Regulatory Licensing Status Summary Report.Data as of June 16,1982.(Blue Book)
ML20055B691
Person / Time
Issue date: 07/31/1982
From:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To:
References
NUREG-0580, NUREG-0580-V11-N06, NUREG-580, NUREG-580-V11-N6, NUDOCS 8207220654
Download: ML20055B691 (73)


Text

!

i NUREG-0580 l- _

Vol.11, No. 6

=-

REGULATORY LICENSING l

STATUS

SUMMARY

REPORT l

l NUCLEAR POWER PLANTS DATA FOR DECISIONS LBLUE BOOK?

MAY 16 - JUNE 16,1982 1

I UNITED STATES NUCLEAR REGULATORY COMMISSION ggR RE ggg b

},

I

Available from I

l NRC/GPO Sales Program l

l l

Superintendent of Documents j

Government Printing Office j

Washington, D. C. 20402 A year's subscription consists of 12 issues for this publication.

Microfiche of single copies are available from NRC/GPO Sales Program Washington. D. C. 20555 1

l

NUREG-0580 Vol.11, No.6 l

REGULATORY LICENSING STATUS

SUMMARY

REPORT l

NUCLEAR POWER PLANTS DATA FOR DECISIONS l

(BLUE BOOK) l MAY 16 - JUNE 16,1982

$ ate ENiihe u

1982 Prepared for: OFFICE OF NUCLEAR REACTOR REGULATION Prepared by: OFFICE OF RESOURCE MANAGEMENT U.S. NUCLEAR REGULATORY COMMISSION l

WASHINGTON, D.C. 20555 f

r'

F0REWDRD THIS MANAGEMENT REPORT, REGULATORY LICENSING STATUS

SUMMARY

REPORT, IS DESIGHED TO PROVIDE THE NECESSARY INFORMATIDH FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTR A8 "TATIDH HUCLEAR REACTOR APPLICATIONS. IT UTILIZES DATA COLLECTED FROM THE OFFICE OF NUCLEAR k;ACn0R REGULATIOH, OFFICE OF THE EXECUTIVE LEGAL DIRECTOR, OFFICE OF INSPECTION & EHFORCEMENT, AND THE HATIONAL LABORATORIES, AND ANALY2ED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE IMPLEMENTATION OF THE REGULATORY INFORMATIO:1 SYSTEM.

SECTION I 0F THIS EDITION CONSISTS OF THE THREE SUMM4RY OF ACCOMPLISHMENTS, THE HEW APPLICATION FORECAST FOR OL'S AHD CP'S, AND AN ABBREVIATION KEY.

SECTION II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATI0H. ALL OL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGH REVIEWS, OTHER REVIEWS, AND FINALLY, A H0H-POWER REACTOR

SUMMARY

. EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS F6R ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATEWS FOR ALL KEY MILESTONES IN THE REVIEW.

r s

t l

N k t

\\

~

>a k,

',h

/ %

LICENSING 0F HUCLEAR REACT 0RS I

4 THE U.S.

NUCLEAR REGULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOTHER

\\ TO OPERATE IT.

LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTIDH PERMIT AND OPERATING f

LICENSE.

THE UTILITY,uuBMITS A FORMAL APPLICATION DESCRIBING THE DESIGN, LOCATION, AND ENVIRONMENTAL IMPACT OF THE PROPOSED PLANT AND THE SAFEGUARDS TO BE PROVIDED. THE APPLICATION ALSO COVERS THE UTILITY'S FINANCI AL QUALIFICATIONS.

TECHNICAL THE NRC MAKES CCPIES OF* THE APPLT;ATION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM.

DOCUMENTS AREtALSQ MADE.AVAILABLE IN THE PUBLIC DOCUMENT ROOM.

THESE EXPERTS ANALYSE THE APPLICATION, AND PREPARE A SAFETY EVALUATION AND AN ENVIRDRMENTAL IMPACT STATEMEN7.

N

/

4

- 4 THE STAFF'S ANALYSIS IS SUBMITTED TO THE NRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A COMMITTEE OF INDEFENDENT EXPERTS. ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFERENCES WITH THE APPLICANT, THE LICENSING STAFF AND OTHERS. THE ACRS FINDINGS ARE REPORTED TO THE NRC AND MADE PUBLIC.

A PUBLIC HEARING IS HELD, USUALLY NEAR THE PROPOSED SITE, BY AH HRC APPOINTED ATOMIC SAFETY & LICENSING BOARD. PRIVATE CITIZENS, STATE AND LOCAL OFFICI ALS, AND COMMUNITY GROUPS MAY PARTICIPATE.

AFTER REVIEWING THE HEARING RECORD INCLUDING THE NRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST GRANTING A CONSTRUCTION PERMIT.

THE BOARD'S DECISION IS REVIEWZD BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER HUCLEAR REGULATORY COMMISSION.

IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTION PERMIT, THE DIRECTOR OF THE DIVISION OF LICENSING WILL ISSUE A CONSTRUCTION PERMIT. AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE l

CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE NRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTION BY THE OFFICE OF INSPECTION AND ENFORCEMENT.

AS CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE NRC FOR AN OPERATING LICENSE. THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE NRC IN DECIDING WHETHER OR NOT TO ISSUE THE OPERATING LICENSE.

IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE CONSTRUCTION PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED. FINAL ISSUANCE OF AN OPERATING PERMIT IS SUBJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISION OF LICENSING AND OF THE COMMISSION.

(

TA B L E O F C0N T ENT S PRINTED IN THE ORDER LISTED SECT ION I

SUMMARY

OF ACCOMPLISHMENTS OL SUM l1 A R Y OF ACC0f1PLISHMENTS CP SUf;tfARY OF ACCC:1PLISHMENTS COMBINED NUr:ERICAL SUf;i1ARY OF ACCOMPLISHMENTS TARGET DATES OF LICENSI!!G ST EPS FOR PLANTS SEEKING OPERATING LICENSES IH THE HEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTION PERf!ITS IN THE NEXT FIVE YEARS NEW APPLICATION FORECAST:

OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS SPECIAL REVIEWS COMMON ABBREVIATIONS USED WITHIH THE PUBLICATION l

5ECT IOH I I PROJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS HON-POWER REACTORS SECT ION I II EXAMPLE REVIEW

E O

H

)**

U LJ th

OL

SUMMARY

0F ACC0MPLISHMENTS AS OF JUNE 16, 1982 JMHf FISCAL YEAR TO DATE I

FACILITY SCHEDULED ACTUAL FACILITY SCHEDULED ACTUAL

$ER ' S SER ' S NOME BYRON 1 82 02/07/82 02/07/82C CALLAWAY 1 10/07/81 10/07/81C CLINTON 1 82 01/05/82 02/17/82C MIDLAND 1 8 2 05/11/82 05/11/82C PALO VERDE 1,2,3 11/11/81 11/11/81C PERRY 1 8 2 05/10/82 05/24/82C i

ST LUCIE 2 10/09/81 10/09/81C l

WASHINGTON NUCLEAR 2 03/31/82 03/31/82C WOLF CREEK 1 04/07/82 04/07/82C 5SER ' S SSER ' S GRAND GULF 1 82 06/16/82C BYRON 1 82 03/30/82 03/30/82C CALLAWAY 1 01/15/82 Ot/15/82C CONANCHE PEAK t 82 10/16/81 10/16/81C CCMANCHE PEAK 1 82 01/20/82 01/20/82C DIABLO-CAN)..' 1 82 10/02/51C ENRICO FERMI 2 01/26/82 01/29/82C GRAND GULF 1 82 12/10/81C GRAND GULF 1 8 2 05/14/82 06/16/82C LASALLE 1 82 02/12/82 02/12/82C LASALLE 1 82 04/16/82 04/16/82C PALD VERDE 1,2,3 02/05/82 02/05/82C PALO VERDE 1,2,3 05/17/82 05/17/82C SAN ONOFRE 2 8 3 01/22/82 01/22/82C SAN ONOFRE 2 8 3 02/16/82 02/16/82C SHOREHA*

03/12/82C ST LUCI. 2 12/30/81 12/30/81C SUMMER 1 01/08/82 01/08/82C WATERFORD 3 10/09/81 10/13/81C WATERFORD 3 01/22/82 01/13/82C WATERFORD 3 04/30/82 04/30/82C ZIMMER 1 10/00/81 10/00/81C DE5

'S DES ' S NONE BYRON 1 82 11/05/81 tt/05/81C CLINTON 1 82 12/18/81 12/28/81C MIDLAND 1 82 02/05/82 02/05/82C PALO VERDE 1,2,3 10/26/81 10/26/81C PERRY 1 82 02/26/82 02/26/82C SEABROOK 1 82 05/14/82 05/14/82C ST LUCIE 2 10/16/81 10/16/81C WOLF CREEK 1 01/05/82 01/05/82C l

l

i1 lll l

lll CCCCCCCC 22212212 L

88888888 A

////////

U 59091311 T

02201231 C

/ ///////

A 41503426 00010010 D

E E

222 2212 2

T L

88S 8888 8

A U

/// ////

/

D D

590 1311 0

E 022 1231 0

O H

/ // ////

/

T C

415 3426 6

S 000 0010 0

R A

E Y

S L

A T

C S

2 H

I F

R E

A E

D 23, M

Y L

82, C

E T

U 2

H I

2 L

11 N1 U

S I

2 3

8 C

1 FE2NK S

I A

8 1 LD OE 1

F Y

URETE S

ANGEIGR E

1 L

WO VCNC I

L P 2 HATD UI L

8 S

OLNNOLHF A

M 9

RLIAL SL S

YALRATAO S

A 1

O BCCGPSWW L

S C

1 E

L 6

C E

F O

A N

U J

F F O

0 S

A C

Y 2

L 8

R A

/

U 1

A T

1 C

/

M A

6 0

M U

S D

E 2

2 L

8 8

U

/

/

L D

1 0

E 1

0 0

H

/

/

C 6

6 S

0 0

E N

U J

D Y

T E

I 2

L 1

U I

4 C

K S

1 A

E F

E S

R E

C I

L R

L E

S F

A W

L S

0 O

S A

W L

S L

L E

L U

F F

0 il lllllll lll l

llll

CC C

11 2

L 88 8

A

//

/

U 00 4

T 30 0

C

//

/

A 00 5

11 0

D E

E 11 2

T L

88 8

A U

//

/

D D

50 4

E 10 0

O H

//

/

T C

00 5

S 11 0

R A

E Y

S L

A T

C S

N I

F 2

2 E

8 8

1 1

D M

Y 1D D

E T

H I

R R

L KO O

U S

I EF F

C EN N

S I

A RA A

F CH H

S L

/

/

S ST T

I P 2 NI I

8 S

E EG S

G S

E E

M 9

N LA A

N H

1 O

R LK K

O S

D 0

N AS S

N N

R E

S S

C 6

1 E

S E

F P

C E

S S

D F

C A

N U

J F F O

0 S

A Y

L R

A U

A T

C M

A M

U S

D E

L U

P D

E C

H C

S E

N U

J D

Y T

E I

L U

I C

S A

F S

S I

E S

E S

E E

S E

N N

N N

N O

R O

O O

S O

H H

N H

N R

E S

E S

E E

P S

S D

F C

I

!l1l 1

1l l

l1lll L

A U

T9 0

1 2

8 1

8 0

O 0

C 2

A D

E L

EU TD9 0

8 2 8

1 7

0 1

0 AE 1

D H C

OS T

R A

E Y

S L

W T

A D D C

N S

)

)

E E I

E F

)

)

L P

)

)

)

)

U U M

L P

0 C L

P L

P S S H

0 C

(

(

0 C 0 C S S S

(

(

S S

(

t

(

(

I I

I S S S S

% S 2

L 8

R R S S 9

1 R R E E S S S S P

E E S S E E E E L

P M

6 0

1 S S S S D D F F 0 C C E N

C U

J A

F O

F S L

A A

0 U

T0 0

1 0

0 0

1 0

0 0

C A

Y R

A M

M D

U E

L S

U D0 0

0 0

0 0

1 0

1 0

E H

C S

D D E

)

)

E E N

U

)

)

L P

)

)

)

)

U U J

L P

0 C L

P L

P S S 0 C

(

(

0 C 0 C S S

(

(

S S

(

(

(

C I

I R

S S S S S S EW R R S S O

P R R E E S S S S L

E E S S E E E E L

P L

U

$ 5 S S D D F F 0 C F

M 1

lll l

1l I

ll l

LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS OF: 06/16/82 (INCLUDES SCHEDULES FOR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTION COMPLETION IN CY 1982-1983)

(LISTED IN ORDER OF FACILITY NAME)

SER SSER EST.

STAFF TECH STAFF TECH ASLB COMM*

APPL.

DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

CONST.

PLANT (MONTHS) Dfd TO DL 1ER t1LQ Ef1 TO DL 11B 0F HRG DECISION DAll COMPL.

BELLEFONTE 1 0

11/82 02/83 03/83 04/83 05/83 05/83 06/83 N/A N/A 08/83 09/83 BYRON 1 0

11/81C 01/82C 02/82C 03/82C 04/82C 05/82C 03/82C 08/82 04/83 04/83 04/83 l

CALLAWAY 1 0

09/81C 09/81C 10/81C 11/81C 01/82C 01/82C 01/82C 11/81C 01/83 05/83 06/83 CLINTON 1 0

12/81C 09/80C 02/82C 03/82C 05/82C 06/82 06/82 11/82 09/83 12/83 01/84 COMANCHE PEAK 1 0

05/8tc 07/81C 07/81C 11/8 tc 09/81C 01/83 07/82 12/81C 09/82 05/83 06/83 l

DIABLO CANYON 1 0

12/72C 01/75C 10/74C 07/76C 05/76C 06/82 07/82 12/76C 07/82 I

DIABLO CANYON 2 0

12/72C 01/75C 10/74C 07/76C 05/76C 06/82 N/S 12/76C 07/82 ENRICO FERMI 2 0

04/81C 05/77C 09/77C 08/81C 09/81C 08/82 09/82 03/82C 08/82 05/83 06/83 GRAND GULF 1 0

05/81C 08/81C 09/81C 10/81C 10/81C 07/82C 07/82 N/A N/A 08/82 06/82C LASALLE 1 0

03/78C 02/81C 03/81C 04/81C l'/78C 06/82 06/82 N/A N/A 06/82 04/82C LASALLE 2 0

03/78C 02/81C 03/81C 04/81C 11/78C 06/82 11/82 N/A N/A 12/82 01/83 MCGUIRE 2 0

10/75C 01/78C 03/78C 04/78C 04/76C 12/82 01/83 03/77C 06/81C 03/83 04/83 MIDLAND 1 0

02/82C 04/82C 05/82C 06/82C 07/82 06/82C 07/82 11/83 06/83 11/83 12/83 MIDLAND 2 0

02/82C 04/82C 05/82C 06/82C 07/82 06/82C 07/82 11/82 06/83 07/83 07/A3 PALO VERDE t 0

10/81C 10/81C 11/81C 12/81C 03/82C 07/82 07/82 04/82C 10/82 11/82 11/82 PALD VERDE 2 0

10/81C 10/81C 11/81C 12/81C 03/82C 07/82 10/83 04/82C 10/82 10/83 11/83 PERRY t 0

02/82C 05/82C 05/82C 07/82 07/82 07/82 07/82 11/82 04/83 10/83 11/83 SAN ONOFRE 2 0

01/81C 01/81C 02/81C 02/81C 04/81C 06/82 06/82 06/81C 05/82C 06/82 02/82C SAN ONOFRE 3 0

01/81C Ot/81C 02/8tC 02/8tC 04/8tC 06/82 08/82 06/81C 05/82C 10/82 11/82 SEABROOK 1 0

05/82C 08/82 09/82 10/82 10/82 10/82 10/82 03/83 10/83 11/83 11/83

$HOREHAM 3

03/77C 03/81C 04/81C 10/81C 10/77C 08/82 09/82 05/82C 03/83 03/83 09/82 ST LUCIE 2 0

10/81C 09/81C 10/81C 11/81C 04/82C 07/82 08/82 N/A N/A 09/82 10/82 SUMMER 1 0

06/79C 12/80C 02/81C 03/81C 05/81C 06/82 07/82 06/81C 07/82 08/82 07/82 SUSQUEHANNA 1 0

03/81C 03/81C 04/81C 08/81C 07/81C 06/82C 07/82 10/81C 04/82C 03/82 07/82

-SUSQUEHANNA 2 0

03/81C 03/81C 04/81C 08/81C 07/81C 06/82C 03/83 10/81C 04/82C 12/83 01/84 WASHINGTON HUCLEAR 2 0

07/81C 05/82C 03/82C 09/82 12/81C 09/82 10/82 N/A N/A 08/83 09/83 WATERFORD 3 0

05/8tC 05/8tC 07/81C 08/81C 09/81C 06/82 07/82 03/82C 09/82 12/82 O f/83 WATTS BAR 1 0

06/78C 05/82C 06/82 08/82 12/78C 08/82 09/82 N/A N/A 07/83 08/83 WOLF CREEK 1 0

01/82C 03/82C 04/82C 05/82C 06/82C 08/82 08/82 10/82 03/83 11/83 12/83 EIMMER t 0

10/76C 12/77C Ot/79C 03/79C 06/77C 06/82 07/82 02/82C 06/82C 11/82 12/82 DLICENSING SCHEDULES AND DECISION DATES DO MOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDNESS REVIEW.

I LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY 1983 ISSUE APPL. CCNST PLANT 1S13 COMPLETE BELLEFONTE 2 N/S 09/84 BRAIDWOOD 1 05/84 04/85 BRAIDWOOD 2 04/86 BYRON 2 N/S 12/84 CATAWBA 1 04/83 10/84 CATAWBA 2 N/S 10/86 CLINTON 2 N/S COMANCHE PEAK 2 11/83 12/84 FERMI 2 (FSAR RESUB)

GRAND GULF 2 N/S N/S HARRIS 1 01/84 12/84 HARRIS 2 N/S 06/88 LITTERICK 1 10/83 10/84 LIMERICK 2 10/86 PALO VERDE 3 N/S 11/85 PERRY 2 05/87 RIVER BEND 1 11/82 04/85 RIVER BEND 2 N/S SEABROOK 2 02/86 SOUTH TEXAS 1 08/33 12/86 SOUTH TEXAS 2 N/S 12/88 WASHINGTON NUCLEAR 1 N/S 12/85 WASHINGTON NUCLEAR 3 07/84 06/86 WATTS CAR 2 06/84 08/84 1

LICEHSING SCHEDULES FOR ALL PENDING CP APPLICATIGNS REPORT AS OF: 06/16/82 (LISTED IN ORDER OF FACILITY NAME)

SER SSER STAFF TECH STAFF TECH ASLB COMM ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

PLANT D11 TO DL ifR t1IS fil TO DL 11f3 0F HRG DECISION M

(SP)FHP 1-8 (MANUF.)

07/74C 08/75C 09/75C 04/76C 10/756 03/76C 09/81C 06/76C 06/82 08/82 ALLENS CREEK 1 07/74C ti/74C 11/74C 12/74C 11/74C 03/75C 10/81C 03/75C 11/82 11/82 CLINCH RIVER 02/76C Of/83 03/83 05/83 02/77C 06/83 07/83 07/82 05/84 06/84 PEBBLE SPRINGS 1 12 01/75C 12/75C 01/76C 02/76C 04/75C 12/77C N/S N/S H/S N/S SKAGIT/HANFORL 122 05/82C 07/77C 08/77C J7/82 08/82 04/82C 06/82 07/75C 04/83 07/83

NEW APPLICATION F 0 R E C A S T --- 0 P E R A T I N G LICENSE REVIEWS (ANTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)

AS OF WEEK ENDING: 06/16/82 DOCKET PROJECT SUBMITS SUBMITS CONST.

l LICENSING APPL.

APPL.

1ST UNIT FACILITY NUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL l

FY82l WASHINGTON NUCLEAR 1 050-00460 WASHINGTON PUBLIC POWER SUPPLY

. UNASSIGNED 12/00/8tC 12/00/8tC 12/00/85 M. YOUNG l

IWASHINGTON NUCLEAR 3 050 WASHINGTON PUBLIC POWER SUPPLY

. UNASSIGNED 06/02/82C 06/00/82C 06/00/86 D.SWANSON I

______________-00508 FY83 MARBLE NILL 1 12 054680547 PUBLIC SERVICE OF INDIANA E.DOOLITTLE 12/00/82 12/00/82 06/00/86 R.LESSY MILLSTONE 3 050-00423 NORTNEAST NUCLEAR ENERGY J. GRANT 12/00/82 12/00/82 12/00/85 M.ROTNSCHILD BEAVER VALLEY 2 050-00412 DUQUESNE LIGHT E.DOOLITTLE 12/31/82 12/31/82 12/00/85 J.GUTEIRREZ HINE MILE POINT 2 050-00410 HIAGARA MOHAWK POWER D. LYNCH 01/00/83 01/00/83 03/00/86 B.BORDENICK HOPE CREEK 1 050-00354 PUBLIC SERVICE ELECTRIC 8 GAS

. UNASSIGNED 06/00/83 06/00/83 06/00/86 R. BLACK V0GTLE 1 82 0424-0425 GEORGIA POWER J. GRANT 09/00/83 09/00/83 09/00/86 B.BORDENICK FY86l NORTH ANNA 3 050-00404 VIRGINIA ELECTRIC 8 POWER

.UHASSIGNED 04/00/86 04/00/86 04/00/89 R. GODDARD l

l 4

i

~

1, lll l

l

.ll R

A E __ _ _

_ST_ _4_

_PA_

8_

D_

g /

_0_

e

._ _0_

_ L PB_

/

PU_

0_

AS_ _1 S

T I

E_

t M

_ RT_

e 4_

EA_

8_

D_

_ /

R 0_

E

_ L 0_

_ /

PB_

P

_ PU_

0_

_ 1

_ AS_ _ _

N O

I T

_ _ H_

TR_

_ _ O_

C CE_

S __

EG_

L_

U JA I

R

_ ON_ _ W_

RA_

PM_

J_

T W

2

$ 8

/ _ T N

6

_ CR_ _ _

1

_ EE_

JB 0 / _

6

_ OM_

_9_

_5_

C 0

_ RU_

PH_ _5_

G T

N I

$ D N

A E

C K E

E E

W _

R F

0 O

_N_

_O_

_S_

F S A

_ _I

_D_

_ E __

N

_H_

O

_ _ T_

_ _ L_

I

_ _ A_

E_

_ _ W Y_

T T

_ N_

A I_

O_

_ _ M L_

I

. M_

C T_

. O_

I O_

WC_

L P

P A

W

__2_

E H

_ _1

_ Y

_ T

_ _ L_

__ L __

_I

_L

_O_

_IE_

R

_ R_

_CM_

_ A_

_AA _ _

_FH_

C_

_II

_ _l illl.

1

C0MM0N ABBREVIATIONS USED WITHIN THE PUBLICA TION ACRS ADVISORY COMMITTEE CH REACTOR SAFEGUARDS L.A.:

LICENSING ASSISTANT AE2 ARCHITECT / ENGINEER LESRs LIMITED EARLY SITE REVIEW (ALSO ABBR'EVIATED LES)

AEB ACCIDENT EVALUATION BRANCH LGR:

LICENSING GUIDANCE BRANCH ASB:

AUXILIARY SYSTEMS BRANCH LMFBR: LIQUID METAL FAST BREEDER REACTOR ASLB: ATOMIC SAFETY LICENSING BOARD LQB:

LICENSEE QUALIFICATIONS BRANCH B8R:

BURNS 8 ROE MEB:

MECHANICAL ENGINEERING BRANCH B8V:

BLACK 8 VEACH MPA:

MANAGEMENT AND PROGRAM ANALYSIS B8W:

BABCOCK 8 WILC0X MTEB MATERIALS ENGINEERING BRANCH BECH: BECHTEL MEW:

MEGAWATTS ELECTRIC BRRT: BROWN 8 ROOT MWT:

MEGAWATTS THERMAL BWR:

BOILING WATER REACTOR NSSS: NUCLEAR STEAM SYSTEMS SUPPLIER l

l l

CEB:

CHEMICAL ENGINEERING BRANCH OL:

OPERATING LICENSE COMB COMBUSTION ENGINEERING OLB:

OPERATOR LICENSING BRANCH CP:

CONSTRUCTION PERMIT OPS:

OFFSHORE POWER SYSTEMS CPB CORE PERFORMANCE BRANCH CSB:

CONTAINMENT SYSTEMS BRANCH CWE:

COMMONWEALTH EDISON PDA:

PRELIMINARY DESIGN APPROVAL PG8E: PACIFIC GAS 4 ELECTRIC DES:

DRAFT ENVIRONMENTAL STATEMENT PID:

PARTIAL INITIAL DECISIDH I

PM:

PROJECT MANAGER PS:

POWER SYSTEMS BRANCH EEB ENVIRONMENTAL ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:

ENVIRONMENTAL PROTECTION AGENCY PTRB: PROCEDURES AND TEST REVIEW BRANCH l

EPLB: EMERGENCY PREPAREDNESS LICENSING BRANCH PWR:

PRESSURIZED WATER REACTOR ER:

ENVIRONMENTAL REPORT EQB EQUIPMENT QUALIFICATION BRANCH ESR:

EARLY SITE REVIEW QAB QUALITY ASSURANCE BRANCH ETSB: EFFLUENT TREATMENT SYSTEMS BRANCH RAB RADIOLOGICAL ASSESSMENT BRANCH F.R.:

FEDERAL REGISTAR RSB REACTOR SYSTEMS BRANCH FDA*

FINAL DESIGN APPROVAL FES:

FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT S8L SARGENT 8 LUNDY S8W STONE & WEBSTER SAB:

SITING ANALYSIS BRANCH G8H GIBBS 8 HILL SAR:

SAFETY ANALYSIS REPORT GHDRs GIBBS 8 HILL SDA:

STANDARD DESIGN APPROVAL GIL:

GILBERT COMMONWEALTH SEB STRUCTURAL ENGINEERING BRANCH GSB GEOSCIENCES BRANCH SER:

SAFETY EVALUATION REPORT SIB:

SYSTEMS INTERACTION BRANCH SP:

SPECIAL PROJECT HGB:

HYDROLOGIC AND GE0 TECHNICAL BRANCH SSC:

SOUTHERN SERVICES COMPANY HTGR HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUPPLEMENT TO SAFETY EVALUATION i

l TVA:

TENNESSEE VALLEY AUTHORITY ICB INSTRUMENTATION AND CONTROL BRANCH l

UEC:

UNITED ENG. 3 CONSTRUCTORS UFB:

UTILITY FINANCE BRANCH WEST: WESTINGHOUSE i

xz[

/ /,

s s

s s

s s

N s

x s

s s

s s

s s

s s

s s

s s

s s

s s

s s

s s

s s

s s

/

i n

/

1 f

0 x

j s

s s

s s

s s

s 1

/

1 s

s s

s s

s

///

s

PR0J ECT INDEX SECTION II OPERATING LICENSE REVIEW CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS 2-1 BELLEFONTE 1 82 2-34 ALLENS CREEK 1 2-38 (BOP)BOPSSAR/BSAR-205 2-48 (SP)FHP 1-8 (MANUF.)

2-2 BRAIDWOOD 1 42 2-35 CLINCH RIVER 2-39 (BOP)ESSAR/BSAR-205 2-49 BLUE HILLS SITE 2-3 BYRON 1 8 2 2-36 PEBBLE SPRINGS 1 8 2 2-40 (BOP)ESSAR/CESSAR-80 2-50 CARROLL SITE 2-4 CALLAWAY 1 2-37 SKAGIT/HANFORD 182 2-41 (BOP)ESSAR/RESAR-414 2-5 CATAWBA 1 8 2 2-42 (BOP)GAISSAR 2-6 CLINTON 1 8 2 2-43 (BOP)GIBBSSAR (W) 2-7 COMANCHE PEAK 1 8 2 2-44 (BOP)SWESSAR/BSAR-205 2-8 DIABLO-CANYOH 1 8 2 2-45 (HSS)CESSAR SYSTEM 80 2-9 ENRICO FERMI 2 2-46 (HSS)GESSAR SEVERE ACC 2-10 FERMI 2 (FSAR RESUB) 2-47 (HSS)GESSAR-238 NI 2-11 GRAND GULF 1 8 2 2-12 HARRIS 1 8 2 2-13 LASALLE 1 3 2 2-14 LIMERICK 1 8 2 2-15 MCGUIRE 2 2-16 MIDLAND 1 8 2 2-17 PALO VERDE 1,2,3 2-18 PERRY 1 8 2 2-19 RIVER BEND 1 8 2 i

l 2-20 SAN OHOFRE 2 4 3 1

2-21 SEABROOK 1 &2 2-22 SHOREHAM 2-23 SOUTH TEXAS 1 8 2 2-24 ST LUCIE 2 2-25 SUMMER 1 2-26 SUSQUEHANNA 1 82 2-27 WASHINGTON HUCLEAR 1 2-28 WASHINGTON NUCLEAR 2 2-29 WASHINGTON HUCLEAR 3 2-30 WATERFORD 3 2-31 WATTS BAR 1 8 2 2-32 WOLF CREEK 1 2-33 ZIMMER 1 l

NRR L ICENSING SYSTEM PAGE NO: 2-1 EELLEFONTE 1 &2 0L CURRENT S.T A T U $

REP 0RT REPORT AS OF 06/16/82 PLANT CHA RACTERI$T I C St KEY PERS0NNEL:

DOCKET NO:

043880439 LIC. PM:

D.

SCALETTI ASLB CHAIR: N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E.

ADENSAM MEMBER 18 N/A LOCATION:

6 MI NE OF SCOTTSBORD, ALA LIC. LA.:

M.

DUNCAN MEMBER 2 N/A REGION:

2 AE:

TVA COUNSEL:

B. PATON CONST. INSP: R. CRLENJAK REAC. TYPE: PWR NSSS: B&W ANTITRUST:

J.

RUTBERG RESID. INSP J. WILCOX DESIGN PWR 3760 MWT/1235 MWE CONST: TVA RM ANALYST:

M.

KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILEETONES:

SCHED. DATE ACTUAL DATE As a result of applicant's construction delav, the review schedule has been delayed.

The applicant has ER LOCKETED:

06/12/78 06/12/78C announced a delay in loading fuel to 09/83.

The ER SITE VISIT COMPLETE:

02/20/82 06/17/82C staff is currently evaluating the impacts of this INPUT TO DES TO PM:

09/30/82 delay on the safety review schedule.

ISSUE DES:

11/22/82 RESPONSE TO COMMENTS ON DES:

04/22/83 ISSUE FES:

05/20/83 CURRENT ENV. STATUS:

As a result of applicant's construction delay, the revieu schedule was delayed, and i s being re-evalua ted.

SAFETY / HEARING MILESTONES:

The environmental site visit was completed on 6/17/82.

The Draft Environmental Statement is scheduled to be APPLICATION TENDERED:

02/03/78 02/03/78C issued 11/22/82.

SAR DOCKETED:

06/12/78C SAR Q'S RECEIVED BY PM:

07/03/80 04/02/82C SAR APPL RESPONSE TO Q'S RECEIVED: 06/25/82 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO FM:

08/13/82 No hearing is anticipated.

ISSUE DRAFT SER:

INPUT TO SER:

02/11/83 ISSUE SER:

03/10/83 ACRS FULL COMMITTEE MEETING:

04/15/83 l

INPUTS TO SE SUPPLEMENT 18 05/27/83 ISSUE SE SUPPLEMENT 18 06/24/83 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Pending determination HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A ASLB FINAL DECISION:

08/00/83 TECH SPECS COMPLETED:

07/29/83 COMMISSION DECISION:

08/00/83 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

09/00/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

On 04/14/S2 TVA revised fuel load date to 09/83.

CONSTRUCTION COMPLETION - APPL.:

09/00/83 04/14/82 Staff is evaluating impact on safety review schedule.

l NRR LICENS ING SYSTEM PAGE NO: 2-2 BRAIDWOOD 1 8 2 0L CURRENT STA TUS REPORT REPORT AS OF 06/16/82 PLANT CHARACT E R I $ T I C S:

K EY P E R S 0 N N E L:

LIC. PM:

K.

KIPER ASLB CHAIR:

M.

MILLER DOCKET NO:

045680457 LIC. BC:

J. YOUNGBLOOD MEMBER 1:

R.

COLE APPLICAHT:

COMM0HWEALTH EDISON LOCATION:

24 NI SSW OF JOLIET, ILL LIC. LA.

M.

RUSHBROOK MEMBER 2:

D. CALLIHAN REGION:

3 AE

$8L COUNSEL:

D. HASSELL CONST. INSP:

J. NEISLER REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B.

V0GLER RESID. INSP L. MCGREGOR DESIGN PWR 3425 MWT/1120 MWE CONST: CWE RM ANALYST:

M.

KING ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE l

CURRENT SAF. STATUS:

Several portions are under contract review.

11/30/78C l

ER DOCKETED:

ER SITE VISIT COMPLETE:

04/15/83 INPUT TO DES TO PM:

11/01/83 ISSUE DES:

01/00/84 RESPONSE TO COMMENTS OH DES:

04/01/84 ISSUE FES:

06/00/84 CURRENT ENV. STATUS:

Inactive.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C i

l SAR Q'S RECEIVED BY PM 12/01/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 03/01/83 INPUT TO DRAFT SER TO PM:

05/01/83 CURRENT HRG. STATUS:

ISSUE DRAFT SER:

09/20/83 l

There will be a contested hearing.

INPUT TO SER:

11/01/83

(

ISSUE SER:

12/01/83 j

ACRS FULL COMMITTEE MEETING:

01/00/84 INPUTS TO SE SUPPLEMENT 12 04/01/84 ISSUE SE SUPPLEMENT 1:

05/00/84 FEMA LETTER RECEIVED:

N/S l

l CURRENT ANTITRUST:

Applic(nt has submitted antitrust information pursuant to HEARING STARTED:

10/00/84 ASLB INITIAL DECISI0H:

03/00/85 Reg. Guide 9.3.

ASLB FINAL DECISION:

04/00/85 TECH SPECS COMPLETED:

09/00/84 COMMISSIGH DECISION:

04/00/85 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

04/00/85 LATEST AMENDMENT:

FSAR Amendment Ho. 37 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

04/00/85 04/14/82

HRR L ICENS ING SYSTEM PAGE HO: 2-3 BYRON 1 &2 0L CURRENT STATUS REPQRT REPORT AS OF: 06/16/82 PLAHT C H A R A C T E R I S T I C $8 KEY PERSONN EL DOCKET HO 045480455 LIC, PM:

S. CHESHUT ASLB CHAIR:

M. MILLER APPLICANT:

COMMONWEALTH EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 12 R. COLE LOCATION:

17 MI SW OF ROCKFORD, ILL LIC. LA.:

M. RUSHBROOK MEMBER 22 D. CALLIHAN REGION:

3 AE S&L COUNSEL:

S. GOLDBERG CONST. INSP J.

NEISLER REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP W.

FORNEY DESIGH PWR 3425 MWT/1120 MWE CONST: CWE RM ANALYST:

M. KING l

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER and Supplement 1 have been issued. Several outstanding and confirmatory issues remain to be ER DOCKETED:

11/30/78C resolved prior to licensing.

ER SITE VISIT COMPLETE:

05/31/81 05/31/81C INPUT TO DES TO PM:

08/15/81 08/15/81C ISSUE DES:

11/05/81 11/05/81C RESPONSE TO COMMENTS ON DES:

03/01/82 0 3/ 01/82C ISSUE FES:

04/05/82 04/05/82C i

CURREHT ENV. STATUS:

Environmental review completed and FES (HUREG-0848) published in April 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDEREDi 06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:

08/15/81 08/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED 10/15/81 10/15/81C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/07/81 11/ 07/81C In discovery. Hearing scheduled to commence in ISSUE DRAFT SER:

August 1982.

INPUT TO SER:

01/07/82 01/07/82C ISSUE SER:

02/07/82 02/07/82C ACRS LETTER RECEIVED:

03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 18 05/10/82 05/10/82C ISSUE SE SUPPLEMENT 1 03/30/82 03/30/82C FEMA LETTER RECEIVED:

N/S CURRENT AHTITRUST Applicant has submitted antitrust information pursuant HEARING STARTED:

08/18/82 to Reg. Guide 9.3.

ASLB INITIAL DECISION:

04/00/83 ASLB FINAL DECISION:

04/00/83 TECH SPECS COMPLETED:

03/30/83 COMMISSION DECISION:

04/00/83 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

04/00/83 FSAR - Amendment 37 ER - Amendment 3 SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

04/00/83 04/14/82

HRR L ICEN SING SYSTEM PAGE NO:

2-4 CALLAWAY 1 0L CURRENT ST A TUS R EP ORT REPORT AS OF 06/16/82

(

PLA NT C H A R A C T E R I S T I C S:

K EY P E R S 0 N N E L:

LIC. PM:

G.

EDISON ASLB CHAIR:

J.

GLEASON DOCKET NO:

05000483 APPLICANT:

UNION ELECTRIC LIC. BC:

B. YOUNGSLOOD MEMBER 1:

G.

BRIGHT LOCATION:

10 MI SE OF FULTON, MO LIC. LA.

M.

RUSHBROOK MEMBER 2:

J.

KLINE REGION:

3 AE:

BECH COUNSEL:

R.

LESSY CONST. IHSP:

J.

KONKLIH REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP:

J.

NEISLER DESIGH,PWR: 3425 MWT/1188 MWE CONST: DANIEL RM AHALYST D.

SCHWARZ ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SAR was docketed 08/08/80.

The SER was issued by HRC on 10/07/81 and the SER Supplement No. 1 was issued on ER DOCKETED:

12/12/80 12/12 / 8 0 C ER SITE VISIT COMPLETE:

12/00/81 12/00/81C 01/1S/82.

INPUT TO DES TO PM:

08/01/81 0 8 / 01/ 81 C ISSUE DES:

09/29/81 C9/29/81C RESPONSE TO COMMENTS ON DES:

12/01/81 12/01/81C ISSUE rES:

01/29/82 01/29/82C CURRENT EHV. STATUS:

ER was docketed 12/12/80.

The DES was issued by NRC on 09/29/81 and the FES was issued on 01/29/82.

SAFETY / HEARING MILESTOH2S:

APPLICATION TENDERED:

10/25/79 10/25/79C SAR DOCKETED:

08/08/80 OS/08/80C SAR Q'S RECEIVED BY PM:

12/18/80 12/18/80C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10 / 01/81 C INPUT TO DRAFT SER TO PM:

CURRENT HRG. STATUS:

A board has been appointed to rule on the intervention ISSUE DRAFT SER:

N/A petition. Hearings were held on limited issues during INPUT TO SER:

09/11/81 09/11/81C November 1981.

The hearing on the one remaining ISSUE SER:

10/07/81 10/07/81C contention, emergency preparedness, is expected to begin September 27, 1982.

ACRS LETTER RECEIVED:

11/19/81 11/19/81C INPUTS TO SE SUPPLEMENT 1:

01/01/82 01/01/82C ISSUE SE SUPPLEMENT 1:

01/15/82 01/1S/82C FEMA LETTER RECEIVED:

01/01/82 01/01/82C CURRENT ANTITRUST:

HEARING STARTED:

11/17/81 11/17 / 81 C OL review is in progress.

ASLB INITIAL DECISION:

01/00/83 ASLB FINAL DECISION 02/00/83 TECH SPECS COMPLETED:

N/S COMMISSION DECISI0H:

05/00/83 ISSUE LIC. WITH POWER RESTRICTION: 06/00/83 ISSUE FULL POWER LICENSE AMEND:

10/00/83 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

The Caseload Forecast Panel has revised construction CONSTRUCTION COMPLETION - APPL.:

06/00/83 04/14/81 completion from February 1983 to June 1983.

The June 1983 estimate is based on the applicant's revised fuel load date.

t NR R L ICENS IHG SYST EM PAGE NO:

2-5 CATAWBA 1 42 0L CURRENT STA TUS REPORT REPORT AS OF: 06/16/82 PL A H T CHAR ACT ERIS T I C St KEY P ERS0NN E L:

DOCKET HO 041340414 LIC. PM:

K.

JABBOUR ASLB CHAIR:

J.

KELLEY APPLICANT:

DUKE POWER LIC. BC:

E.

ADENSAM MEMBER 1:

D.

CALLIHAN LOCATION:

6 MI NHW OF ROCK HILL, SC LIC. LA.

M.

DUNCAH MEMBER 2:

R.

FOSTER REGIDH:

2 AE DUKE COUNSEL:

G.

JOHHSON CONST. INSP:

P.

VAND00RN REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP:

K.

VAN D00RH DESIGH PWR: 3582 MWT/1145 MWE CONST: DUKE RM ANALYST:

L.

LAHIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR acceptance review was completed on 05/22/81.

SAR was docketed on 06/11/81.

ER DOCKETED:

06/11/81 06 /11/ 81 C ER SITE VISIT COMPLETE:

10/15/81 10/15/81C IHPUT TO DES TO PM:

06/25/82 ISSUE DES:

08/05/82 RESPONSE TO COMMENTS OH DES:

11/01/82 I

ISSUE FES:

01/05/83 1

CUkREHT ENV. STATUS:

ER acceptance review was completed on 05/22/81, and docketed on 06/11/81.

SAFETY / HEARING MILESTONES:

APPLICATION TEHDERED:

04/07/81 04/07/81C SAR DOCKETED:

06/11/81 06/11/81C SAR Q'S RECEIVED BY PM:

12/15/81 12/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/22/82 CURREHT HRG. STATUS:

IHPUT TO DRAFT SER TO PM:

07/02/82 Combined hearing anticipated to start 09/83.

ISSUE DRAFT SER:

INPUT TO SER:

01/09/83 ISSUE SER:

02/06/83 ACRS FULL COMMITTEE MEETING:

03/10/83 INPUTS TO SE SUPPLEMENT 1:

04/12/83 l

ISSUE SE SUPPLEMENT 1:

04/30/83 FEMA LETTER RECEIVED:

03/30/83 CURRENT ANTITRUST:

Received one petition to intervene.

HEARING STARTED:

09/28/83 ASLB IHITIAL DECISI0H:

03/00/84 ASLB FINAL DECISION:

TECH SPECS CLMPLETED:

COMMISSION DECISION:

09/00/84 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMEHDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/00/84 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

CP Amend. issued 12/23/80 indicating change in ownership.

CONSTRUCTION COMPLETION - APPL.

10/00/84 12/31/81 Staff is reassessing standard assumptions for projecting hearing schedules for plants with const. completion dates tavond

'82.

This re-assess. may result in a new schedule.

HR R L ICEHS IHG SYST EN PAGE NC: 2-6 CLINTON 1 8 2 0L CURR ENT STA TUS REP 0R T REPORT AS OF: 06/16/82 P L A H T CH A RA CT ER I ST I C St K EY PERS0NN E L:

DOCKET HO:

046180462 LIC. PM:

J. WILLIAMS ASLB CHAIR:

H.

CLARK APPLICANT:

ILLINDIS POWER LIC. BC:

J. MILLER MEMBER 1:

G.

FERGUSON LOCATION:

6 MI E OF CLINTON, ILL LIC. LA.

P.

ANDERSOH MEMBER 2:

D.

PARIS REGION:

3 AE:

58L COUNSEL:

R.

G00DARD CONST. INSP H. WESCOTT REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. IHSP:

H.

LIVERMORE DESIGH PWR: 2894 MWT/0950 MWE CONST: BALDWIH RM ANALYST:

M.

KING CURRENT SAF. STATUS:

ENVIRONMEHTAL MILESTGHES:

SCHED. DATE ACTUAL DATE FSAR was docketed 09/08/80.

SER was issued 02/17/82.

Supplement No. 1 is scheduled for issuance 06/30/82.

ER DOCKETED:

03/01/81 09/08/80C ER SITE VISIT COMPLETE:

IHPUT TO DES TO PM:

12/08/81 12/08/81C ISSUE DES:

12/18/8 1 12/28/81C RESPONSE TO COMMENTS ON DES:

07/?2/82 03/25/82C ISSUE FES:

OSe?0/82 05/20/82C CURRENT EHV. STATUS:

The draft environmental statement was completed December 1981.

The FES was completed May 1982.

SAFETY / HEARING MILES 10NES:

1 APPLICATION TENDERED:

12/01/79 12/01/79C l

SAR DOCKETED:

09/08/80 09/08/80C l

I SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

l CURRENT HRG. STATUS:

IHPUT TO DRAFT SER TO PM:

Two petitions for leave to intervene were filed.

The ISSUE DRAFT SER:

State of Illinois filed under to CFR 2.715(c).

IHPUT TO SER:

12/05/81 09/08/80C A prehearing was held on 04/14/81.

A second ISSUE SER:

01/05/82 02/17/82C prehearing was held 05/04/82.

ACRS LETTER RECEIVED:

02/12/82 03/09/82C INPUTS TO SE SUPPLEMENT 1:

06/11/82 ISSUE SE SUPPLEMENT 1:

06/30/82 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Operating license antitrust review completed HEARING STARTED:

11/00/82 March 18, 1982 (SECY-82-120).

ASLB IHITIAL DECISIDH:

09/00/83 ASLB FINAL DECISION:

10/00/83 TECH SPECS COMPLETED:

COMMISSION DECISI0H:

12/00/83 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENTi ISSUE FULL POWER LICENSE AMEHDI 01/00/83 FSAR Amendment #16, 05/82.

SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

IPC announced fuel load date of 1/84 by letter dated CONSTRUCTION COMPLETI0H - APPL.*

01/00/84 04/21/82 04/21/82.

HRR L ICEN 5 ING SYSTEM PAGE NO:

2-

-7 COMANCHE PEAK 1 8 2 0L CURRENT STA TUS R EP0RT REPORT AS OF: 06/16/82 P LAN T CHA RA CT ER IST I C S:

K EY P ERS0NN E L:

DCCKET NO:

044510446 LIC. PM:

S.

BURWELL ASLB CHAIR:

M. MILLER APPLICANT:

TEXAS UTILITIES GENERATING LIC. BC:

B. YOUNGBLOOD MEMBER 1:

R.

COLE LOCATION:

4 MI N OF GLEN ROSE, TEX LIC. LA.

M.

RUSHER 00K MEMBER 2:

K. MCCOLLOM REGION:

4 AE:

GtH COUNSEL:

M.

ROTHSCHILD CONST. INSP R.

TAYLOR REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B.

V0GLER RESID. INSP: D. KELLY DESIGN PWR: 3411 MWT/1150 MWE CONST: BRRT RM ANALYST:

M.

ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The SER was issued 07/14/81.

The staff deferred scheduling the Comanche Peak review by the ACRS until sufficient ER DOCKETED:

01/19/79 01/19/79C information uas provided to resolve a large nuitber of open ER SITE VISIT COMPLETE:

06/20/80 08/07/80C issues.

SSER #1 was issued 10/16/81 Application was INPUT TO DES TO PM:

08/15/80 04/27/81C revieued by the ACRS on 11/13/81 SSER #2 responding to ISSUE DES:

04/30/81 05/22/81C the ACRS was issued on 01/20/82.

SSER 13 is scheduled RESPONSE TO COMMENTS ON DES:

07/19/81 08/28/81C to be issued 07/16/82.

ISSUE FES:

09/18/81 09/24/81C j

l l

CURRENT ENV. STATUS:

The DES was issued on 05/22/81.

The EPA Federal Register Notice nas printed on 05/29/81 and the comment period SAFETY / HEARING MILESTONES:

ended 07/13/81.

The FES was issued on 09/24/81.

APPLICATION TENDERED:

03/01/78 03/01/78C SAR DOCKETED:

05/12/78 05/12/78C SAR Q'S RECEIVED BY PM:

12/30/78 02/22/79C l

SAR APPL. RESPONSE TO Q'S RECEIVED: 05/08/79 01/31/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER'TO PM:

04/13/79 0 3/11/81C The first hearing session was held 12/02/81 in Fort Worth.

ISSUE DRAFT SER:

03/31/81 03/31/81C Issues heard were financial qualifications and the INPUT TO SER:

05/22/81 07/08/81C operating QA progran.

The second hearing session on ISSUE SER:

07/14/81 07/14/81C QA/QC during construction was held 06/07-11/82.

A third hearing session is scheduled to be held 07/26-30/82.

The ACRS LETTER RECEIVED:

11/17/81 11/17/81C fourth hearing session on the remaining contention, INPUTS TO SE SUPPLEMENT 3:

u1/00/83 i

l emergency plans, is unscheduled.

ISSUE SE SUPPLEMENT 3:

07/16/82 FEMA LETTER RECEIVED:

03/01/83 CURRENT ANTIiRUST:

ALJ appointed on 02/23/82 to replace ASLB.

Prehrq HEARING STARTED:

12/02/81 12/02/31C conference held 04/13/82 to determine status of partj es.

ASLB INITIAL DECISION:

09/00/82 Briefs filed 05/04/82 request immediate imposition of ASLB FINAL DECISION:

10/00/82 settlement license conditions.

A Memorandum and Order TECH SPECS COMPLETED:

05/00/83 approving settlement agreements & proposed license COMMISSION DECISION:

05/00/83 conditions & dismissing proceedings was issued 05/06/82.

ISSUE LIC. WITH POWER RESTRICTION: N/S LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

06/00/83 32 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.

06/00/83 10/29/81

NRR LICENSING SYSTEM PAGE NO: 2-8 DIABLO-CANYON 1 3 2 0L CURRENT STATUS REPORT REPORT AS OF: 06/16/82 PLANT CHARACTERIST I C S:

KEY PERS0NN E L:

DOCKET NO:

027580323 LIC. PM:

B.

BUCKLEY ASLB CHAIR:

J. WCLF APPLICANT:

PACIFIC GAS E ELECTRIC LIC. BC:

F. MIRACLIA MEMBER 1:

J.

KLINE LOCATION:

12 MI WSW OF SAN LUIS OBISPD LIC. LA.4 J.

LEE MEMBER 2:

G.

BRIGHT REGION:

5 AE:

PG&E COUNSEL:

B. JONES CONST. INSP: D. KIRSCH REAC. TYPE: PWR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP J. CARLSON DESIGN PWR: 3338 MWT/1084 MWE CONST: POSE RM ANALYST:

B. Si MARY ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SSER 15 (Equip. Qualification) was issued on 10-02-81.

SSER 16 (Emergency Prep.) is estimated for 07/82 (indicated ER DOCKETED:

11/09/71 11/09/71C as SSER9 on schedule). ASLB decision on a full power ER SITE VISIT COMPLETE:

license is projected for Jure 1982.

Low power license was INPUT TO DES TO PM:

10/09/72 10/09/72C issued on 09-22-81 and suspended on November 19, 1981 ISSUE DES:

12/12/72 12/12/72C RESPONSE TO COMMENTS ON DES:

04/27/73 04/27/73C ISSUE FES:

09/15/75 05/28/76C CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

07/10/73 07/10/73C SAR DOCKETED:

10/02/73 10/02/73C SAR Q'S RECEIVED BY PM:

01/04/74 01/ 0 4/ 74 C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/01/74 11/01/74C INPUT TO DRAFT SER TO PM:

01/24/75 01/24/75C CURRENT NRG. STATUS:

LP hearings were held 05-19-81 through 05-22-81.

A ISSUE DRAFT SER:

favorable PID on low power operation was issued July INPUT TO SER:

01/24/75 01/24/75C 17, 1981 A full power hearing was completed on January ISSUE SER:

10/04/74 10/16/74C 26, 1982.

ACRS LETTER RECEIVED:

05/00/78 07/18/78C INPUTS TO SE SUPPLEMENT 9:

06/21/82 ISSUE SE SUPPLEMENT 9:

07/00/82 FEMA LETTER RECEIVED:

06/22/82 CURRENT ANTITRUST HEARING STARTED:

10/29/75 12/07/76C Not required ASLB INITIAL DECISION:

07/00/82 ASLB FINAL DECISIDH:

08/00/82 TECH SPECS COMPLETED:

06/15/80 09/15/81C COMMISSION DECISION:

ISSUE LIC. W11H POWER RESTRICTION: 09/22/81 09/22/81C ISSUE FULL POWER LICENSE AMEND:

N/S LATEST AMENDMENT:

l SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTIDH COMPLETION - APPL.:

Est. of dates from end of LP hrg to lic. complete dependent upon dev./ approval of State and local Emergency Plans. Ongoing Design Verif. Program likely to identify olant mods.

Const. comoletion deoendent on mods.

NRR LICEN$ING SYSTEM PAGE NO: 2-9 ENRICO FERMI 2 0L CURRENT STATUS REPQRT REPORT AS OF: 06/16/82 PLANT CHARACTERISTICSt KEY PERS0NNELi DOCKET NO:

05000341 LIC. PM:

L. KINTHER ASLB CHAIR:

G. MILLHOLLIN APPLICANT:

DETROIT EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1:

P. MORRIS LOCATION:

LAGUNA BEACH, MICH LIC. LA.:

M.

RUSHBROOK MEMBER 22 D. SCHINK REGION:

3 AE

$3L COUNSEL:

C. WOODHEAD CONST. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUST:

A.

HDDGDON RESID. INSP: B. LITTLE DESIGN PWR 3292 MWT/1093 MWE CONST DANIEL RM ANALYST D. SCHWARZ CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-77 and a final SER was issued on 07-10-81 (See second page for milestone ER DOCKETED:

04/04/75 04/04/75C i

summary.) SSER No. I was issued 09-25-81.

SSER No. 2 was ER SITE VISIT COMPLETE:

09/27/78 10/31/78C i

issued 01-29-82 with 7 prelicensing issues outstanding.

INPUT TO DES TO PM:

07/31/81 04/24/81C l

SSER No. 3 is scheduled for issuance on 09-01-82.

ISSUE DES:

05/01/81 04/30/81C l

RESPONSE TO COMMENTS ON DES:

07/31/81 06/29/81C ISSUE FES:

08/31/81 09/04/81C CURRENT ENV. STATUS:

Addendum No. 1 to the FES was issued 03-03-82.

SAFETY / HEAF.ING MILESTONES:

APPLICATION TENDERED:

10/22/74 10/22/74C SAR DOCKETED:

04/05/75 04/05/75C SAR Q'S RECEIVED BY PM:

06/13/75 08/11/75C SAR APPL. RESPONSE TD Q'S RECEIVED: 08/29/75 01/12/76C CURRENT H'RG. STATUS:

INPUT TO DRAFT SER TO PM:

10/24/75 03/08/76C A' hearing on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:

04-02-82.

The two contentions were (1) QA/QC during INPUT TO SER:

03/05/76 05/20/77C construction and (2) adequacy of evacuation plans for ISSUE SER:

08/01/77 09/29/77C the local community.

ACRS LETTER RECEIVED:

08/20/81 08/11/81C INPUTS TO SE SUPPLEMENT 3:

08/01/82 ISSUE SE SUPPLEMENT 3:

09/01/82 FEMA LETTER RECEIVED:

08/01/82 CURRENT ANTITRUST An ASLB decision on antitrust matters was issued on HEARING STARTED:

12/02/81 03/31/82C 04-25-78.

ASLB INITIAL DECISION:

08/31/82 ASLB FINAL DECISION:

09/00/82 TECH SPECS COMPLETED:

04/01/83 COMMISSION DECISION:

05/01/83 ISSUE LIC. WITH POWER RESTRICTION: N/A LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/01/83 The latest final Safety Analysis Report Amendment is number 41.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

The SSER and FES were empl. on an accel. sched. to allow CONSTRUCTION COMPLETION - APPL.:

06/01/83 05/29/82 more time for public hearings. Commission readiness l

decision date slipped from 09-30-82 to 05-01-83 to be l

consistent with the acolicant's current constr comol date.

7

NRR LICENSING SVSTEM PAGE NO: 2-10 FERMI 2 (FSAR RESUS)

OL CURRENT STATUS REPORT REPORT AS OF* 06/16/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

00007341 LIC. PM:

L. KINTHER ASLB CHAIR:

G. MILLHOLLIN APPLICANT:

DETROIT EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1:

P. MORRIS LOCATION:

LAGUNA BEACH, MICH LIC. LA,t M. RUSHBROOK MEMBER 2:

D. SCHINK REGICH:

3 AE:

SIL COUNSEL:

C. WOODHEAD CONST. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUST:

A.

H0DGDON RESID. INSP B. LITTLE DESIGN PWR 3292 MWT/1093 MWE CONST: DANIEL RM ANALYST:

D. SCHWARZ CURRENT SAF. STATUS:

SCHED. DATE ACTUAL DATE All information on this page reflects the FSAR resubmittal. The SAR resubmittal was docketed on 06-01-78 and the safety review was completed. A final SER was issued on 07-10-81.

Summary of later milestones is on previous page.

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/22/74 10/22/74C SAR DOCKETED:

06/01/78 06/01/78C SAR Q'S RECEIVED BY PM:

07/01/78 08/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/78 10/02/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

09/08/78 03/27/81C ISSUE DRAFT SER:

INPUT TO SER:

06/10/81 06/23/81C ISSUE SER:

06/30/81 07/10/81C i

CURRENT ANTITRUST:

s LATEST AMENDMENT:

NEW SLIPS / NOTES:

All information on this page reflects the FSAR resubmittal. The schedule for input to the SER slipped due to slippage in the fuel load date because of TMI Dau$e.

i I,

EM PAGE NO: 3-11 NRR LECENSING SYS GRAND GULF 1 8 2 0L CURREN T STATU$

RCP ORT REPORT AS OF: 06/16/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

041680417 LIC. PM:

D.

HOUSTON ASLB CHAIR: N/A APPLICANT:

MISSISSIPPI POWER 8 LIGHT COMPANY LIC. BC:

A.

SCHWENCER MEMBER 1:

N/A LOCATION:

25 MI S OF VICKSBURG, MISS LIC.

LA..

E. HYLTON MEMBER 2:

N/A REGION:

2 AE BECH COUNSEL:

M. WAGNER CONST. INSP R. VANDORN REAC. TYPE: BWR NSSS: GE ANTITRUST:

B.

V0GLER RESID. INSP:

A. WAGNER DESIGN PWR: 3833 MWT/1250 MWE CONST: BECH RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981.

An initial ACRS meeting was held Oct. 15, 1981.

SSERs were issued in ER DOCKETED:

06/05/78 06/30/78C December 1981 and in June 1982.

Another SSER is ER SITE VISIT COMPLETE:

12/14/79C scheduled to be issued in July 1982.

A second ACRS INPUT TO DES TO PM:

04/30/81 04/30/81C l

meeting is scheduled for August 1982 on Hydrogen and ISSUE DES:

05/31/81 05/31/81C HCU floor loads.

RESPONSE TO COMMENTS ON DES:

08/15/81 08/15/81C ISSUE FES:

09/15/81 10/09/81C I

CURRENT ENV. STATUS:

DES was issued in May 1981.

FES was issued October 9, 1981.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/28/78 04/28/78C SAR DOCKETED:

06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:

04/24/79C SAR APPL. RESPONSE TO Q'S RECEIVEDr 07/01/80 09/30/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER'TO PM:

N/S l

No hearing is scheduled.

ISSUE DRAFT SER:

09/18/81C INPUT TO SER:

04/01/81 08/14/81C ISSUE SER:

06/00/81 09/10/81C

}

ACRS LETTER RECEIVED:

08/16/82 INPUTS TO SE SUPPLEMENT 3 08/15/81 07/01/82C ISSUE SE SUPPLEMENT 3 07/09/82 FEMA LETTER RECEIVED:

06/00/82 CURRENT ANTITRUST

  • OL review is in progress. No significant changes have HEARING STARTED:

N/A occurred since the CP.

ASLB INITIAL DECISIDH:

N/A ASLB FINAL DECISION:

TECH SPECS COMPLETED:

09/01/81 06/16/82C COMMISSION DECISION:

08/00/82 l

ISSUE LIC. WITH POWER RESTRICTION: 04/23/82 06/16/82C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

08/00/82 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

An operating Ilconse for Unit 1 authorizing fuel load CONSTRUCTION COMPLETION - APPL.4 06/16/82C and up to 5% power operation was issued 06/16/82.

Y

~

NRR LICEN5ING SYSTEM PAGE NO: 2-12 HARRIS 1 42 0L CURREHT STATUS REPORT REPORT AS OF: 06/16/82 PLAHT CHARACTER. I S T I C S:

KEY PERS0NN E L:

DOCKET NO:

0400-0401 LIC. PM:

E.

LICITRA ASLB CHAIR:

J. KELLEY APPLICANT:

CAROLINA POWER 4 LIGHT LIC. BC:

F. MIRAGLIA MEMBER 1:

G.

BRIGHT LOCATION:

20 MI SW OF RALEIGH, NC LIC. LA.

J.

LEE MEMBER 2:

J.

CARPENTER REGIDH:

2 AE:

EBASCO COUNSEL:

C.

BARTH CONST. INSP:

REAC. TYPE: PWR N5SS: WEST ANTITRUST:

J.

RUTBERG RESID. INSP: G. MAXWELL DESIGH PWR: 2775 MWT/0915 MWE CONST: DANIEL RM ANALYST:

M.

ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was docketed on 12/22/81 Review has started.

Questions from most review branches have been sent to

'CKETED:

12/22/31 12/22/81C TE VISIT COMPLETE:

04/08/82 04/08/82C the applicant.

TO DES TO PM:

08/15/82 1

i DES:

10/01/82 ks. JNSE TO COMMENTS OH DES:

01/08/83 ISSUE FES:

03/31/83 CURRENT ENV. STATUS:

ER was docketed on 12/22/81. Review has started. The site visit was complete on 04/08/82 and questions were sent to SAFETY / HEARING MILESTONES:

applicant on 04/28/82.

APPLICATION TENDERED:

06/26/80 06/26/80C SAR DOCKETED:

12/22/81 12/22/81C SAR Q'S RECEIVED BY PM:

07/01/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 08/02/82 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/15/82 Notice for Opportunity for Hearing was published in the ISSUE DRAFT SER:

12/01/82 Federal Register on January 27, 1982.

Several petitions IHPUT TO SER:

06/01/83 were filed. Prehearinq conference on petitions scheduled ISSUE SER:

07/08/83 for July 13-14, 1982.

ACRS FULL COMMITTEE MEETING:

08/11/83 INPUTS TO SE SUPPLEMENT 1:

12/01/83 ISSUE SE SUPPLEMENT 1:

01/09/84 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

06/01/84 ASLB INITIAL DECISIGH:

11/01/84 ASLB FINAL DECISIDH:

11/00/84 TECH SPECS COMPLETED:

11/01/84 COMMISSION DECISIDH:

11/00/84 ISSUE LIC. WITH POWER RESTRICTION:

12/01/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/01/84 No. 2 SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

CONSTRUCTION COMPLETI0H - APPL.

12/01/84 04/14/82 l

l

NRR L ICENSING SYSTEM PAGE NO: 2-13 LASALLE 1 12 0L CURRENT

$TA TUS REPQRT REPCRT AS OF: 06/16/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET h0:

037380374 LIC, PM:

A.

BOURNIA ASLB CHAIR:

M. MILLER APPLICANT:

COMMONWEALTH EDISON LIC. BC:

A.

SCHWENCER MEMBER 1:

F. SHCN LUCATION:

11 MI SE OF OTTAWA. ILL LIC. LA.:

E. HYLTON MEMBER 2:

D. PARIS REGION:

3 AE S8L COUNSEL:

C. WOODHEAD CONST. INSP:

H. WESCOTT REAC. TYPE: EWR NSSS: GE ANTITRUST:

B.

V0GLER RESID. INSP: W.

GULDEMOND DESIGN PWR*

3293 MWT/1078 MWE CONST: CWE RM ANALYST:

D. SCHWARZ ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

$5ER-1 was issued in June 1981 SSER-2 was issued in February 1982.

SSER-3 was issued on April 16, 1982.

SSER-4 ER DOCKETED:

01/17/77 05/12/77C is expected to be issued on June 30, 1982.

A low power ER SITE VISIT COMPLETE:

01/12/77 06/15/77C license to permit fuel load and low power testing was INPUT TO DES TO PM:

02/17/78 02/57/78C issued on April 17, 1982.

ISSUE DES:

05/22/78 03/29/78C RESPONSE TO COMMENTS ON DES:

07/14/78 07/14/78C ISSUE FES:

09/22/78 11/03/78C CURRENT ENV. STATUS:

Environmental Protectior. Plan has been issued.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/01/76 09/01/76C SAR DOCKETED:

04/08/77 05/12/77C SAR Q'S RECEIVED BY PM:

07/08/77 07/27/77C SAR APPL. RECPONSE TO Q'S RECEIVED: 11/20/77 08/18/78C INPUT TO DRAFT SER TO PM:

10/06/78 11/08/78C CURRENT HRG. STATUS:

ISSUE DRAFT SER:

No hearing.

INPUT TO SER:

12/29/73 02/27/81C ISSUE SER:

09/05/86 03/05/31C ACRS LETTER RECEIVED:

04/09/81 04/16/81C INPUTS 10 SE SUPPLEMENT 4:

06/29/82

\\

ISSUE SE SUPPLEMENT 42 06/30/82 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

HEARING STARTED:

N/A Complete.

ASLB INITIAL DECISION:

N/A ASLB FINAL DECISION:

N/A TECH SPECS CUMPLETED:

04/12/82 04/12/82C CCMMISSION DECISION:

C6/00/82 ISSUE LIC. WIIH POWER RESTRI*fl0N: 04/17/82 04/'7/82C ISSUE FULL POWER LICENSE AMEND:

Ot/00/82 LATEST AMENDMENT:

NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION _ APPL.:

04/17/82C 04/17/82 Plant criticality was achieved on June 21, 1982.

'l s

s g y r

NRR LICEN5IsNG SYSTEM PAGE N0a-14 LIMERICK 1 &2 0L C U R'R E M T S T, f Tfd 'S REPQRT REPORV AS OF 06/15/82 PLANT CHARACTERI5 TIC 5:

KEY PERS0NNEL 1

DOCKET NO:

035280353

>LIC. PM:

H. ABELSON ASLE CHAIR L. BRENNER

'i APPLICANT:

PHILADELPHIA ELECTRIC LIC BC:

A.

SCHWENCER MEMBER 1:

R. COLE LOCATION:

35 NI NW OF PHILADELPHIA, PA LIC. LA.:

E. HYLTON MEMBER 2 P. MORRIS REGION:

1 AE:

BECH COUNSEL:

S. LEWIS CONST. INSP:

[

REAC. TYPEa EWR NSSS: GE ANTITRUST:

3. V0GLER RESID. INSP:

5 DESIGN PWR: 3440 MWT/1065 MWE CONST: BECH RM ANALYST:

M. ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Appticant submitted ProbablIlstic Risk Assessment with FSAR on March 17, 1031.

SAR was docketed on 07/27/81.

ER DOCKETED:

07/27/81 07/27/81C PRA under review by Brookhaven National Laboratory; ER SITE VISIT COMPLETE:

08/20/82 NUREG/CR on PRA scheduled for issuance 11/30/82.

INPUT TO DES TO PM:

03/25/83 t

ISSUE DES:

05/06/83

[

RESPONSE TO COMMENTS ON DES:

09/06/83 t

ISSUE FES:

10/31/83

[

t l

CURRENT ENV. STATUS:

E2 was tendered with the FSAR on March 17, 1981 and t

was docketed on 07/27/81.

SAFETY / HEARING MILESTONES:

I APPLICATION TENDERED:

01/00/81 03/17/81C l

SAR DOCKETED:

07/27/81 07/27/81C SAR Q'S RECEIVED BY PM:

07/08/82 SAR APPL. RESPONSE TO Q'S RECEIVED: 10/07/82 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/07/83 i

Notice of Opportunity of Hearing was published in the ISSUE DRAFT SER:

02/04/83 L

Federal Register on August 21, 1981 Pre-hearing INPUT TO SER:

07/01/83 conference held sanuary 6-8, 1982. A special pre-hearing ISSUE SER:

08/08/83 conference order was issued on June 1,

1982.

ACRS FUlf COMMITTEE MEETING:

09/08/83 t

INPUTS TO SE SUPPLEMENT 1 10/07/83 l

ISSUE SE SUPPLEMENT 18 10/30/83 FEMA LETTER RECEIVED:

10/07/83 CURRENT ANTITRUST:

e Status to be deternined.

HEARING STARTED:

04/00/54 l

ASLB INITIAL DECISION:

09/00/84 ASLB FINAL DECISION:

10/00r84 TECH SPECS COMPLETED:

N/S COMMISSION DECISION:

10/00/84 ISSUE LIC. WITH POWER RESTRICTION:

10/00/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S e

29, March 31, 1982 (ER OL) 34, June 3, 1982 (FSAR)

SCHED. DATE RECEIPT DATE l

NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

10/00/84 04/27/82 i

t y

-.y s-_

n

,y-_.

.c., - - -

N R R-L8CEN5ING SYSVEM PAGE NO: 2-15 dCGUIRE 2 0L CURRENT 5TATUS REPQRT REPORT A5 0F: 06/16/82 PLANT C H A R A C T E k I S T I C 5:

KEY PERS0NNEL DOCKET NO:

05000370 LIC. PM:

R. BIRKEL ASLB CHAIR:

R. LAZO APPLICANT:

DUKE POWER LIC. BC:

5. ADENSAM MEMBER 1:

X. HAND LOCATION:

17 MI N OF CHARLOTTE, NC LIC. LA.:

M. DUNCAN MEMPER 2:

E. LUEBKE REGION:

2 AE DUKE COUNSEL:

J. CUTCHIN CONST. INSP: M. HUNT REAC. TYPE: PWR NSSS: WEST ANTITRUSTt B. V0GLER RESID. INSP P. BEMIS DESIGN PWR: 3411 MWT/1880 MWE CONST DUK2 RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Input for SSER 6 (SSER for unit 2) is due to DL on 12/01/82, with issuance of the supplement sch 1oled ER DOCKETED:

05/31/74 05/31/74C ER SITE VISIT COMPLETE:

01/30/75 01/30/75C f or 01/31/83.

INPUT TO DES TO PM:

08/29/75 08/29/75C ISSUE DES:

11/07/75 10/29/75C RESPONSE TO COMMENTS ON DES:

ISSUE FES:

05/07/76 04/20/76C CURRENT ENV. STATUS:

Complete.

SAFETY / HEARING T1ILESTONES:

APPLICATION TENDERED:

04/05/74 04/05/74C SAR DOCKETED:

04/29/75 05/05/75C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE,70 Q'S RECEIVEDT INPUT TO DRAFT SER TO PM:

CURRENT HRG. STATUS:

ISSUE DRAFT SER:

Complete.

INPUT TO SER:

06/01/77 01/16/7&C ISSUE SER:

02/21/78 03/01/78C ACRS LETTER RECE!vEDs 04/14/78 04/14/78C INPUTS TO SE SUPPLEMENT 6 12/01/82 ISSUE SE SUPPLEMENT 63 01/31/83 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

03/15/77 03/23/77C Ccmplete.

ASLB INITIAL DECISION:

06/00/81 06/08/81C ASLB FINAL DECISION:

TEC:t SPECS COMPLETED:

COMI1ISSION DECISION:

03/01/83 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

04/01/83 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CCHSTRUCTION COMPLETION - APPL.:

04/01/83 05/20/82 l

NRR LICENS1NG SYST EM PAGE NC: 2-16 MIDLAND 1 12 0L CURRENT STATUS REPQRY REPORT AS OF: 06/16/82 PLANT C ij A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

033080329 LIC. PM:

R. HERNAN ASLB CHAIR:

C. BECHHOEFER APPLICANT:

CONSUMERS POWER LIC. BC:

E. ADENSAM MEMBER 1:

F.

COWAN LOCATION:

SW BOUNDARY OF MIDLAND. MICH.

LIC. LA.

M.

DUNCAN MEMBER 2:

J. HARBOUR REGION:

3 AE:

PECH COUNSEL:

W. PATON CONST. INSP:

R.

COOK REAC. TYPE: PWR NSSS: 33W ANIITRUST:

B. V0GLER RESID. 1 ASP:

R.

CONK DESIGN PWR: 2452 MWT/0818 MWE CONST: BECH RM ANALYST:

M.

ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DAT2 Utilization of National Laboratories or other agencies to completu some review areas is currently ER DOCKETED:

04/01/78 04/14/78C in progress. CP extension was issued 12/28/81.

ACRS ER SITE VISIT COMP'ETE:

09/08/78 0 9/08/ 78C Subcommittee meetings were held on 04/29/82, 05/20-21/82 INPUT TO DES TO PM:

N/5 and 06/02/82. Full Committee Meeting was held 06/3-5/82.

ISSUE DES:

02/05/82 02/05/82C RESPONSE TO COMMENTS ON DES:

07/08/82 ISSUE FES:

07/20/82 CURRENT ENV. STATUS:

The DES was issued 02/05/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

08/31/77 08/31/77C SAR DOCKETED:

09/30/77 11/18/ 77C j

SAR Q'S RECEIVED BY PM:

03/20/78 10/02/78C l

SAR APPL. RESPONSE TO Q'S RECEIVED: 12/08/78 12/08/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/01/78 12/01/78C Three prehearings ending 04/27-28/81 were held for a ISSUE DRAFT SER:

l separate hearing on soils settlement. Hearing on soils INPUT TO SER:

04/23/82 04/23/82C settlement began July 7, 1981 and is continuing.

ISSUE SER:

05/11/82 0 5/11/82 C ACRS LETTER RECEIVED:

06/15/82 06/08/82C I

INPUTS TO SE SUPPLEMEH1 1:

06/10/82 06/10/82C ISSUE SE SUPPLEMENT 1:

07/01/82 FEMA LETTER RECEIVED:

07/30/82 CURRENT ANTITRUST:

Proceeding completed. License was amended 10/20/80.

HEARING S(ARTED:

11/16/82 ASLB INITIAL DECISION:

06/30/83 ASLB FINAL DECISION:

07/00/83 TECH SPECS CCMPLETED:

06/25/82 COMMISSION DECISION:

07/00/83 ISSUE LIC. WITH PCWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

103 SCHED. DAIE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL..

07/31/83 12/31/81 I

N2R L ICEN$ING SYSTEM PAGE NO: 2-17 PALD VERDE 1,2,3 0L CURRENT STA TUS REPQRT REPORT AS OF: 06/16/82 PLANT C H A R A C T E R I $ T I C S:

AEY P E R S 0 N N E L:

DOCKET NO:

0528-0530 LIC. PM:

E. LICITRA ASLB CHAIR:

R. LA20 APPLICANT:

ARIZONA PUBLIC SERVICE LIC. EC:

F. MIRAGLIA MEMBER 1:

R. COLE LOCATION:

36 MI W OF PHOENIX, AZ LIC. LA.

J. LEE MEMBER 2 D. CALLIHAN REGIJH:

5 AE:

BECH COUNSEL:

L. DEWEY CONST. INSP: L. VERUEGGEN REAC. TYPE: PWR HSSS: COMB ANT 11 RUST:

B. V0GLER RESID. INSP:

G.

FIORELLI DESIGN PWR: 3817 MWT/1304 MWE CONST: BECH RM ANALYST:

D. SCHWARZ CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The safety OL review i s in progress.

Several " Independent Design Review" meetings have been completed. The SER ER DOCKETED:

07/01/30 05/20/80C was issued on November 11, 1981 The SER supplement ER SITE VISIT COMPLETE:

01/30/81 01/30/81C Hos. I and 2 were issued on February 5, 1982 and May 17, INPUT TO DES TO PM:

10/05/S1 10/05/81C 1982, respectively. SSER-3 is scheduled to be issued on ISSUE DES:

10/26/81 10/26/8tC July 30, 1982.

RESPONSE TO COMMENTS ON DES:

02/25/82 02/25/82C ISSUE FES:

03/11/82 03/11/82C CURRENT ENV. STATUS:

The ER (DL) review is complete. A site visit was completed on January 30, 1931.

The DES was issued on SAFETY / HEARING MILESTONES:

October 26, 1981 and the FES was issued on March 11, 1982.

APPLICATION TENDERED:

10/05/79 10/05/79C SAR DOCKETED:

06/20/80 06/20/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT LER TO PM:

Five contentions were initially admitted. Two contentions ISSUE DRAFT SER:

havt been subsequently dropped by the intervenor and two INPUT TO SER:

10/30/81 10/30/81C others were summarily disposed of by the Board.

The ISSUE SER:

11/11/81 11/11/81C remaining contention deals wi+h water availability.

The hearing started April 27-30, 1982, resumed on May ACRS LETTER RECEIVED:

12/18/81 12/18/81C 25-28, 1982 and will again resume on June 22, 1982.

INPUTS TO SE SUPPLEMENT 3:

07/09/82 ISSUE SE SUPPLEMENT 3:

07/30/82 FEf1A LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Antitrust OL review is in progress.

HEARING STARTED:

04/27/82 04/27/82C ASLB INITIAL DECISION:

10/30/82 ASLB FINAL DECISION:

11/00/82 TECH SPECS COMPLETED:

11/0f/82 COMMISSION DECISION:

11/00/82 ISSUE LIC. WITH PCWER RESTRICTION: N/S LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

11/01/82 FSAR Amendment No 8 ER Supplemen+ No. 4 SCHED. DATE RECEIPT DATE NEW SLIPS /NOTESe Caseload Forecast Panel estimates for construction CONSTRUCTION COMPLETION - APPL.:

11/01/82 05/12/82 completion on Units 1,

2, and 3 are being re evaluated as a result of a March 1982 site visit.

NRR L ICEN $ING SYSTEM PAGE NO: 2-18 PERRY 1 & 7 0L CURR EN T ST A TUS REPORT REPORT AS OF: 06/16/82 PL AN T CHARA CTER IST I C 5:

K EY P E R S 0 N N E L:

DOCKET NO:

044080441 LIC. PM:

J. STEFAND ASLB CHAIR:

P.

BLOCH APPLICANT:

CLEVELAND ELECTRIC ILLUMINATING LIC. BC:

A.

SCHWENCER MEMBER 1:

J. KLINE LOCATILA:

7 MI NE OF PAINESVILLE. OHIO LIC. LA.

E. HYLTON MEMBER 2:

F. SHON REGION:

3 AE:

GIL COUNSEL:

J.

THESSIN CONST. INSP:

RFAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: M.

GILDNER DESIGN PWR:

3758 Mur/120S MWE CONST: KAISER RM ANALYST:

D.

SCHWARZ 1

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE l

CURRENT SAF. STATUS:

The Safety Evaluation Report was issued in May 1982.

i An ACRS subcommittee meeting is scheduled for June 1982.

ER DOCKETED:

C6/26/81 06/19/81C ER SITE VISIT COMPLETE:

l INPUT TO DES TO PM:

41/01/82 01/01/82C ISSUE CES:

02/26/82 02/26/82C RESPONSE TO CCMMENTS ON DES:

06/30/82 ISSUE FES:

07/05/82 CURRENT ENV. STATU5:

Environmental acceptance review was completed on June 9,

1981.

The ER was docketed June 19. 1981 FES SAFETY / HEARING MILESTONES:

issuance is estimated for July S.

1982.

APPLICATION TENDERED:

06/26/80 06/26/80C SAR DOCKETED:

01/09/81 01/30/81C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO 3 RAFT SER TO PM:

02/24/82 02/24/82C A prchearing conference was held June 2-3, 1981 in ISSUE CRAtT SER:

02/26/82 02/26/82C Painesville, Ohio.

INPUT TO SLR:

04/10/82 05/10/82C ISSUE SER:

05/10/82 05/24/82C ACRS FULL CO.*MITTEE MEETING:

07/08/82 INPUTS TO SE SUPPLEMENT 1:

07/16/82 ISSUE SE SUPPLEMENT 1:

07/29/82 FEMA LETTER RECEIVED:

09/01/82 CURDENT ANTITRUST:

CP antitrust review has been completed. OL antitrust HEARING STARTED:

11/00/82 status is under review.

ASLB INITIAL DECISION:

04/00/83 ASLB FINAL DECISION:

0S/00/83 TECH SPECS COMPLETED:

N/S COMMISSION DECISION:

10/00/83 ISSUE LIC. WITH POWEP RESTRICTI0tu 10/00/83 ISSUE FULL POWER LICENSE AMEND:

N/S LATEST AMENDMENT:

Number 6.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APFL.:

11/00/83 02/08/82

HRR LICENSING SVSYEM PAGE NO: 8-19 RIVER BEND 1 8 2 0L CURRENT STATUS RFPQRT REPORT AS OF: 06/16/82 PLANT CHARACTERIST I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

045880459 LIC. PM:

. UNASSIGNED ASLB CHAIR B. COTTER APPLICANT:

GULF STATES UTILITIES LIC. BC:

A. SCHWENCER MEMBER 1:

F.

REMICK LOCATION:

24 MI NNW OF BATON ROUGE, LA LIC. LA.:

E. HYLTON MEMBER 2:

R. COLE REGION:

4 AE:

SIW COU!4S EL :

L. DEWEY CONST. INSP

. UNASSIGNED REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: A.

BEACH DESIGN PWR: 3015 MWT/0934 MWE CONST: 58W RM ANALYST:

M. KING 1

l CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE l

Applicant tendered FSAR for docketing on 04/24/81 FSAR was docketed on 08/25/81.

ER DOCKETED:

08/25/88 08/25/81C ER SITE VISIT COMPLETE:

01/22/82 01/22/82C INPUT TO DES TO PM:

06/01/82 ISSUE DES:

07/05/82 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

12/05/82 CURRENT ENV. STATUS:

Applicant tendered ER for docketing on 04/24/81.

ER was docketed on 08/25/81 SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

04/24/81 04/24/81C SAR DOCKETED:

08/25/81 08/25/81C SAR Q'S RECEIVED BY PM:

12/07/81 12/16/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/14/82 CURRENT HRG. STATUS:

INPUT TO DRAFT SER-TO PM:

03/04/82 Notice of Cpportunity for Hearing was published in the ISSUE DRAFT SER:

N/S Federal Register on 09/04/81.

INPUT TO SER:

09/04/82 ISSUE SER:

10/04/82 ACRS FULL COMMITTEE MEETING:

11/05/82 INPUTS TO SE SUPPLEMENT 1:

11/08/82 ISSUE SE SUPPLEMENT 1 11/29/82 FEMA LETTER RECEIVED:

11/30/82 CURRENT ANTITRUST Status to be determined.

HEARING STARTED:

04/00/83 ASLB INITIAL DECISION:

09/00/83 ASLB FINAL DECISION:

10/00/83 TECH SPECS COMPLETED:

COMMISSION DECISION:

03/00/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

04/00/85 Number 3.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

NRR/0L is assessing advisability of lowering the priority CONSTRUCTION COMPLETION - APPL.:

04/00/85 04/15/82 of the review on this case due to the recent 18 month slip in construction schedule.

1

NRR L ICEN5ING SYST EM PAGE NO: 2-20 SAs ONOFRE 2 3 3 L IC CURRENT STATUS REPQRT REPORT AS OF: 06/16/82 P1 ANT CHARACTERI5T I C S:

KEY P E R S 0 N N E L:

LdCKET NO:

036110362 LIC. PM:

H. ROOD ASLB CHAIR:

J.

KELLEY AF'LICANT:

SOUTHERN CALIFORNIA EDISON LIC. BC:

F. MIRAGLIA MEMBER 1:

C.

HAND LO*ATION:

5 MI 5 0F SAN CLEMENTE, CA LIC.

LA.*

J.

LEE MEMBER 2:

E.

JDHNSON REGION:

5 AE:

BECH COUNSEL:

L.

CHANDLER CCNST. INSP:

D. KIRSCH REAC. TYPE' PWR NSSS: COMB ANTITRUST:

B.

V0GLER RESID. INSP:

A.

CHAFFEE DESIGN PWR: 3410 MWT/1100 MWE CONST: BECH RM ANALYST:

M. ANDERSON ENVIRONMENTAL MILESTCHES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SER on coological and seismological matters was issued on 12/31/80. ACRS subcommittee meeting was held 01/30/81, and ER DOCKETED:

03/01/77 03/23/77C full committee meetings were held 02/5/81 and 03/12/81 ER SITE VISIT COMPLETE:

05/20/77 05/20/77C SER (Hon-TMI matters), was issued on 02/06/81.

SER INPUT TO DES TO PM:

10/01/77 12/01/80C supplement on TM1 issues was issued on 02/25/81. SER ISSUE DES:

01/27/78 01/20/81C supplement No. 2, 3, 4,

and 5 addressing open items were RESPONSE TO COMMENTS ON DES:

04/06/81 04/06/81C issued 05/08/81, 09/16/81, 01/22/82, and 02/16/82.

A ISSUE FES:

04/00/81 04/29/81C partial initial decision was rendered on 01/11/82 and an ASLB initial decision Aas issued on 05/14/82. A low power OL was issued on 02/16/82.

CURRENT ENV. STATUS:

DES addressing class 9 accidents was issued 01-20-81, FES was issued 04-29-81.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/29/76 11/29/76C SAR DOCKETED:

03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:

08/15/77 09/29/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/18/77 12/08/77C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

02/10/78 03/11/78C Motions for summary disposition were granted by ASLB.

ISSUE DRAFT SER:

01/15/81 01/15/81C Hearing started 06/22/81 and ended 09/31/81.

A INPUT TO SER:

06/23/78 01/15/31C decision on low power operation was issued on 01/11/82.

ISSUE SER:

08/01/80 02/06/81C An ASLB initial decision on full power operation was ACRS LETTER RECEIVED:

03/17/81 03/17/81C issued on 05/14/82.

INPUTS TO SE SUPPLEMENT 6:

06/27/82 ISSUE SE SUPPLEMENT 6:

06/30/82 FEMA LETTER RECEIVED:

12/01/81 12/01/81C CURRENT ANTITRUST:

The Staff is r eviewing the OL antitrust information.

HEARING STARTED:

06/22/81 06/22/31C l

ASLB INITIAL DECISION:

05/14/82 05/14/82C ASLB FINAL DECISION:

06/00/82 TECH SPECS COMPLETED:

02/16/82 02/16/82C COMMISSION DECISION:

06/15/82 ISSUE LIC. WITH POWER RESTRICTIGH: 02/16/82 02/16/82C ISSUE FULL POWER LICENSE AMEND:

08/01/82 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL..

0 2/16/ 82 C 02-09-82

2 NRR L ICENS ING SYSTEN PAGE NO: 2-21 SEABROOK 1 &2 0L CURRENT STATUS REPQRT REPORT AS OF: 06/16/82 PLANT CHARACTER I S T I C 5:

1 EY PERS0NN E L:

DOCKET NO:

044330444 LIC. PM:

L. WHEELER ASLB CHAIR:

H.

H0YT APPLICANT:

PL'BLIC SERVICE OF HEW HAMPSHIRE LIC. EC:

F. MIRAGLIA MEMBER 1:

E.

LUEEKE LOCATION:

10 MI S OF PORTSM0UTH, NH LIC. LA.

J.

LEE MEMBER 2:

O.

PARIS l

REGIDH:

1 AE:

UEC COUNSEL:

R.

LESSY CONST. INSP:

A.

TOTH l

REAC. TYPE: PWR NSSS: UEST ANTITRUST:

A.

HDDGDON RESID. INSP:

A.

CERNE DESIGH PWR: 3411 MWT/1198 MWE CONST: UEC RM ANALYST:

B.

ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The FSAR acceptance review was conpleted ir, September 1981 The FSAR was docketed October 5, 1981 Applicant has ER DOCKETED:

10/05/81 10/05/81C responded to round 1 Q's.

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

03/01/'2 03/01/82C ISSUE DES:

05/14/82 05/14/82C RESPONSE TO COMMENTS ON DES:

08/13/82 ISSUE FES:

10/05/82 CURRENT ENV. STATUS:

ER was tendered June 1981.

ER acceptance review was completed September 1981 The ER was docketed SAFETY / HEARING MILESTONES:

October 5, 1981 DES was issued May, 1982.

APPLICATION TENDERED:

06/29/81 06/29/81C SAR DOCKETED:

10/05/81 10/05/81C SAR Q'S RECEIVED BY PM:

01/20/82 03/05/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:

INPUT TO DRAF) SER TO PM:

06/25/82 Notice for Opportunity for Hearing was published in ISSUE DRAFT SER:

07/30/82 the Federal Register on October 19, 1981 First prehearing IhPUT TO SER:

08/07/82 conference was held May 6-7, 1902.

Second prehearing ISSUE SER:

09/07/82 conference is scheduled for July 15-16, 1982.

ACRS FULL COMMITTEE MEETING:

10/08/82 INPUTS TO SE SUPFLEMENT 1:

10/10/22 ISSUE SE SUPPLEMENT 1:

10/30/82 FEMA LETTER RECEIVED:

10/30/82 CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

03/00/83 ASLB INITIAL DECISIGH:

10/00/83 ASLB FINAL DECISION:

11/00/83 TECH SPECS COMPLETED:

l COMMISSIDH DECISION:

11/00/83 l

ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

11/00/53 44 SCHED. DATE RECEIPT DATE NEW SLIPS /HDTES:

Applicant critical psth construction progress is behind CONSTRUCTION COMPLETICH - APPL.

11/30/83 04/29/82 schedule. Potential impact on licensing schedule is being evaluated.

PAGE NO: 2-22 NRR L ICENSING SYS T EM 0L CURR EN T STA TUS Rc PQRT REPORT AS OF: 06/16/82 SHOREHAM PLAN T CHARACT ER IST I C 5:

KEY P E R S O N N E L:

LIC. PM:

R.

GILBERT ASLB CHAIR:

L. BRENFER DOCKET NO:

05000322 LIC. BC:

A.

SCHWENCER MEMBER 1:

P. MORRIS APPLICANT:

LONG ISLAND LIGHTING CO.

LIC. LA.

E. HYLTON MEMEER 2:

J. CARPENTER R EGI O!;:

1 AE:

58W COUNSEL:

B BORDENICK CONST. INSP:

L. NARRCW LOCATION:

BROOKHAVEN, NY (LI)

REAC. TYPE: BWR HSSS: GE ANTITRUSTt

. '. RUTBERG RESID. I N~s P :

J. HIGGENS LANIER DESIGN PWR: 2436 MWT/0849 MWE CONST: $8W RM ANALYST:

ENVIRO'fENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

The ACRS meeting was held in October 1981.

SER Supplemont 2 was issued in March 1982.

An additional ER DOCKETED:

01/26/76 01/26/76C SER Supplement is scheduled for Sept. 1982 or earlier ER SITE VISIT COMPLETE:

08/06/76 03/03/76C INPUT TO DES 10 PM:

11/22/76 11/29/76C to address resolution of outstanding matters.

03/11/77 03/24/77C ISSUE DES:

RESPONSE TO COMMENTS ON DES:

07/22/77 07/22/77C ISSUE FES:

10/21/77 10/18/77C CURRENT ENV. STATUS:

The environmental review is complete.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/00/75 09/04/75C SAR DOCKETED:

12/15/77 01/26/76C SAR Q S RECEIVED BY PM:

06/04/76 07/09/76C SAR /PPL. PESPONSE 10 Q'S FECEIVED: 07/23/76 07/23/76C INPJT TO DRAFT SER TO PM:

07/15/77 08/01/77C CURPENT HRG. STATUS:

ISSUE DRAFT SER:

INPhT TO SER:

03/10/81 03/10/81C OL hearing started May 4, 1982.

04/10/81 04/10/81C ISSUE SER:

i ACRS LETTER RECC1VED:

09/18/81 10/19/81C INPUTS TO SE SUPPLEMENT 3:

08/01/82 ISSUE SE SUPPLEMENT 3:

09/CO/82 FlMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

HEARING STARTED:

05/04/82 05/04/82C Not required.

ASLB INITIAL DECISION:

03/00/83 ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

03/00/83 ISSUE LIC. WITH POWER RESTRICTION: 09/20/82 ISSUE FULL POWER LICENSE AMEND:

LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.

09/20/82 04/30/82

NRR LICENSING

$V$ TEM PAGE NO: 3-23 SOUTH TEXAS 1 &2 0L CURRENT STATUS REPORV REPORT AS OF: 06/16/82 I PLAN T CHARACT E R I S T I C 5:

K EY P E R S 0 N N E L:

DOCKET NO:

049880499 LIC. PM:

D. SELLS ASLB CHAIR:

C. BECHHOEFER APPLICANT:

HOUSTON LIGHTIN" AND POWER COMPANY LIC. BC:

F. MIRAGLIA MEMBER 18 J. LAMB LOCATION:

12 MI SSW OF BAY CITY, TEX LIC. LA.

J.

LEE MEMBER 2:

E. HILL REGION:

4 AE:

BECH COUNSEL:

J. GUTIERREZ CONST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP W. HILL DESIGN PWR: 3800 MWT/1250 MWE CONST: EBASCO RM ANALYST:

L. LANIER CUR R ENT S.'.F.

STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Limited work being performed due to higher priorities.

Work on QA programs and manaqument qual. compl. for ER DOCKETED:

07/17/76C expedited heariro on these issues. B & R is being ER SITE VISIT COMPLETE:

09/26/78 09/26/78C replaced by Bechtel as the A/E.

B & R has been replaced INPUT TO DES TO PM:

03/01/83 by Ebasco as the constructor. Non-safety related constr.

ISSUE DES:

04/01/83 scheduled about July 15, 1982.

Restart of safety related RESPONSE TO COMMENTS ON DES:

08/15/83 constr. restarted on June 25, 1982.

Current FLD is 12/86.

ISSUE FES:

09/02/83 Changes in rev. schedule will be rec'd. in July '82.

CURRENT ENV. STATUS:

No activity scheduled pending revision of construction completion date by applicant in July '82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

05/10/78 05/10/78C SAR DOCKETED:

07/17/78C SAR Q'S RECEIVED BY PM:

01/22/79 02/08/82C SAR APPL. RESPONSE TC Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER'TO PM:

12/01/82 As provided in a Commission Order of 9/22/80, an ISSUE DRAFT SER:

12/27/83 expedited hearing on QA programs and management was INPUT TO SER:

06/04/83 held.

The record of this phase of the hearing ISSUE SER:

07/01/83 was closed on June 17, 1982. Phase II of hearing will consider all aspects of Quadrex Report.

tCRS FULL COMMITTEE MEETING:

04/07/83 Phase II is expected to begin in late '82 or early '83.

INPUTS TO SE SUPPLEMENT 1:

08/14/83 ISSUE SE SUPPLEMENT 1:

08/11/83 FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Memo and Order issued May 6, 1982 approving settlements and HEARING STARTED:

01/00/84 proposed license conditions and dismissing proceeding.

ASLB INITIAL DECISION:

06/00/84 ASLB FINAL DECISION:

TECH SPECS COMPLETED:

08/15/83 COMMISSION DECISION:

6%/05/86 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENT.ENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/86 Admendment #25 was i ssued 03/ ?5/82.

SCHED. PATE RECEIPT DATE NEW SLIPS / NOTES:

Further slips and additional staff review will be CONSTRUCTION COMPLETION - APPL.:

12/00/86 03/0n/82 required as a result of AE change.

NRR L ICENSING SYSTEM PAGE NO: 2-24 0L CURRENT STATUS REPORT REPORT AS OF: 06/16/82 ST LUCIE 2

- n.

KEY PERS0NNEt PLANT C N A R A C T E R I S T I C S:

ASLB CHAIR:

E. BOWERS LIC, PM:

V. HERSt a DOCKET NO:

05000389 APPLICANT:

FLORIDA POWER 8 LIGHT LIC. BC:

F. MIRAGLIA MEMBER 1:

P. MORRIS LOCATION:

12 MI SE OF FT. PIERCE, FLA LIC. LA.:

J.

LEE MEMBER 2:

0.

PARIS REGION:

2 AE:

EBASCO COUNSEL:

J. THESSIN CONST. INSP: R. WRIGHT REAC. TYPE: PWR NSSS: COMB ANTITRUST:

8. V0GLER RESID. INSP: S.

ELROD DESIGN PWR: 2700 MWT/0842 MWE CONST EBASCO RM ANALYST:

M.

ANDERSON INVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Status of Q-1 and Q-2 review i s complete. The SER was 02/17/81C issued on 10/09/81. SE Supplement No. 1 was issued ER DOCKETED:

ER SITE VISIT COMPLETE:

02/18/81 02/18/81C on 12/30/81.

INPUT TO DES TO PM:

08/07/81 08/07/81C ISSUE DES:

10/16/81 10/16/81C RESPONSE TO COMMENTS ON DES:

02/08/82 02/08/82C ISSUE FES:

04/23/82 04/23/82C CURRENT ENV. ST t.TUS :

The DES was issued on 10/16/81 and the FR Notice was published 10/30/81 The FES was issued on 04/23/82.

SAF2TY/ HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/17/81C SAR Q'S RECEIVED BY PM:

06/15/81 06/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED:

INPUT TO DRAFT SER TO PM:

08/03/81 08/03/81C CURRENT NRG. STATUS:

There have been no petitioners on matters dealing with ISSUE DRAFT SER:

08/10/81 08/10/81C INPUT TO SER:

09/11/81 09/11/31C health, safety and environment.

ISSUE SER:

10/09/81 10/09/81C ACRS FULL COMMITTEE MEETING:

11/12/81 11/12/81C INPUTS TO SE SUPPLEMENT 2:

07/23/82 ISSUE SE SUPPLEMENT 2:

08/27/82 l

FEMA LETTER RECEIVED:

06/30/82 CURREMT ANTITRUST:

Settlement among the Department of Justice, the NRC Staff HEARING STARTED:

N/A and the licensee has been agreed upon.

no cantested ASLB INITIAL DECISION:

N/A ASLB FINAL DECISION:

N/A hearing is expected.

TECH SPECS CCMPLETED:

09/30/82 COMMISSION DECISI0H:

09/30/82 ISSUE LIC. WITH POWER RESTRICTION: N/A ISSUE FULL POWER LICENSE AMEND:

10/31/82 LATEST AMENDMENT:

No. 10 (FSAR); No. 4 (ER)

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL..

10/28/82 12/31/81 1

p s

x

?

NRR LICENSING SYSTEM PAGE NO:

2-25 SUMMER 1 0L CURRENT STA TUS REP 0RT REPORT AS OF: C6/16/32 PLANT C H A R A C T E R I S T I C 5:

KEY P E R S 0 N N E L:

DOCKET NO:

05000395 LIC. PM:

W.

KANE ASLB CHAIR:

H.

GROSSMAN APPLICANT:

SOUTH CAROLINA ELECTRIC 1 GAS CO.

LIC. BC:

B. YOUNGBLOOD MEMBER 1:

G.

LINENBERGER LOCATION:

26 MI NW OF COLUMBIA. SC LIC. LA.

M.

RUSHBROOK MEMBER 2:

F.

HOOPER REGION:

2 AE:

GIL COUNSEL:

S.

GOLDBERG CONST. IN3P:

REAC. TYPE: PWR HSSS: WEST ANTITRUST:

B.

V0GLER RESID. INSP:

J.

SK0LDS DESIGN PWR: 2785 MWT/0900 MWE CONST: DANIEL RM ANALYST:

D.

SCHWARZ l

CURRENT sac. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER Supplement No. 1 was issued 04/28/81 Supplement No. 2 to the SER was issued on 05/28/81.

Supplement No.

ER DOCKETED:

01/21/77 02/24/77C 3 was isssed in January 1982.

The estimated date for ER SITE VISIT COMPLETE:

06/30/78 06/07/73C issuance of Supplement No. 4 is Jcly 9, 1982.

Projected INPUT TO DES TO PM:

09/21/78 05/29/79C date for issuance of a license with power restriction ISSUE DES:

10/30/78 06/22/79C j

is July, 1982.

RESPONSE TO COMMENTS ON DES:

07/01/80 07/24/80C ISSUE FES:

05/1S/81 05/21/81C CURRENT ENV. STATUS:

DES supplement on Class 9 accidents was issued in November 1980.

The FES was issued in May, 1981.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/10/76 12/10/76C SAR DOCKETED:

01/21/77 02/24/77C SAR Q'S RECEIVED 3Y PM:

02/C3/78 0 /08/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/21/78 6 9/18/ 78 C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

06/16/78 02/21/79C On 04/31/81 the ASLB by order granted the FUA intervention ISSUE DRAFT SER:

N/A on to contentions. The ASLAB on 06/01/81 reversed the ASLB INPUT TO SER:

06/02/80 12/15/83C decision to admit FUA as an intervenor. The contested ISSUE SER:

08/01/80 02/06/31C hearing began 06/81 and was completed in January 1982.

ASLB initial decision is estimated for 07/82.

ACRS LETTER RECEIVED:

03/18/81 03/18/81C INPUTS TO SE SUPPLEMENT 4 06/25/82 ISSUE SE SUPPLEMENT 4:

07/09/82 FEMA LETTER RECEIVED:

11/13/81 11/13/81C CURRENT ANTITRUST:

The Attorney general sent his advice on significant HEARING STARTED:

06/22/81 06/22/81C changes to the Commission on 10/10/80.

The Commission ASLB INITIAL DECISION:

07/00/82 on 06/26/81 denied Central Electric Power Coop., Ire.

ASLB FINAL DECISION:

07/00/82 petition for antitrust review.

TECH SPECS COMPLETED:

07/00/82 COMMISSION DECISION:

08/00/82 ISSUE LIC. WITH POWER RESTRICTION: 07/00/82 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

09/00/82 Number 31.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

The ASLB has slipped the date for the initial decision CONSTRUCTION COMPLETION - APPL.

07/00/82 from 05/82 to 07/82.

'PAGE NO: 2-26 NRR LICENSING SYSTEM SUSQUEHANNA 1 & 2 0L CURRENT STATUS REPORT REPORT AS OF: 06/16/82 KEY PERS0NN E L:

PLANT CHARACT E R I $ T I C 5:

LIC. PM:

R. PERCH ASLB CHAIR:

J.

GLEASON APPLICANT:

PENNSYLVANIA POWER & LIGHT LIC. BC:

A.

SCHWENCER MEMBER 1:

G.

BRIGHT DOCKET NO:

038780333 LOCATION:

7 MI NE OF BERWICK, PA LIC. LA.

E. HYLTON MEMBER 2:

P. PURDOM REGIDH:

1 AE:

BECH COUNSEL:

J. CUTCHIN CONST. INSP: L. HARROW REAC. TYPE: BWR hSSS: GE ANTITRUST:

A.

HODGDON RESID. INSP: G. RHCnOS DESIGN PWR: 3440 MWT/!052 MWE CONST: BECH RM ANALYST:

L. LANIER ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SER was i ssued 04/06/81 SSER 81 was issuod 07/07/81.

06/10/78C Post ACRS SSER 82 was issued 09/10/81 SSER 83 to be ER DOCKETED:

ER SITE VISIT COMPLETE:

10/20/78 10/20/78C issued in July 1982.

INPUT TO DES TO PM:

03/30/81 03/30/81C ISSUE DES:

03/30/81 03/30/86C RESPONSE TO CCMMENTS ON DES:

05/21/81 05/21/81C ISSUE FES:

06/15/81 07/02/81C CURRENT ENV. STATUS:

DES was issued on 03-30-81.

FES was issued 07-02-82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/05/78 04/10/78C SAR DOCKETED:

07/31/78 07/31/78C SAR Q'S RECEIVED BY PM:

11/17/78 05/15/79C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S INPUT TO DRAFT SER TO PM:

04/07/80 04/07/80C CURRENT HRG. STATUS:

The OL hearing is complete; Ini +.l al deci si on issued on ISSUE DRAFT SER:

INPUT TO SER:

03/23/81 03/23/81C 04-12-82.

ISSUE SER:

04/06/81 04/06/81C ACRS LETTER RECEIVED:

08/15/81C INPUTS TO SE SUPPLEMENT 3:

04/30/82 ISSUE SE SUPPLEMENT 3:

07/00/82 FEMA LETTER RECEIVED:

06/00/82 OL antitrust review presently being conducted by staff for HEARING STARTED:

10/06/81 10/06/81C CURRENT ANTITRUST:

the purpose of determining whether significant changes have ASLB INITIAL DECISION:

04/12/82 04/12/82C l

occurred since our last antitrust review took place.

ASLB FINAL DECISION:

i TECH SPECS COMPLETED:

COMMISSIDH DECISION:

08/00/82 ISSUE LIC. WITH POWER RESTRICTION: 07/01/82 ISSUE FULL POWER LICENSE AMEND:

l LATEST AMENDMENT:

FSAR:

No. 30; ER:

No. 5 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.'

07/01/82 05/11/82

NRR LECEN52NG

$YSTEM PAGE NO: 2-27 WASHINGTON NUCLEAR 1 PCP CURRENT STAVUS REPORT REPORT AS OF 06/16/82 l

PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

05000460 LIC, PM:

. UNASSIGNED ASLB CHAIR:

APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

B. YOUNGBLOOD MEMBER 1:

LOCATION:

30 MI NW OF RICHLAND, WASH LIC. LA.:

M.

DUNCAa NEMBER 2:

REGION:

5 AE UEC COUNSEL:

M. YOUNG CONST. INSP: P. NARBUT REAC. TYPE: PWR NSSS: B1W ANTITRUST:

RESID. INSP A. TOTH DESIGN PWR: 3760 MWT/1267 MWE CONST: BECH RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was tendered on 11-25-81 This schedule is being reconsidered in-light of a notice of deferral from ER DOCKETED:

07/00/82 the applicant. A review schedule will be established ER SITE VISIT COMPLETE:

following construction resumption. Application to be INPUT TO DES TO PM:

docketed in July, 1982.

ISSUE DES:

N/S RESPONSE TO COMMENTS ON DES:

ISSUE FES:

N/$

1 l

l l

CURRENT ENV. STATUS:

1 DES issuance will be scheduled following resumption of l

construction.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/25/81 11/25/81C l

SAR DOCKETED:

07/00/82 j

SAR Q'S RECEIVED BY PM:

l SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER'TO PM:

Notice of Opportunity for Hearing is to be published ISSUE DRAFT SER:

in the Federal Register.

INPUT TO SER:

ISSUE SER:

N/S ACRS FULL COMMITTEE MEETING:

N/S INPUTS TO SE SUPPLEMENT 1:

ISSUE SE SUPPLEMENT 1:

N/S FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

N/S ASLB INITIAL DECISION:

N/S ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/85 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Construction delay of from 2 to 5 years was announced CONSTRUCTION COMPLETION - APPL.:

12/00/85 05/07/82 on 4/29/82.

NRR LICENSING SYSTEM PAGE HO: 2-28 WASHINGTON NUCLEAR 2 0L CURRENT STATUS REP 0RT REPORT AS OF: 06/16/32 PLANT CNARACTER I S T I C 5:

KEY P E R S 0 N H E L:

LIC. FM:

R.

AULUCK ASLB CHAIR:

E. BOWERS DOCKET NO:

05000397 APPLICANT

A.

SCHWEHCER MEMBER 1:

R. COLE LOCATION:

30 MI NW OF RICHLAND, WASH LIC. LA.

E. HYLTON MEMBER 2:

E.

HILL REGION:

5 AE:

BER COUNSEL:

W.

PATON CONST. INSP:

A.

TOTH REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP:

R.

FEIL DESIGH PWR: 3323 MWT/1103 MWE CONST: BECH RM I.HA;YST:

L.

LANIER ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SER was i ssued 3/31/82. Geology / Seismology reviews will be included in SSER No. 1 to be issued in August ER DOCKETED:

02/28/77 04/20/77C 1982. ACRS meeting target date is September 1982.

ER SITE VISIT COMPLETE:

07/13/77 07/14/77C INPUT TO DES TO PM:

06/30/81 06/30/81C ISSUE DES:

07/31/81 07/31/81C RESPONSE TO COMMENTS OH DES:

09/28/81 09/28/81C ISSUE FES:

12/31/81 12/31/81C CURRENT ENV. STATUS:

FES was issued 12-31-81.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/30/76 12/30/76C SAR DOCKETED:

04/01/78 06/22/78C SAR Q'S RECEIVED BY PM:

01/05/79 03/07/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/11/79 07/26/79C INPUT TO DRAFT SEk TO PM:

10/12/31 10/12/81C CURRENT HRG. STATUS:

ISGUE DRAFT SER:

11/17/81 11/17/81C Not required INPUT TO SER:

05/30/82 05/30/82C ISSUE SER:

03/31/82 03/31/82C ACRS FULL COMMITTEE MEETING:

09/09/82 INPUTS TO SE SUPPLEMENT 1:

09/24/82 ISSUE SE SUPPLEMENT 1:

08/06/82 FEMA LETTER RECEIVED:

10/01/E2 CURRENT ANTITRUST:

HEARING STARTED:

N/A l

Not required ASLB INITIAL DECISIDH:

N/A ASLB FINAL DECISIGH:

TECH SPECS COMPLETED:

08/30/82 COMMISSION DECISION:

08/00/83 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

09/00/83 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE I

NEW SLIPS /HDTES:

Geology review is pacing item and requires a pre-ACRS CONSTRUCTION COMPLETION - APPL.4 09/00/83 05/07/82 SSER supplement now estimated for early August.

    • eptember ACRS is predicted on resolution of this issu e.

NRR LICEN58NG SYS1EM PAGE NO: 2-29 WASHINGTON NUCLEAR 3 0L CURRENT STATUS QEP0RY REPORT AS OF: 03/1G/82 PLANT C H A R A C T E R I S T I C S:

k. E Y P E R S 0 N N E L:

DOCKET NO:

05000508 LIC. PM:

. UNASSIGNED ASLB CHAIR:

R. LAZO APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

F. MIRAGLIA MEMBER 1:

E. LUEBKE LOCATION:

26 MI W OF OLYMPIA, WA LIC. LA.:

M. RUSHBROOK MEMBER 2:

D. SCHINK REGION:

5 AE:

EBASCO COUNSEL:

D. SWANSON CONST. INSP: D. KIRSCH REAC. TYPE: PWR NS$$: COMB AhTITRUST:

B. V0GLER RESID. INSP:

l DESIGN PWR: 3800 MWT/1242 MWE CONST: EBASCO RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was tendered on June 2, 1982, and is estimated to be docketed on 08/82.

ER DOCKETED:

08/00/82 ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

05/00/83 RESPONSE TO COMMENTS ON DES:

ISSUF FES:

10/00/83 CURRENT ENV. STATUS:

Application was tendered on June 2, 19S2, and is estimated to be decketed on 08/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/02/82 06/02/82C SAR DOCKETED:

08/00/82 SAR Q'S RECEIVED BY PM:

SAR APPL. KESPONSE TO Q'S RECEIVED:

i CURRENT H'RG. STATUS:

INPUT TO DRAFT SER TO PM:

Hotice of opportunity for Hearing is to be published ISSUE DRAFT SER:

in the Federal Register.

INPUT TO SER:

ISSUE SER:

04/0G/84 ACRS FULL COMMITTEE MEETING:

06/00/84 INPUTS TO SE SUPPLEMENT 1:

ISSUE SE SUPPLEMENT 1:

07/00/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

08/00/84 l

ASLB INITIAL DECISION:

05/00/85 l

ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

06/00/85 l

ISSUE LIC. WITH POWER RESTRICTION:

l LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

06/00/86 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:

CONSTRUCTION COMPLETION - APPL.:

06/00/86 05/07/82

~. _ _...

HRR LICEN5IHG SYST EM PAGE NO: 2-30 WATERFORD 3 0L CURRENT STA TUS REPORT REPORT AS OF: 06/16/82 FLANT CHARACT ER I S T I C 5:

KEY P ERS0NN E L:

LIC. PM:

S. BLACK ASLB CHAIR:

S. WOLFE DOCKET NO:

05000382 APPLICANT:

LOUISIANA POWER & LIGHT LIC. BC:

F. MIRAGLIA MEMBER 1:

W.

JORDAN f

LOCATION:

20 MI W OF NEW ORLEANS, LA LIC. LA.

J.

LEE MEMBER 2 H.

FOREMAN I

REGIGH:

4 AE:

EBASCO COUNSEL:

S.

TURK CONST. INSP:. UNASSIGHED RLAC. TYPEr PWR NSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP: L. CONSTABLE DESIGN PWR' 3560 MWT/1151 MWE CONST: EBASCO RM AHALYST:

M.

KING ENVIRONMENTAL MILTSTCHES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

The safety review was expedited.

The SER was issued July 9.

I?St.

Fuel load date delayed until 01/83 by ER DOCKETED:

12/00/78 12/00/78C ER SITE VISIT COMPLETE:

12/05/80 12/05/80C applicant from 10/82.

INPUT TO DES TO PM:

04/06/81 04/06/81C ISSUE DES:

05/01/81 05/01/81C RESPONSE TO COMMENTS ON DES:

07/24/81 08/19/81C ISSUE FES:

09/30/81 09/30/81C CURRENT ENV. STATUS:

The DES was completed on May 1981 FES was completed SAFETY / HEARING MILESTONES:

September 1981.

APPLICATI0H TENDERED:

09/28/78 09/28/78C SAR DOCKETED:

12/18/78C SAR Q'S RECEIVED BY PM:

N/S SAE APPL. RESPONSE TO Q'S RECEIVED: 08/08/80 12/15/80C IMPUT TO DRAFT SER TO PM:

10/03/80 08/15/81C CURRENT HRG. STATUS:

Contested hearing started 03/82.

Discovery among the ISSUE CRAFT SER:

parties has been held.

Hearing record closed 5/12/82.

INPUT TO SER:

05/08/81 05/15/81C ISSUE SER:

07/09/81 07/09/81C ACRS LETTER RECEIVED:

08/08/81 08/08/81C INPUTS TO SE SUPPLEMENT 4:

06/30/82 ISSUE SE SUPPLEMENT 4:

07/30/82 FEMA LETTER RECEIVED:

11/30/82 CURRENT ANTITRUST:

Staff is reviewing OL Antitrust information.

HEARING STARTED:

03/0J/82 03/23/82C ASLB INITIAL DECISION:

09/00/82 ASLB FINAL DECISION:

10/00/82 TECH SPECS COMPLETED:

12/30/82 COMMISSIGH DECISION:

12/30/82 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

LATEST AMENDMENT:

ER 83 - 8/81 SCHED. DATE RECEIPT DATE FSAR 827 - 4/82 NEW SLIPS /HOTES:

To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.*

01/16/83 09/00/80 emergency plan.

NRR LICEN$ING SYSTEM PAGE NO: 2-31 WATVS BAR 1 &2 0L CURRENT STATUS REPQRT REPORT AS OF 06/16/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

039010391 LIC. PM:

T. KENYON ASLB CHAIR: N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM MEMBER 1:

N/A LOCATION:

10 MI S OF SPRING CITY. TENN LIC. LA.:

M. DUNCAN MEMBER 2:

N/A REGION:

2 AE2 TVA COUNSEL:

M. YOUNG CONST. INSP R. CRLENJAK REAC. TYPE: PWR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP: J. MCDONALD DESIGN PWR:

341. P'JT/1165 MWE CONST: TVA RM ANALYST:

M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCNED. DATE ACTUAL DATE Additional applicant information is needed on non-TMI and TMI issues. CFP predicted earliest Unit 1 completion date ER DOCKETED:

01/e3/77 11/23/76C at 08/83. Nevertheless, schedule is being expedited by ER SITE VISIT COMPLETE:

03/18/77 02/25/77C requiring concurrent review with Sequoyah for all areas INPUT TO DES TO PM:

07/06/77 08/18/77C where the plants are identical (non site specific matters).

ISSUE DES:

11/29/77 06/02/78C RESPONSE TO COMMENTS ON DES:

N/A ISSUE FES:

11/24/78 12/29/78C CURRENT ENV. STATUS:

l Complete except for environmental toch specs.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/30/76 06/30/76C SAR DOCKETED:

10/04/76 10/04/76C SAR Q'S RECEIVED BY PM:

12/15/76 05/20/77C SAR APPL. RESPONSE.TO Q'S RECEIVED: 03/23/77 02/10/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

06/18/80 04/20/82C No hearings are assumed.

ISSUE DRAFT SER:

INPUT TO SER:

06/04/82 06/04/82C ISSUE SER:

06/25/82 ACRS FULL COMMITTEE MEETING:

08/12/82 INPUTS TO SE SUPPLEMENT 1 08/27/82 ISSUE SE SUPPLEMENT 1:

09/10/82 FEMA LETTER RECEIVED:

04/00/83 CURRENT ANTITRUST:

Complete HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A ASLB FINAL DECISION:

TECH SPECS COMPLETED:

11/00/82 COMMISSION DECISION:

07/00/83 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

08/03/83 FSAR No. 46 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

08/00/83 04/09/82 l

l l

PAGE h0: 2-32 il R R LICEHSING 9YSiEM WOLF CREEK 1 0L CURRENT STATUS REPOPT REPORT AS OF: 06/16/82 PLAHT CHARACTER IST I C S:

KEY PERS0NN E L:

LIC. PM:

J.

HOPKINS ASLB CHAIR:

J. GLEASON

.IC.

BC:

8. YOUNGBLOOD MEMBER 1:

J. LEEDS DOCKET NO:

05000482 APPLICANT:

KANSAS GAS & ELECTRIC LOCATION:

3.5 MI NE OF BURLINGTON, KAN Lar.

LA..

M. RUSHBROOK MEMBER 2:

G. ANDERSCH REGIDH:

4 AE:

BECH COU 3EL:

M. KARMAN CONST. INSP:

REAC. TYPE: PWR NSSS: WEST A N T I T.'4 S T :

B. VCGLER RESID. INSP:

T. VANDEL DESIGN PWR: 3425 MWT/1150 MWE CONST: DANIEL RM ANAL.*T:

D. SU.AARZ ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

The SER was issued in April 1982.

SSER-1 is expected to be 11/25/80 11/25/80C ER DOCKETED:

ER SITE VISIT COMPLETE:

07/28/81 04/21/81C issued on August 30, 1982.

INPUT TO DES TO PM:

10/01/81 10 / 01/81C 01/05/82 01/05/82C ISSUE Dc.S RESPONSE TO COMMENTS ON DES:

05/14/82 05/14/82C 06/11/82 06/11/82C ISSUE FES:

CURRENT ENV. STATUS:

The DES was issued in January 1982.

The FES was i ssued SAFETY / HEARING MILESTONES:

in June 1982.

APPLICATION TENDERED:

OT'21/80 02/21/80C SAR DOCKETED:

06/07/80 08/07/80C SAR Q'S PECEIVED LY PM:

SAR APPL. RESPONSE TD Q'S RECEIVED:

INPUT TO DRAFT SER TO PM:

03/12/82 03/12/82C CURRENT HRG. STATUS:

Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

Federal Register on 12/18/80. Two petitions for INPUT TO SER:

03/19/82 03/19/82C leave to intervene were filed.

A special combined ISSUE SER:

04/07/82 04/07/82C prehearing conference was held on 4/15/81.

ACRS LETTER RECEIVED:

05/11/82 05/11/82C INPUTS TO SE SUPPLEMENT 1:

08/10/82 ISSUE SE SUPPLEMENT 1:

08/30/82 FEMA LETTER RECEIVED:

06/30/82 CURRENT ANTITRUST:

HEARING STARTED:

10/00/82 OL antitrust review is in progress.

ASLB INITIAL DECISIGH:

03/u0/83 ASLB FINAL DECISI0H:

04/00/83 i

TECH SPECS COMPLETED:

N/S l

COMMISSION DECISION:

11/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/S ISSUE FULL POWER LICENSE AMEND:

12/00/83 LATEST AMENDMENT:

SNUPPS FSAR - No. 9; Wolf Creek Site Addendum - No. 8; SCHED. DATE RECEIPT DATE ER - No. 3.

NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.

12/00/83 03/00/82 Caseload Forecast Panel estimates construction completion en 6/84.

NRR LICEN5ING SYSTEM PAGE NO:

2-33 ZIMMER 1 0l CURRENT STA TUS REPORT REPORT AS OF: 06/16/82 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NN E L:

DOCKET ND:

05000358 L1C. PM:

G.

EDISDN ASLB CHAIR:

J.

FRYE APPLICANT:

CINCINNATI GAS 8 ELECTRIC IIC. BC:

B. YOUhGBLOOD MEMBER 1:

F. HOOPER LOCATION:

24 MI SE OF CINCINNATI, ON LIC. LA.

M.

RUSHER 00K MEMBER 2:

M.

LIVINGSTON REGIDH:

3 AE:

58L COUNSEL:

C. BARTH CONST. INSP: D. HUNTER REAC. TYPE: BWR NSSS: GE ANTITRUST:

S.

LEWIS RESID. INSP:

F.

CHRISTIANSON DESIGN PWR: 2436 MWT/0810 MWE CONST: KAISER RM ANALYST:

M.

ANDERSON CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTCHES:

SCHED. DATE ACTUAL DATE SE Supplement was issued on 06/04/81 SE Supplement #2 was issued 10/81.

SE Supplement 83 is scheduled to be issued ER DOCKETED:

09/10/75 09/10/75C 07/15/82.

Licensing completion is estimated for 07/83.

ER SITE VISIT COMPLETE:

10/09/75 10/09/75C INPUT TO DES TO PM:

08/20/76 08/19/76C l

ISSUE DES:

10/15/76 10/15/76C RESPONSE TO COMMENTS ON DES:

03/25/77 04/01/77C ISSUE FES:

06/10/77 06/10/77C CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APFLICATION TENDERED:

08/15/75 05/09/75C SAR DOCKETED:

09/15/75 09/10/75C SAR Q'S RECEIVED BY PM:

10/29/76 01/06/77C SAP APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/28/77 08/11/77C Hearing was completed March 5, 1982.

Board decision was ISSUE DRAFT SER:

N/A rendered in June, 1982.

Haaring is to be extended.

A INPUT TO SER:

05/20/77 12/07/77C new schedule has not yet been set.

Hearings could ISS'JE SER :

07/29/77 01/31/79C become the critical path in the licensing schedule.

ACRS LETTER RECEIVED:

09/16/77 03/13/79C INPUTS TO SE SUPPLEMENT 3:

06/17/82 l

ISSUE SE SUPPLEMENT 3:

07/15/82 l

FEMA LCTIER RECFIVED:

04/15/82 04/15/82C CURRENT ANTITRUST 4 Antitrust review is now closed.

Federal Register Notice HEARING STARTED:

02/26/82 C2/25/82C was published 04/09/82.

ASLB INITIAL DECISION:

06/21/P2 06/21/82C ASLB FINAL DECISION:

07/00/82 TECH SPECS COMPLETED:

07/29/82 COMMISSION DECISIDH:

11/03/82 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/82 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Applicant has slipped construction completion to 12/82.

CONSTRUCTION CCMPLETION - APPL.'

12/00/82 04/19/82 Therefore, Zimmer is no longer an impacted plant.

NRR L ICENSING SYSTEM

  • PAGE NO: 2-34 ALLENS CREEK 1 CP CURRENT

$TATUS REPQRT REPORT AS OF: 06/16/82 PLANT CHAR ACTERIST I C S:

KEY P ERS0NN E L:

LIC. PM:

C. MOON ASLB CHAIR:

S. WOLFE DOCKET NO:

05000466 LIC. BCs E.

ADENSAM MEMBER l'

E. CHEATUM APPLICANT:

HOUSTON LIGHTING AND POWER COMPANY LOCATION:

45 MI W OF HOUSTON, TX LIC. LA.

M.

DUNCAN MEPBER 2:

G.

LINEhBERGER REGION 4 4

AE:

EBASCO COUNSEL:

R.

BLACK CONST. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUST-A.

HODGDON RESID. INSP:

DESIGN PWR: 3758 MWT/1150 MWE CONST: EBASCO RM ANALYST:

B.

ST MARY ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SSER3 on TMI issues, was issued August 6.

12/07/73 12/07/73C ER DOCKETED:

The ACRS does not plan to review TMI issues for Allens Creek.

SSER4 on non-TMI issues including ER SITE VISIT COMPLETE:

G3/08/74 03/08/74C emergencu planning, financial capability; unresolved safety INPUT TO DES 70 PM:

06/07/74 06/07/74C issue; containment, ultimate heat sink, and fuel designs ISSUE DES:

07/05/74 07/05/74C RESPONSE TO COMMENTS ON DES:

09/23/74 10/ 01/ 74 C was issued October 30, 1981.

11/18/74 11/18/74C ISSUE FES:

CURRENT ENV. STATUS:

A draft second FES supplement was issued in December, 1980.

The final second supplement was issued March 13, 1981 SAFETY /HEARINC ;ILESTONES:

APPLICATION TENDERED:

08/24/73 08/24/73C SAR DOCKETED:

12/07/73 12/07/73C SAR Q'S RFCEIVED BY PM:

03/22/74 03/22/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 06/03/74 07/03/74C INPUI TO DRAFT SER TO PM:

08/09/74 09/20/74C CURRENT HRG. STATUS:

Env. hearing commenced 01/12/81 and was completed on ISSUE DRAFT SER:

05/15/31.

Safety sessions were held May 18-22 and June INPUT TO SER:

10/11/74 11/01/74C 1-12.

Further sessions were held on 10/5-9/81, ISSUE SER:

11/07/74 11/15/74C 10/26-30/81, 11/16-20/81, 12/7-11/81, 12/14-16/81 and ACRS LETTER RECEIVED:

12/20/74 12/13/74C 04/1?-14/82.

INPUTS TO SE SUPPLEMENT 48 01/10/7S 03/28/75C ISSUE SE SUPPLEMENT 4:

10/15/81 10/30/81C A set of proposed license conditions has been submitted HEARING STARTED:

03/11/75 03/11/75C CURRENT ANTITRUST:

to the '.icensing Board in the South Texas antitrust ASLB INITIAL DECISION:

11/00/82 proceeding.

If the South Texas Board approves the ASLB FINAL DECISION:

TECH SPECS COMPLETED:

conditions, they will be attached to the Allens Creek COMMISSION DECISION:

11/00/82

)

license.

CP ISSUED:

11/00/82 LATEST AMENDMENT:

NEW SLIPS / NOTES:

N R R L ICENS ING S ( 5T EM PAGE NO: 2-35 CLINCH RIVER CP CURREN T STATUS REP 0RT REPCRT AS OF: 06/16/82 P L A N T CHA RACT ERI$T I C S:

K EY P ERS0NN E L:

AFPLICANT:

PROJECT MANAGEMENT CORP., DOE:TVA LIC. BC:

C..

STARK LEECH ASLB CHAIR' M. MILLER DOCKET NO:

05000537 LIC. PM:

THCMAS MEMBER 1:

G.

LINENBERGER LOCATION:

25 MI W OF ANOXVILLE, TN LIC. LA.

P.

SHUTTLEW3RTH MEMBER 2:

C. HAND REGIGN:

2 AE:

B 1 P.

COUNSEL:

S.

TREBY CONST. INSP:

REAC. TYPE: LMFBR NSSS: WEST ANTITRUST:

J. EUTBERG RESID. INSP:

DESIGN PWR: 0975 MWT/0353 MWE CONST: S&W RM ANALYST:

L.

ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety review was reinitiated in October 1981 A revision to the Site Suitability Report was issued June 4, 1982.

ER DOCKETED:

04/11/75 04/11/75C ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

02/12/76C RESPONSE TO COMMENTS ON DES:

ISSUE FES:

02/07/77 02/07/77C CURRENT ET/. STATUS:

The FES was issued in February 1977.

A document updating the FES is ceing prepared for issuance on June 22, 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/15/74 10/15/74C SAR DOCKETED:

06/13/75 06/13/75C SAR Q'S RECEIVED BY PM:

04/09/82 04/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/15/82 05/15/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/16/82 The ASLB held a prehearing conference on 2/9-10/82, and ISSUE DRAFT SER:

08/27/82 on April 6-7, 1932.

INPUT TO SER:

01/14/83 ISSUE SER:

03/04/83 ACRS FULL COMMITTEE MEETING:

05/06/83 INPUTS TO SE SUPPLEMENT 1:

06/10/83 ISSUE SE SUPPLEMENT 1:

07/01/83 CURRENT ANTITRUST:

HEARING STARTED:

08/24/82 ASLB INITIAL DECISION:

05/01/84 ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

06/01/84 CP ISSUED:

06/01/84 LATEST AMENDMENT:

1 NEW SLIPS / NOTES:

NRR LICENSING SYSTEM PAGE NO: 2-36 PEBBLE SPRINGS 1 82 CP CURRENT STA TUS REPORT REPORT AS OF: 06/16/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET MO:

051480515 LIC. PM:

D. SCALETTI ASLB CHAIR:

I. SMITH APPLICANT:

PORTLAND GENERAL ELECTRIC LIC. BC:

E. A0ENSAM MEMBER 1:

D.

PARIS LOCATION:

3 MI NW OF ARLINGTON, ORE LIC. LA.

M.

DJNCAN MEMBER 2:

W.

JORDAN REGION:

5 AE:

BECH COUNSEL:

B. BORDENICK CONST. INSP REAC. TYPE: PWR NSSS: B3W ANTITRUST:

B. V0GLER RESID. INSP:

DESIGN PWR 3760 MWT/12CG MWE CONST BECH RM ANALYST:

L.

LANIER ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Amendment 13 to the PSAR in response to 10CFR50.34(f)

(CP/ML rule) was filed 1/29/82.

The staff's review of ER DOCKETED:

08/06/74 08/06/74C the TMI-2 issues is presently in a hold status awaiting ER SITE VISIT COMPLETE:

a decision by PGE whether or not to continue their INPUT TO DES TO PM:

10/t1/74 12/11/74C application at a different site (see Environmental Status).

ISSUE DES:

It/15/74 01/06/75C A deci sion is expected within 2 months.

RESPONSE TO COMMENTS ON DES:

03/07/75 03/22/75C ISSUE FES:

04/07/75 0 4/16 / 75C l

l CURRENT ENV. STATUS:

On 4/9/82, PGE withdrew their application, before the Oregon Energy facility siting council, for the Pebble SAFETY / NEARING MILESTONES:

Springs site.

The alternative sites hearing before the ASLB scheduled for 4/20 was cancelled.

APPLICATION TENDERED:

06/07/74 06/07/74C l

SAR DOCKETED:

10/18/74 10/18/74C i

SAR Q'S RECEIVED BY PM:

12/13/74 01/13/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/14/75 02/04/75C INPUT TO DRAFT SER TO PM:

04/i1/75 05/23/75C CURRENT HRG. STATUS:

A prehearing conference on alternative sites was held ISSUE DRAFT SER:

on December 1,

1981.

INPUT TO SER:

09/01/75 12/08/75C ISSUE SER 01/05/76 01/12/76C ACRS LETTER RECEIVED:

11/12/76 02/12/76C INPUTS TO SE SUPPLEMENT 6:

09/09/76 12/14/77C ISSUE SE SUPPLEMENT 6:

N/S CURRENT ANTITRUST:

Anti trust review i s complete.

HEARING STARTED:

ASLB INITIAL DECISION:

N/S ASLB FINAL DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

N/S CP ISSUED:

N/S LATEST AMENDMENT:

Amendment 13 to the PSAR in response to 10CFR50.34(f).

NEW SLIPS / NOTES:

NRR L ICENS ING SY$ TEM PAGE NO: 2-37 SKACIT/HANFCRD 182 CP CUR 3EN T ST A TUS REPORT REPORT AS OF: 06/16/82 PL ANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

052280523 LIC. PM:

C. MOON ASLB CHAIR:

J.

WOLF APPLICANT:

PUGET SOUNL POWER A LIGHT LIC. BC:

E. ADENSAM MEMBER 1:

F.

HOOPER LOCATION:

30 MI. NW OF RICHLAND, WA.

LIC. LA.

M.

DUNCAN NEMBER 2:

G.

LINENBERGER REGION:

5 AE:

BECH COUNSEL:

R.

BLACK CONST. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP:

DESIGN PWR: 3833 MWT/1777 MWE CONST: BECH RM ANALYST D.

SCHWARZ CURRENT SAF. STATUS:

ENVIRCNMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Supplement No. 2 to the SER was issued 10/8 1 on TMI-related action items.

Site relocatior, ER amendment and PSAR ER DOCKETED:

09/30/74 09/30/74C amendment were submitted on 12/31/81 The applicant is ER SITE VISIT COMPLETE:

92/05/82 02/05/82C relocating the site to the Hanford Reservation.

INPUT TO DES TO PM:

04/09/82 04/09/82C Supplement No. 3 to the SER is expected to be issued in ISSUE DES:

05/04/82 05/04/82C 6/82.

RESPONSE TO COMMENTS ON CCS:

08/06/82 ISSUE FES:

08/00/82 CURRENT ENV. STATUS:

Site relocatien (to Hanford) DES was issued on May 4, 1982.

The FES is expected to be issued in SAFETY / HEARING MILESTONES:

August 1982.

APPLICATION TENDERED:

08/06/74 08/06/74C SAR DOCKETED:

01/15/75 01/15/75C SAR Q'S RECEIVED BY PM:

C?/t0/82 02/10/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/18/82 03/18/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

A special prehearing conference was held on May 5, 1982.

ISSUE DRAFT SER:

Hearings are expected to continue in June 1982.

INPUT 10 SER:

07/11/77 0 7/11/7 7 C ISSUE SER:

08/31/77 08/31/77C ACRS FULL COMMIT 1EE MEETING:

07/00/82 INFUTS TO SE SUPPLEMENT 3:

04/09/82 04/09/82C ISSUE SE SUPPLEMENT 3:

06/30/82 CURRENT ANTITRUST:

Complete HEARING STARTED:

07/15/75 07/15/75C ASLB INITIAL DECISION:

04/00/83 ASLB FINAL DECISION:

N/S TECH SPECS COMPLETED:

N/A COMMISSION DECISION:

07/00/83 CP ISSUED:

07/00/83 LATEST AMENDMENT:

NEW SLIPS / NOTES:

l l

l l

PAGE HO: 2-38 NRR L ICEN$ING SYSTEM (BOP)BOPSSAR/BSAR-205 PDA CURRENT STA TUS REPORT REPORT AS OF: 06/t6/82 PL AN T CHARACTERI5T I C S:

KEY P E R S 0 N N E L:

LIC. PM:

. UNASSIGHED ASLB CHAIR:

DOCKET HO:

05000560 LIC. BC:

J. MILLER MEMBER 1:

APPLICANT:

FLUOR POWER SERVICES LIC. LA.

P. ANDERSON MEMBER 2:

REGIDH:

1 AE:

FLUOR COUNSEL:

?!/A CONST. INSP:

LOCATION:

N/A REAC. TYPE: BOP HSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWR: 0000 FWi/0000 MWE CONST:

RM ANALYST:

D. SCHWARZ ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Review in abeyance pending the future of standardization.

ER 00tKETED:

ER 3ITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/31/77 10/31/77C SAR DOCKETED:

10/31/77 10/31/77C SAR O'S RECEIVED BY PM:

04/14/78 06/20/78C SAR APPL. RESPCNSE TO Q'S RECEIVED: 06/02/78 07/31/78C INPUT TO DRAFT SER TO PM:

05/25/78 07/07/78C CURRENT HRG. STATUS:

ISSUE DRAFT SER:

INPUT TO SER:

G8/21/78 10/17/78C ISSUE SER:

10/02/78 12/29/78C ACRS LETTER RECEIVED:

11/17/78 02/16/79C INPUTS TO SE SUPPLEMENT 1:

12/08/78 03/21/79C ISSUE SE SUPPLEMENT 1:

N/S CURRENT AkT!13NST:

HEARING STARTED:

ASLB INITIAL DECISION:

COMMISSION DECISIDH:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:

NRR LICENSINO

$YSTEM PAGE ND: 2-33 (BOP)ESSAR/BSAR-20S PDA CURRENT

$TATUS REPORT REPORT AS OF: 06/16/82 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NN E L:

DOCKET NO:

00002591 LIC. PM:

, MILLER MEMBER 1:

UNASSIGNED ASLB CHAIR:

APPLICANT:

EBASCO SERVICES LIC, BC:

J.

LOCATION:

N/A LIC. LA.e P. ANDERSON MEMBER 2:

REGION:

0 AE:

EBASCO COUNSEL:

. UNASSIGNED CONST. INSP REAC. TYPE: BOP NSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWR: 0000 MWT/0000 MWE CONST:

RM ANALYST:

M.

KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Review in abeyanca pending the future of standardization, and resources to conduct review.

FR DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/23/77 11/23/77C SAR DOCKETED:

02/02/78 02/02/78C l

SAR Q'S RECEIVED BY PM:

N/S l

SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S ISSUE DRAFT SER:

INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL COMMITTEE MEETING:

N/S INPUTS TO SE SUPPLEMENT 1 N/S j

IS.0E SE SUPPLEMENT 1:

N/S CURRENT ANTITRUST:

HEARING STARTED:

ASLB INITIAL DECISION:

COMMISSION DECISION:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:

3 NRR LICENSING SYSTEM PAGE N3: 2-40 (80P)ESSAR/CESSAR-80 PDA CURRENT STATUS REPORT REPORT AS OF 06/16/82 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNELa LIC. PM:

. UNASSIGNED ASLB CHATR:

DOCKET NO:

05000S91 LIC. BC:

J. MILLER MEMBER 1:

APPLICANT:

EBASCO SERVICES LIC. LA.:

P.

ANDERSON MEMBER 2:

(

LOCATION:

N/A REGION:

0 AE:

EBASCO COUNSEL:

. UNASSIGNED CONST. INSP:

REAC. TYPE: B0P NSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWR: 3800 MWT/0000 MWE CONST:

RM ANALYST:

M. KING ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Review in abeyance pending the future of standardization, ER DOCKETED:

and resources to conduct review.

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/23/77 tt/23/77C SAR DOCKETED:

02/02/78 02/02/78C SAR Q'S RECCIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S INPUT TO DRAFT SER TO PM:

N/S CURRENT HRG. STATUS:

ISSUE DRAFT SER:

INPUT TO SER:

N/S ISSUE SER:

N/S ACRS FULL COMMITTEE MEETING:

N/S INPUTS TO SE SUPPLEMENT 1:

N/S ISSUE SE SUPPLEMENT 1 N/$

CURRENT ANTITRUST:

HEARING STARTED:

ASLB INITIAL DECISION:

COMMISSION DECISION:

SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:

l 1

NRR L2 CENSING SYSTEM PAGE NO: 2-41 (BOP)ESSAR/RESAR-414 PDA CURRENT STATUS REPQRT REPORT AS OF: 06/16/82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKt! NO 00007591 LIC. PM:

. UNASSIGNED ASLB CHAIRt APPLICAi!T EBASCO SERVICES LIC. BC:

J. MILLER MEMBER 1:

LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 2:

REGION:

0 AE:

EBASCO COUNSEL:

. UNASSIGNED CONST. INSP REAC. TYPE: BOP NSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWR: 0000 MWT/0000 MWE CONST:

RM ANALYST:

M. KING CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Review in abeyance pending the future of standardization, and resources to conduct review.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/23/77 11/23/77C SAR DOCKETED:

02/02/78 02/02/78C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S ISSUE DRAFT SER:

INPUT TO SER:

N/S IdSUE SER:

N/S ACRS FULL COMMITTEE MEETING:

N/S i

INPUTS TO SE SUPPLEMENT 1:

N/S ISSUE SE SUPPLEMENT 1 N/S CURRENT ANTITRUST:

HEARING STARTED:

ASLB INTTIAL DECISIDH:

COMMISSIdH DECISIDH SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:

4

-l llll I

2 2 4

8

/

E 6

T CC 2

1 A

88

/

D 77

//

6 O

0 L

41 N

A 22 U

//

E F T

28 G O C

00 A

A P S A

E T

T R

A 8

D 7

O P

PP

/

4 E

R

.SS NN D

2 R

I:

A12II E

/ SS SSSS SSS S

H 2

// //// ///

/

H C

0 NN NNNN NNN N

CRR EETD S

BBBSI D

LMMNS E

SEEOE AMFCR V

I E

C E

D S

R G

E E

N:

N N D

S :

I1 M

T E

N

'Q G O Y

P ET T

L IRSN R

SERA A

E O

S M

EN E

E SLEM M

S T

E :

PO O ME1 H

L T

ALDR E

E S

i D T

T M

D:P N

NINA T

N L:

T D E Y EET INM R

UMAK S O

PM N T

R BE R ELN SOO T

MP E S E S E TPE IIC N

S O

M E D DN S:

TPM

CS M O 0

JPM B E

CO M L

N EO R

IUE DEIT E P L

T O

I E VP TE MSL EDCC I

T C

M T: IS FS:

M P T

EE S

M

IS DEE A R OEP RLDJ T

E

T DSE O G NECR RTE CSU AA O

R S R

+

TS L

EID: T:

N OTE DFS:

S TINR A R LO STOP SY A TV S S I

IER E

T MCALUL T

E OEEE R TK L OROE LTE II P PBLERA N KETDSF A ACSP TDTS U S GNSL CO P FS NISA E

CT N

E I D 'Q A TETE TE I

II S S

.STN NIA M OITEOE H

U CCCUT N DSUUPU

/

L UUUU SUU RBMC Y

IIIONM O

PSSS Y PRRR PSPS RPS ALME G T LLLCAR R RRNSES T

PAAA NSNS CNS ESOP E

I EEIIRI E ASSS IIII AII NACS N A V

F K

N A

I T

E S

S S N

E T no C N i

I E

taz L

R i

R dr R U a

d R C T

n S

a i.

E t

W s

A f

T o

D SS S

P

SN e

C ESO r

ANC u

t I

I u.

f T

T L

w S

A E

ee E

W hi I

W M

tv N

e R

O 0

gr M

0 n

E M

0 it O

0 dc T

C

/

nu 5

T ed C

9T W

pn 5R M

o A

0E ec 0B 0

c R

0LA P0 Sno S

S 5I/

O0 Uat U

U A

0GN4B0 Ty T

T T

Aes A

A S

T H

Tbe T

T U

N S

Sac S

S R

E E

C ER r

T M

T OT:

PW

.nu I

D O

R NNN YP Fio V

P T

N N

A AO: T A

s N

R N

E

/

S T

TCIN N

Swe E

N A

M S

A P

S EITO

.G er I

N KLAICI Ti T

T T

I A

CPCGAS Nvd N

N N

T L

G A OPOEEE Een E

E E

S S

)

DALRRD RRa R

R R

E P

L R

R R

R T

W O

U U

U U

A E

B P

C C

C C

L N

(

l ll' llil lli llll lllIll I

4l 3 2 4 8

/

E 6

T CCC 2

1 A

679

/

D 777 6

///

O 0

L 506 N

A 111 U

///

E F T

053 G O C

100 A

A P S A

E T

T R

A 678 O

D 777 P

PP

///

E R

SS 583 R

I: :NN D

100 A12II E

///S S SS SSS S

H H

042/

/ // ///

/

CRR..

C 1

00N N NN NNN N

EETD S

BBBSI LMMNS D

SEEOE E

AMMCR V

I E

C E

D S

R G

E E

Na N N N

D S

Il G

O O

e M

T E

L IRSR S

N Q P ET T

SERE R E

O S

M EN8 E

E SLEN E

S T

E PO O ME1 N

L T

ALDG D E

E S

N D T

T M

OP N

NINA N

N L:

T O E Y EET IHM R

UMAW A

O PM N T R BE R ELN SGJ N

T MP E

S E S E TPE IIC M O S

O M

E D DN S:

TPM CS 0

JPM M E

CO M L

N EO R

IUE DEIT E P L

T O I

E VP TE MSL EDCC S

I T

C M

T: IS FS:

M P T

EE T

E M

IS DEE A R

OET RLDJ R

T DSE O G NECR RTE CSU AA O

$ R

'. : T S L

EID: T:

N OTE DFS:

S TIlR i L : :

SY A TV S S I

IER.

A R LO ST0P Y

MCALUL T

E OEEE R TK L

OROE LTE II P

PBLERA N KETDSF A ACSP TDTS U S GNSL S $

.STN E

CT N

M I D 'Q A CO P FS NISA NIA M

OITEOE TETE TE I

II U

CCCUT N DSUUPU L

UUUU SUU RBMC

/

Y IIIONM O

PSSS

)

PRRR PSPS RPS ALME G

T LLLCAR R RRNSES T

PAAA NSNS CNS ESOP E

I EEIIRI E ASSS IIII AII HACS N A V

F K

N A

I T E

S S S H

C T n

C N o

i I

E ta L

R z

i R

d r

R U a

d R C R

n D

a N

H t

C s

A f

D t

T o

S SS P

SN e

C ESO r

ANC u

I tu.

T f

w S

E ee W

hi I

M tv e R

0 gr L

0 n

E L

0 it I

0 dc T

H

/

nu 4

T ed C

8&

W pn S

M o

A 0S ec 0B 0

c R

0BA P0 Sno S

S 5I/

O0 Uat U

U A 0GN0B0 Ty T

T T

)

Aes A

A S

T W

H Tbe T

T U

N S

(

Sac S

S R

E E

C :

ER r

T M

T R

OT:

PW

.nu I

D O

A NNN YP Fio V

G

(

N N

S AO: T A

s N

R h

E

/

S T

1CIN N

Swe E

H A

M S

B EITO

.G er A

P B

N KLAICI Ti T

T T

I I

CPCGAS Nvd N

N N

T L

C A OPCEEE Een E

E E

S S

)

DALRRD RRa R

R R

E P

L R

R R

R T

W O

U U

U U

A E

B P

C C

C C

L N

(

l li' 1'

PAGE HO 2-44 NRR LICEN$ING SYSTEM (BOP)SWESSAR/BSAR-205 PDA CbRRENT STATUS REPORT REPORT AS OF: 06/16/82 PLAH T CHARACTER IST I C S:

KEY P E R S O N H E L:

LIC. PM:

. UNASSIGHED ASLB CHAIR:

DOCKET HO:

00000595 LIC. 8C:

J. MILLER MEMBER 1:

APPLICANT:

STOHE 8 WEBSTER LIC. LA.

P. ANDERSON MEMBER 2:

REGION:

0 AE:

58W COUNSEL:

UNASSIGNED CONST. INSP:

LOCATION:

N/A REAC. TYPE: BOP NSSS:

ANTITRUST:

RESID. INSP:

DESIGN PWR: 0000 MWT/0000 MWE CONST: N/A Rh ANALYST:

M. KING ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CLT2ENT SAF. STATUS:

Review in abeyance pending the future of standardization, N/A ER DOCKLTED:

and resources to conduct review.

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS OH DFS:

ISSUE FES:

CURRENT EHV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/15/75 12/22/75C SAR DOCKETED:

12/22/75 12/22/75C SAR Q'S RECEIVED BY PM:

11/12/76 04/04/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/14/77 05/20/77C IHPUT TO DRAFT SER TO PM:

N/S CURRENT HRG. SIATUS:

ISSUE DRAFT SER:

INPUT TO SER:

09/09/77 10/13/77C ISSUE SER:

10/19/77 12/02/77C l

l ACRS LETTER RECEIVED:

01/15/78 01/13/78C l

INPUTS TO SE SUPPLEMENT 1:

N/S ISSUE SE SUPPLEMENT 1:

N/S CURRENT ANTITRUST:

HEARING STARTED:

ASLB INITIAL DECISI0H:

COMMISSION DECISI0H:

SPECIAL PROJECT COMPLETE:

N/S LATEST AM6HDMENT:

HEW SLIPS / NOTES:

NRR LICENSTNG SYSTEM PAGE NO: 2-45 (HSS)CESSAR SYSTEM 80 FDA CURRENT STATUS REPORT REPDRT AS OF: 0 6 /16 /l,J l

KEY P E R S 0 N N E L:

PLANT C H A R A C T E R I S T I C S:

LIC. Pr.:

C. GRIMES

/sLB CHATR:

DOCKET NO:

05000470 LIC. BC:

J. MILLER MEMBER 1:

APPLICANT:

COMBUSTION ENGINEERING LIC. LA.

P.

ANDERSON MEMBER 2:

LOCATION:

N/A REGION:

0 AE:

COUNSEL:

M. WAGNER CONST. IMSP:

REAC. TYPE: PWR HSSS: COMB ANTITRUST:

RESID. INSP:

DESIGN PWR 3800 MWT/1295 MWE CONST:

RM ANALYST:

M. KING ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SER (HUREG-0852) issued 11/81.

Awaiting documentation to resolve ACRS, open, and confirmatory issues.

ER DOCKETED:

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

i l

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

f l

CURRENT Er.V. STATUS:

N/A.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/27/78 10/27/78C SAR DOCKETED:

12/21/78 12/21/79C SAR Q'S RECEIVED BY PM:

09/01/80 0 9/11/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/81 07/15/81C INPUT TO DRAFT SER TO PM:

N/S CURRENT HRG. STATUS:

ISSUE DRAFT SER:

INPUT TO SER:

11/01/81 11/13/81C N/A.

ISSUE SER:

05/01/82 11/10/81C ACRS LETTER RECEIVED:

06/21/82 12/15/81C INPUTS TO SE SUPPLEMENT 1:

07/01/82 ISSUE SE SUPPLEMENT 1 08/30/82 CURRENT ANTITRUST:

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION DFCISION:

SPECIAL PROJECT COMPLETE:

11/31/82 LATEST AMFNDMENT:

lNEWSLIPS/ NOTES:

l

HRQ LICENSING SY$ TEM PAGE NO: 2-46 (NSS)GESSAR SEVERE ACC FDA CURRENY STAVUS REPORT REPORT AS OF: 06/16/Q3 i

PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NC:

00007447 LIC. PM:

H. FAULKNER ALLB CHAIR: N/A APrLICANT:

GENERAL ELECTRIC COMPANY LIC. BC:

J. MILLER MEMBER 1 N/A LOCATIDH:

N/A LIC. LA.:

P. ANDERSON MEMBER 2:

N/A REGION:

0 AE BRAUN COUNSEL:

B. BORDENIK CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:

RESID. INSP DESIGN PWR 3579 MWT/1220 MWE CONST:

RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82: review is in progress.

Some generic issues are being identified / resolved in ER DOCKETED:

conjunction with LRG-II.

Dates shown reflect review ER SITE VISIT COMPLETE:

for the severe acciden+ desion. PRA for severe accident INPUT TO DES TO PM:

design was submitted 4,d2.

Severe accident design ISSUE DES:

j modifications were submitted 6/82 in Amendment RESPONSE TO COMMENTS ON DES:

No. 4.

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:

09/0t/82 SAR APPL. RESPONSE TO Q'S RECEIVEDe 02/01/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

ISSUE DRAFT SER:

INPUT TO SER:

02/01/84 ISSUE SER:

03/01/84 ACRS FULL COMMITTEE MEETING:

04/06/84 INPUTS TO SE SUPPLEMENT 1:

04/21/84 ISSUE SE SUPPLEMENT t OS/25/84 f t ' RENT ANTITRUST:

FDA antitrust review is in progress.

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N//

COMMISSION DECISIONr OS/00/84 SPECIAL PROJECT COMPLETE:

05/00/84 LATEST AMENDMENT:

FDA Amendment No. 4 was received in June, 1982.

NEW SLIPS / NOTES:

l l'lIj l,lllll I'

7 2

4 8 E

/

CC 6

T 2

1 A

02

/

D 88

//

5 12 O

0 L

N A

32 U

//

E F T

32 G O C

00 A

A P S A AAA

///

E T

NNN T

R A

0222 33 333 31 O

D 8888 88 888 88 P

PP

/ ///

// ///

//

1266 t2 852 00 E

R SS 3212 00 01 1 00 R

I: :NN D

A12II E

////

// ///

AA//

H H

3271 23 445

//55 C

0001 00 000 NN00 CRR EETD S

BBBSI LMMNS D

SEEOE E

AMMCR V

I E

C E

S R

G K

E Nt R NC D

S It M

T E

E OI Y

Q P

ET T

L NRSN R N

M EN*

E KERE A

E O

S E

LLED M

S T

E FO O

ME1 N

L T

ULDR E

E S

N D T

T M

O: P N

AINO T

N L:

T O

E Y

EET INM R

FMAB S O

PM N T

R BE R

ELN SOO N

T MP E

S E

S E

TPE IIC M Q S

O M

E D DN S:

TPM

CS 0 HJPB B E

CO M L

N EO R

IUE DEIT E P L

T O

I E

VP TE MSL EDCC S

I T

C M

T: IS FS:

M P

T EE T

E M : IS DEE A

R OEP RLCJ

T DSE O G NECR RTE CSU AA O

R TS L

EID: T-N OTE DFS:

S TIHR S R A

R LO STDP E

.:SY A

TV S S I

IER Y

MCALUL T

E OEEE R

TK L

OROE LTE II P

PBLERA N

KETDSF A

ACSP TDTS U S GNSL S S STN E

CT N

E C O' P FS NISA

...NIA M

OITEOE H

IDQA TETE TE I

II U

CCCUT N DSUUPU

/

L UUUU SUU RBMC Y

IIIONM O

PSSS Y PRRR PSPS RPS ALfE 1

G T

LLLCAR R RRNSES T

PAAA NSNS CHS ES0P E

I EEIIRI E

ASSS IIII AII HACS N

A V

F K

N A

I T

E S

S H

E T

C N I

E

.nw L

R si e s i R

ed v ree R U gvr 2

H ol 8

R C U

rot 9

A psc N

RE ee 1

BG nrl A

i/f e

de n

D

T ser u

S SS ii J

F Y : SN fn C

N ESO wi w s

n A

ANC eto s

i nh I

P ives e

M r

d T

O ed C

ris g

e S

E e

o v

r i

C W

gt I

I M

2na p

ec R

8iD.

n e

R T

0

/ e d i

r C

2 2b n

E E

2 0

.a s

s L

1 eIl a

T E

/

d rI s i

w 7

T ea I

C 4L W

t G

we 4

4A M

e sR r i

A 0R keLa e

o v

0E 9

cu e S"

S R

0NA R7 Soshl 5E/

'.5 Udstc U

U r

N J

I A

0GN0B3 T

iiu T

T T

N As wN A

A St Tt H

Tac T

T Us Nn S

S wi n8 S

S Ru Ee E

8 T r Mm T

3 C

E R' ro3 It Dd O 2

Oi:

PW

.I ei2 G

Ti Nn N

NHN YP FI nt V

R AO: T A

ece N

R Nt Ee /

1 A

T TCIH N

SR g nh E

H An f

m S

S EITD

.G A

ut a

AA P

S N

KLAICI TSej T

T T

I E

CPCGAS NSmnr N

N NA TA L

G A

OPOEEE EEooo E

E ED SD S

)

DALRRD RGScf R

R RF EF S

L R

R R

R T

W S

U U

U U

A E

H P

C C

C C

L N

(

l ll l

llll1l

NRR LICENSING SVSVEM PAGE NO: 2-48 (SP)FNP 1-8 (MANUF.)

SPC CURRENT STATUS REP 0RT REPORT AS OF 06/16/82 PLANT C H A R A C T E R I 5 T I C 5:

KEY P E R S O N N E L:

DOCKET NO:

35000437 LIC. PM:

. UNESSIGNED ASL3 CHAIR S. WOLFE' APPLICANT:

OFFSHORE POWER SYSTEMS LIC. MCs E. ADENSAM MEMBER 1:

D. SCHINK LOCATION:

JACKSONVILLE, FLA.

LIC. LA.:

M.

DUNCAN MEMBER 2:

G. BRIGHT REGION:

2 AE:

OPS COUNSEL:

D. GODDARD CONST. INSP:

REAC. TYPE: PWR HSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP DESIGN PWR*

3411 MWT/1150 MWE CONST: OPS RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE ML matters have been addressed by applicant. SSER 4, covering TMI requirements and other previous unresolved ER DOCKETED:

07/05/73 07/05/73C issues, was issued 09-29-81.

An ACRS subcommittee ER SITE VISIT COMPLETE:

08/16/73 08/16/73C meeting was held on 10-15-81.

The ACRS sent a favorable INPUT TO DES TO PM:

07/01/74C letter on 10-19-81 ISSUE DES:

04/12/74 07/24/74C RESPONSE TO COMMENTS ON DES:

ISSUE FES:

10/06/75 10/06/75C j

CURRENT ENV. STATUS:

All environmental statements have been issued.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

05/07/73 05/07/73C SAR DOCKETED:

07/05/73 07/05/73C SAR Q'S RECEIVED BY PM:

02/15/74 02/15/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 04/08/74 04/08/74C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/25/75 07/25/75C Suppl. 4 to the SER was entered into the record on 12-4-81 ISSUE DRAFT SER:

Hearing reopened and closed on 12-4-81.

Licensing INPUT TO SER:

08/22/75 08/22/75C Board is reviewing the record.

ISSUE SER:

09/30/75 09/30/75C ACRS LETTER RECEIVED:

10/19/81 10/19/81C INPUTS TO SE SUPPLEMENT 4:

02/20/76 03/05/76C ISSUE SE SUPPLEMENT 4:

09/00/81 09/29/81C CURREHT ANTITRUST:

HEARING STARTED:

06/17/76 06e15/76C ASLB INITIAL DECISION:

06/00/82 COMMISSION DECISION:

08/00/82 SPECIAL PROJECT COMPLETE:

C?/00/82 i

LATEST AMENDMENT:

NEW SLIPS /HOTES:

HRR LICENSING SYSTEM PAGE NO: 2-40 BLUE HILLS SITE E$R CURRENT ST ATUS REPORT REPORT AS OF: 06/16/82 KEY P E R S 0 N N E L:

PLANT C H A R A C T E R I S T I C S:

LIC. PM:

J. WILSON ASLB CHAIR:

M. MILLER DOCKET HO:

05007510 APPLICANT:

GULF STATES UTILITIES LIC. BC:

J. MILLER MEMBER 1:

L. KORNBLITH LOCATION:

HEWTON COUNTY, TEXAS LIC. LA.

P.

ANDERSON MEMBER 2:

L.

LITTLE REGION:

4 AE:

BECH COUNSEL:

C. WOODHEAD CONST. INSP:

REAC. TYPE: PWR HSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP:

DESIGH PWR: 0000 MWT/00C3 MWE CONST:

RM ANALYST:

L. LANIER ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

ER DOCKETED:

08/26/76 08/26/76C ER SITE VISIT COMPLETE:

09/03/76 09/03/76C INPUT TO DES TO PM:

02/25/77 02/25/77C ISSUE DES:

03/2t/77 06/02/77C RESPONSE TO COMMENTS ON DES:

08/23/77 05/05/78C ISSUE FES:

1?/14/77 07/17/78C CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/28/74 CL/28/74C SAR DOCKETED:

08/23/74 08/23/74C S AR O'S RECEIVED BY Pf**

01/31/75 02/13/75C SAR APPL. RESPONSE TO Q's RECEIVED: 07/21/75 07/21/75C IHPUT TO DRAFT SER TO PM:

11/20/75 11/29/75C CURRENT HRG. STATUS:

On 04/28/81 the ASLB issued a Partial Initial Decision ISSUE DRAFT SER:

approving Blue Hills site as suitable for location of INPUT TO SER:

08/06/76 10/04/76C ISSUE SER:

03/07/77 01/07/77C a nuclear power plant.

ACRS LETTER RECEIVED:

04/15/77 03/16/77C INPUTS TO SE SUPPLEMENT 1:

05/06/77 05/06/77C ISSUE SE SUPPLEMENT 1:

05/27/77 06/23/77C CURRENT ANTITRUST:

HEARING STARTED:

04/05/79 04/05/79C Complete ASLB INITIAL DECISI0H:

04/28/81C SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

HEW SLIPS / NOTES:

N2Q LICENSIHG SYSVEM PAGE NO: 2-50 CARROLL SITE ESR CURRENT STATU$

R EI ORT REPORT AS OF: 06/16/82 PLANT CHARACTER I S T I C S:

KEY PERS0NNEL:

DOCKET NO:

05000599 LIC. PM:

J. WILSON ASLB CHAIR:

J. WOLF APPLICANT:

COMMONWEALTH EDISON LIC. BC:

J. MILLER MEMBER 1:

G.

BRIGHT LOCATION:

CARROLL COUNTY, IL.

LIC. LA.:

P.

ANDERSON MEV3ER 2:

R. HOLTON REGION:

3 AEr COUNSEL:

R.

LESSY C0hsT. INSP:

REAC. TYPE:

NSSS: WEST ANTITRUST:

A.

HODGDON RESID. INSP:

DESIGN PWR 0000 MWT/1120 MWE CONST:

RM ANALYST:

D.

SCHW8RZ CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The commercial operation date has been postponed until 1999 - 2000.

This license ER DOCKETED:

04/07/79 04/07/79C is not under active review.

ER SITE VISIT COMPLETE:

N/S INPUT TO DES TO PM:

N/S ISSUE DES:

N/S RESPONSE TO COMMENTS ON DES:

N/S ISSUE FES:

N/S CURRENT ENV. STATUS:

Portions of the alternate site study are under review by DOE.

SAFETY / HEARING MILEPTONES:

APPLICATION TENDERED:

12/20/78 12/20/78C SAR LOCKETED:

SAR Q'S RECEIVED BY PMt SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Five intervenors have been admitted.

ISSUE DRAFT SER:

INPUT TO SER:

ISSUE SER:

ACRS FULL COMMITTEE MEETING:

INPUTS TO SE SUPPLEMENT :

ISSUE SE SUPPLEMENT :

CURRENT ANTITRUST:

Awaiting updated Antitrust information from applicant.

HEARINC STARTED:

N/S ASLB INITIAL DECISION:

N/S SPECIAL PROJECT COMPLETE:

N/S LATEST AMENDMENT:

NEW SLIPS / NOTES:

NRR L ICENSING SYSTEM AS OF 06/16/82 NON-P0WER REACT 0RS INPUT ISSUE EARLIEST ISSUE 5 TO SER ISSUE FES OR START ISSUE NON-P3WER FACILITY DOCKET RE1 IQ_ td 118 EIA HEARING QE COMMENTS AFRRI, TRIGA 1000.0000W TANK ESTIMATED DATE: 10/80 N/A 01/82 N/S 09/81 N/S CONTESTED CASE ACTUAL DATE:

10/80C NBSR 10.0000W T ESTIMATED DATE: 12/80 02/82 09/82 07/82 10/82 POWER INCREASE TO 20 MW ACTUAL DATE:

12/80C 02/82C INCLUDED IN RENEWAL TEXAS A8M, TRIGA 1000.0000W POOL ESTIMATED DATE: 07/79 N/A 09/82 N/S 10/82 ACTUAL DATE:

07/79C U.

OF FLA., ARG0HAUT 100.0000W GRAPH ESTIMATED DATE: 01/81 N/A 06/82 N/S N/A 07/82 ACTUAL DATE:

01/81C 06/82C U.

OF VA.

2000.0000W POOL ESTIMATED DATE: 03/77 N/A 08/82 08/82 N/A 08/82 ACTUAL DATE:

03/77C WORCHESTER POLY TECH 10.0000W ESTIMATED DATE: 07/79 N/A 07/82 N/S N/A 08/82 ACTUAL DATE:

07/79C

  • FOR TEST REACTORS ONLY i

H H

Z O

N H

U Lu th

NRR LICEN$ING SY STEM PAGE HO: 2-0L CURRENT STA'U5 REPORT REPORT AS OF:

PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNELa DOCKET HO:

Docket No. or Project No.,if not docketed LIC. PM:

Licensing Project Manager ASL B CH AIR: ASLB Chairman APPLICANT:

Utahty '

LIC. BC:

Licensing Branch Chief MEMBER'1:

on panei LOCAT10H:

Miles and direction from nearest major town LIC.

LA.-

Licensing Assistant MEMBER 2:

on panel REGION:

1 through S AE:

A chite-:'Fnaineer COUNSEL:

Attorney assigned to case CONS T. INSP i Construction inspector REAC. TYPE:

PWR, BWR, HTGR or LMFBR HSSS: Nuclear Ste.... L ' stems Supplier ANTITRUST:

Antitrust Attorney RESID. INSP: Resident inspector DESIGN PWR: Megawatts electric & thermal CONST: Constructor hP A AN ALYST : MPA analyst assigned.o track project ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRFNT %AF. STATUS:

Safety status for this reporting period only. It consists of accomplishments tnd schedul*

ER DOCKETED:

Environmental Report changes occurring since the last issue of Blue Book. Outstanding issues and late input from b

review branches should be indicated, along with indication of the critical path.

Pu O

T Project Manager ISSUE DES:

Draft Environmental Statement RESPONSE TO COMMENTS ON DES:

ISSUE FES:

Final Environmental Statement l

CURRENT ENV. ST4TUS*

Environmental status for this reporting period only. It consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outstanding issues and late SAFETY / HEARING MILESTONES:

l J

l input from review branches slould be indicated.

APPLICATION TENDERED:

l SAR DOCKETED:

Safety Analysis Report l

SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

l INPUT TO DRAFT SER TO PM:

l CURRENT HRG. STATUS:

ISSUE DRAFT SER:

Safety Evaluation Report Changes in the hearing dates since the last issue of Blue Book. Changes in intervention and INPUT TO SER:

contentions should be indicated.

ISSUE SER:

ACRS LETTER RECEIVED:

Advisory Committee INPUTS TO SE SUPPLEMENT 3:

on Reactor Safeguards ISSUE SE SUPPLEMENT 3:

FEMA LETTER RECEIVED:

Safety Evaluation Supplement CURRENT ANTITRUST:

HEARING $ TARTED:

Changes in the antitrust status since the last issue of Blue Book.

ASLB INITIAL DECISION:

Atomic Safety & Licensing tsoaro ASLB FINAL DECISIGHz TECH SPECS COMPLETED:

COMMISSION DECISION:

ISSUE PARTIAL POWER LICENSE:

ISSUE FULL POWER LICENSE:

LATEST AMENDMFNT:

The latest amendment submitted by the applicant.

SCHED. DATE RECEIPT DATE CONSTRUCTIDH COMPLETIDH - APPL.

gPj,c

" "p NSW SLIPS /NOTF%:

t f notice n

Slips or potential problems that should be brought to management's attention.

construction in construction completion completion

U E R (A ured h ODC) f,",y[ m 335 U.S NUCLE AR RFGUL ATORY COMMISSION BIBLIOGRAPHIC DATA SHEET NUREG-0530 Vol. 11 No. 6

4. 7IT LE AN D SU8iITLE (Add Volume No.. of wpropnate)
2. (Leave blankl Regulatory Licensing Status Summary Report
3. RECIPIENT'S ACCESSION NO.

ggg

5. DATE R'iPORT COMPLE TED
7. AUTHORIS) l YEAR MONTH

,1n1y i oM 9 PERF ORMING ORGANIZATION NAME AND MAILING ADDRESS (Include Zip Codel DATE REPORT ISSUED lvEAR Office of Resource Management uONTH Management Information Branch July 1982 U. S. Nuclear Regulatory Commission 6 (tes e diaa*>

Washington, D. C.

20555 8 (Leave Nank)

12. SPONSORING ORGANIZATION N AME AND M AILING ADDRESS (Include 2<p Codel TW Office of Resource Management Management Information Branch
11. CONTRACT NO.

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 PE RIOD COVE RE O //nclus ve dates /

13. TYPE OF REPORT May 16, 1982 - June 16, 1982 14 - (L ' "' l
15. SUPPLEMEN TARY NOTE S
16. ABSTR ACT (200 words or less)

Provide a review of the status of the progress of the licensing reviews for all construction permits, operating license, special project and non-power reactor renewals under review, as reported to Congress.

17. KE Y WOR DS AND DOCUME NT AN ALYSIS 17a DE SC hip TORS 17n IDEN TIF IE RS. OPE N EN DE D TE RMS 18 AV AIL ABILITY ST ATE ME N T 19 SE CURIT Y CLASS iTe s eport) 21 %O OF P/ GE S Unclassified Unlimited 20 gCgRggcj.gSgTe. spas)

?! I'HICE e U.s. covtarou.NT PRINTING OFFICE: 1982- 0-361-302/40

UNITED STATES

..est ciass wait Pos1&M & H H Paid NUCLEAR REGULATORY COMMISSION usm at WASHINGTON D.C. 20%5 ansa a c etawirm. A tt OFFICIAL BUSINESS Pf N Alf Y FOR PRIVATE USE. $330 l

l

'd R (i v

  • i

'4 -

l

- ).)

l

<;vlt I t y

^'!

F r g ;y I

i P,js A v f( [u,', ' ', I I l ' * I f l. 3 - y q ".

1,

( :' p y i

1A

.)

a A W11 'is, [ 4 ;,

bL g ') h *, 6) 1 1

t

_