licenses DPR-58 & DPR-74,changing Runout Limits for Safety Injection Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1901998-08-28028 August 1998 Application for Amend to License DPR-58,requesting Extension of SG Surveillance,Which TSs Require to Be Performed on or Before 990408,until End of Current Refuel Cycle Currently Scheduled for Mar 2000.W/assessment of SG Degradation & TSs ML17334A7471998-06-10010 June 1998 Application for Amends to Licenses DPR-54 & DPR-78,changing Implementation Date to Reduce Boric Acid Concentration in Boric Acid Storage Sys.Attachment 1 to Ltr Contains Description of Proposed Change & Justification for Change ML17334B7011998-03-0303 March 1998 Application for Amends to TS for Licenses DPR-58 & DPR-74, Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Plants TS 3/4.6.4 Bases ML17334B6561997-10-0808 October 1997 Application for Amends to Licenses DPR-58 & DPR-78,changing TSs 3/4.6.5 & 3/4.5.5 to Increase Both Minimum Required Ice Mass Per Ice Basket & Total Minimum Required Ice Mass. Proprietary Summary of Sump Inventory Calculations,Encl ML17333B0431997-09-19019 September 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9831997-08-11011 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2101997-08-0101 August 1997 Application for Amends to Licenses DPR-58 & DPR-74,deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig from TS ML17333A8281997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74, Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8311997-03-26026 March 1997 Application for Amends to Licenses DPR-58 & DPR-74,changing Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted ML17333A7121996-12-20020 December 1996 Application for Amends to Licenses DPR-58 & DPR-74, Requesting Rev of Reactor Coolant Pump Flywheel Insp Frequency ML17334B5941996-07-11011 July 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Support Operation of Unit 2 at Increased Core Rated Thermal Power of 3,588 Mwt.Rev 1 to WCAP-14489, ...Unit 2 3,600 Mwt Uprating Program Licensing Rept Encl ML17334B5901996-06-19019 June 1996 Application for Amend to License DPR-58,addressing Applicable Requirements of NRC GL 95-05, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking. ML17334B5891996-06-11011 June 1996 Application for Amends to Licenses DPR-58 & DPR-74,removing TSs Certain Requirements for Administrative Controls,Related to QA Requirements,Per Administrative Ltr 96-05 ML17333A4201996-04-0808 April 1996 Application for Amends to Licenses DPR-58 & DPR-74,moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3551996-03-12012 March 1996 Application for Amend to License DPR-74,removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3, 4 & 5 ML17334B5751996-02-29029 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,revising TS to Reduce Boric Acid Concentration in Boric Acid Storage Sys from Approx 12 Percent to Approx 4 Percent by Weight. Technical Rept Presenting Justificaion for Changes Encl ML17334B5741996-02-26026 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.6.2 to Increase Current Limit on Nominal Fuel Assembly Enrichment for New,Westinghouse - Fabricated Fuel Stored in New Fuel Storage Racks ML17333A3201996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3151996-02-22022 February 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A2641996-01-12012 January 1996 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2391995-12-19019 December 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 3/4.6.1.2,3/4.6.1.3,3/4.6.1.6 & 3/4.6.1.6 to Require Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) to Be Performed Per 10CFR50,App J Option B ML17332B0111995-11-10010 November 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising Ts,By Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9971995-10-20020 October 1995 Application for Amends to Licenses DPR-58 & DPR-74,proposing to Add Exemption to TS 4.0.4 in Surveillance Requirements for MSIV ML17332A9111995-08-0606 August 1995 Application for Amends to Licenses DPR-58 & DPR-74,informing That Licensee Has 45 Days from Date of Issuance to Implement Amend Unless Otherwise Specified ML17334B5561995-08-0404 August 1995 Application for Exigent Amend to License DPR-58,modifying TS 4.4.5.4 & 4.4.5.5 for Repair of Hybrid Expansion Joint Sleeved SG Tubes.Proprietary W Rept WCAP-14446, Repair...Of Hybrid Expansion Joint...Tubes Encl.W Rept Withheld ML17332A8271995-06-30030 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,changing TS Section 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02, Suppl 1 ML17334B5501995-06-20020 June 1995 License Amend Request to Licenses DPR-58 & DPR-74,to Remove Requirements for Fire Protection Systems from Licenses & Guidance in GL 86-10,GL 88-12 & GL 93-07 ML17332A7991995-06-15015 June 1995 Application for Amends to Licenses DPR-58 & DPR-74,revising TS 4.8.1.1.2.e.7 to Reduce Duration of Surveillance Testing for EDGs During Refueling Operations from 24 H to 8 H ML17334B5481995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Support Operation of Unit 1 at SG Tube Plugging Levels Up to 30%,make One Unit 1 TS More Nearly Like Corresponding Unit 2 TS & Maintain Consistency of Unit 2 Criteria ML17334B5461995-05-26026 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying Tech Specs 3/4.3.1 (Reactor Trip Sys Instrumentation) & 3/4.3.2 (ESFAS Instrumentation) & Bases to Relocate Tables of Response Time Limits to Ufsar,Per GL 93-08 ML17332A7661995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74.Amends Would Incorporate Cycle & Burnup Dependent Peaking Factor Penalty ML17332A7741995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS 5.3.1 to Allow Fuel Reconstitution,Per GL 90-02,Suppl 1 ML17332A7771995-05-25025 May 1995 Application for Amends to Licenses DPR-58 & DPR-74,modifying TS Table 4.3-2 to Change Main Steam Line Isolation Valve Manual Actuation Sys Surveillance Frequency from Monthly to Quarterly 1999-09-23
[Table view] |
Text
,
.r;
- ' t
^
cN Pows.' Company dM N -.. .P.O. Box 10631 -
i Jh V' l Cdumbus. OH 43216 ?
E M INDIANA
' AlfCNIGAN -
J POWER 7
AEP:NRC:03980'. .,
~
Donald C. Cook Nuclear Plant Units 1-& 2:
License Nos. DPR-58 and DPR 74
. Docket Nos.-50 313-and 50 316- i p M -TECHNICAL SPECIFICATION CHANGE:
CONTROL ROOM TEMPERATURE LIMIT U.ES.~ Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
~ Attn: T. E - nurley 't September 10, 1990-
- Dear Dri.Murley; s
'This letter and_its attachments constitute an application for "y '
amendmen~ to the Technical Specifications (T/Ss) for Donald C.
= Cook. Nuclear-Plant Units 1 and 2. Specifically, we propose'to ,
modify T/S 4.7.5.1.a such that the control room temperature limit is-conservatively: reduced from 120 F to 95 F. We are also . ]
proposing a change to the associated Bases Section that-elaborates on the reason for the temperature that we have proposed. ,
The reasons for the. proposed changes and our analyses concerning.
significant hazards considerations -.aro contained in Attachment- I
~
to this letter. The proposed revised T/S pages are contained in' Attachment 2.
Additional changes to the control room ventilation system T/Ss have been proposed in our letter AEP:NRC:0398R,' dated June 29, "
1989. The changes proposed in this letter are in addition to those changes 'ad ao not supersede them.--
We believe that the proposed changes will not result in (1) -a significant change in the types of effluents or a significant l
increase in the amounts of any effluent that may be released offsite, or (2) a significant increase in individual or cumulative ~ occupational radiation exposure. ,
LThese changes have been reviewed by the Plant Nuclear Safety Review Committee and will be reviewed by the Nuclear Safety and Design Review Committee at their next regularly scneduled
. meeting.
I 9009180035 90091o hDR ADOCK 05000315 phi PDC I"1 m .
___.__m ..
m: .
f 3, >
" n .*
- (
, gy , .
e
>. ;t. .,
1,,,
,s.,....
4 T
14 -.
_. g .
,[ <
Dr. T. E. Murley- 2- 'AEPiNRC:0398U i .
+
f . In compliance with the requirements of 100FR50.91(b)(1), copies of
.,3 this letter and its attachments have been transmitted to Mr. J. R.
Padgett of the Michigan Public Service Commission and to the Michiga.n Department of Public Health.
This document has been prepared following Corporate procedures that incorporate-a reasonable set of controls to ensure its
~
accuracy and completeness prior to signature by the undersigned.
Sincerely, i
"J c,
. M. . Alexich Vice President
- dfw-
.o cc: D. H, Williams , Jr. ,
.A; A. Blind:- Bridgman J..R..Padgett G. Charnoff A. B. Davis - Region III NRC Resident Inspector - Bridgman NFEM Section Chief h
2 5
4 S'
s
, Q:.-
. .,. + ,
, ..e .f. #. , .
_y
+ . i
-? t{. '
., ' ty ' i'j i t _, i
. ,, l , .' ' Ee :, ' -,'
. j ! ,i . ,
.y
- v. . v;
.4 . _
! t ', 5
.t. !.h. * ,, u, m- , 1n ,
N '..
i t I f, 3, l', I 1 - 4[
1 J' . , _
.t
,d ,
t'
't
^
ATTACHMENT 1 TO'AEP:NRC:0398U. .
t g -y. REASONS AND 10CFR50,92 ANALYSES FOR CHANGES TO THE n.. -.
DONILD C.' COOK NUCLEAR PLANT' UNIT NOS.~1.AND 2 ,
T- i TECHNICAL SPECIFICATIONS ,
?' .
4
' (.
- g. -
.-r'
.I.
L i
N
.g t-hh t
I i
t*
?., I L % - _.
1 .
,(.'
- g. i' F .i s
g r-f i,.- .
44 4 ,
I r I
= _f
.(-
s t
- !r i
s
' L' %.
o he p
w.
f.'* ,
MI j .
ATTACIMENT 1 TO AEP:NRC:0398U Page 1 Introduction and Background This license amendment request proposes to modify T/S 4.7.5.1.a ,
such that the control room temperature limit is conservatively reduced from 120 F to 95 F.
During<the period of September 15 19, 1986, a survey was conducted of the control room ventilation system at the Cook Nuclear Plant, i; The survey team was led by J. Hayes of NRR, with assistance from contractors from Argonne National Laboratory. The team's review 4
L' included control room habitability Technical Specification (T/S) changes that we had submitted in July 1986 as a result of NUREG 0737 Item III.D.3.4 and the subsequent Generic Letter 83 37.
l: 'The. team found problems with our T/S submittal and with the control room. habitability analyses that supported the ~ chnge. As l a result, we withdrew our proposed T/S changes by lette dated l April 29, 1988. By letter dated October 11, 1988, we provided lc revised control room habitability analyses, and by letter dated-L June 29, 1989, we provided proposed revised control room habitability T/S changes.
The June 29, 1989 T/S c'bmittal addressed the T/S concerns of the y survey team except for one item regarding the maximum control room
? >
temperature. The temperatureto120{/Sshavealwayslimitedthecontrolroom F. This value remained unchanged throughout our various T/S'submittals. The survey. team, in their report, asked two questions concerning the adequacy of this temperature, specifically: (1) Is the temperature consistent with equipment qualification temperatures? and (Q Does the temperature limit consider that tempercturea inside various panels may be much higher than the ambient room temperature?
l In our June 29, 1989 submittal, we committed to perform a study of
, the control room temperature limit, and to propose any necessary changes by September 1990. Orr study has been completed and, a: a result, we have determined that a temperature limit of 95 F is more-appropriata. We note that (ur June 29, 1989 T/S submittal remains under NRC review. The changes proposed in this letter are in addition to those changes aH do not supersede them.
Evaluation As discussed in the Bases for T/S 3/4.7.5.1, the , arpose of d,e w ntrol room temperature limit is to ensure that the ambient air l 1
1
r y t
a, .
Lii L
f,, ,
i
, i if ATTACRMENT 1 TO AEP:NRC:0398U Page 2
. temperature does not exceed the alle 'able temperature for the continuous duty rating for the equipa nt and instrumentation 1 cooled by the control room ventilation system.
t In researching the adequacy of the 120*F limit, we have considered both parts of the survey team's concern, which are the sensor :
location and the temperature. ;
)
Temperature Sensor Location i
The non-Westinghouse critical instruments ars located in open racks and not enclosed panels. These devices'are all -
I continuous duty rated above 120 F. The control room temporacure probe used for determining the T/S temperature (the DTU panel .
probe) is nested in the open rack behind the control room DTU i i panel. The temperature measured at ht is probe location was found '
to be within 1 1/2 degrees of the temperatures measured at the ;
other critical locations within the racks.
The Westinghouse panels are temperature rated as a complete unit based on the control room ambient temperature, not the temperature !
inside the panel. As the ambient temperature rises, the rated life of the equipment in the panel decreases. During the testing, ,
the ambient temperature measured at each Westinghouse panel was at or below the control room temperature at the DTU panel probe. The ,
DTU panel indicates a temperature very close to the ambient temperature surrounding the Westinghouse panels. The DTU panel readout, therefore, provides the appropriarc relevant temperature to be used to determine T/S temperature. It should be noted that the panels are well ventilated and during testing, temperature rises through the panels were observed to be low. l T/S Temperature Limit' As discussed above, the critical non Westinghouse equipment is continuous duty rated for room ambient temperatures above 120 F.
Regarding the Westinghouse equipment, the panel with the highest expected ambient temperature would have a gated life of approximately 15,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> at 95 F. At 80 F, equipment life ,
exceeds the life of the plant. The control room ventilution l system typically maintains the control room at an average temperatureofapproximatelyf5Fyearround. The control room temperature has been above 80 F as measured at the DTU panel only on rare occasions, for limited time periods.
e
' t !.
t 4 .
ATTACHMENT 1 TO AEP:NRC:0398U Page 3 We are' proposing to chagge the control room temperature limit from-the present 120 F to 95 F. . Although higher than the corcinuous duty rating for the Westinghouse equipment - rated equip'aent life ,
at this temperature (15,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />) is sufficiently long,to provide ,
reasonable assurance that the rated life will not be etceeded. -
(Because we have redundant control room air gondition systems, we j would expect temperature excursions above 80 F [the continuous 'l duty temperature) to be liuited in ngaber and very short in '
duration.) Equipment lifetime at 95 F would be sufficiently long-to preclude the need to log temperature excursions above the ,
continuous duty temperature.
. Bases Changes In addition to changing the 120 F T/S limit, we are also proposing to modify.the Bases Section for T/S 3/4.7.5. The revised Bases discusses the relationship between the T/S limit and the continuous duty rating.
10CFR50.92 Evaluation Per 10CFR50.92, a proposed ameniment will not involve significant hazards consideration if the proposed amendment does not: ,
l.
(1) involve a significant increase in the probability or +
consequences of an accident previously analyzed, (2) create the possibility of a new or different kind of L U accident from any accident previously analyzed or :
evaluated,-or !
i (3) involve a significant reduction in a margin of safety, i l' criterion 1 The change to the T/S temperature limit is in the conservative
! direction. The temperature selected is consistent with ASHRAE guidance on heat stroke protection and was developed considering qualified life of control room equipment. We therefore conclude f
Op
- e j.
F
[ ,..,J' ;
l.-
j l' ATTACHMENT 1 TO AEP:NRC:0398U Page 4 that the change will not involve a.significant increase in the probability or consequences of a previously evaluated accident.
Criterion 2 The change involves no physical changes to the plant nor any new-modes of plant operation. The change will not. therefore, create the possibility of a new or different kind of accident from any accident previously analyzed or evaluated.
Criterion 3 The change is in the conservative direction, placing additional y restrictions on 1lant operation. Therefore, the change should 1 increase, rather than decrease, the margin of safety.. i>
Lastly, we note that the Commission has provided guidance ,
concerning the determination ot significant hazards by providing examples (48FR14870) of amendments considered not likely to involve significant hazards consideration. The second example .
refers to changes that constitute additional limitations, restrictions, or controls not presently included in the T/Ss.
Since this change reduces the maximum allowable T/S temperature for which operation may continue, we conclude that the example cited is applicable, and that the change should not involve significant hazards consideration.