OPERATING DATA REPORT DOCKET NO. 050-010 DATE June 1, 1982 COM'PLETED BY B. A. Schroeder TELEPHONE (815) 942-2920 OPERATING STATUS NOTES 1.

Unit Name: Dresden I 2.

Reporting Period: May, 1982 3

Licensed Thermal Power (MWt):

700 4.

Nameplate Rating (Gross MWe):

209 5

Design Electrical Rating (Net MWe): 200 6.

Maximum Dependable Capacity (Gross MWe): 205 7

Maximum Dependable Capacity (Net MWe):

197 8.

If Changes Occur in Capacity Ratings (items 3 Through 7) Since Last Report, Give Reasons:

N/A 9

Power Level to Which Restricted, if Any (Net MWe): N/A 10.

Reasons For Restrictions, if Any: N/A This Month Yr-to-Date Cumulative 11.

Hours in Reporting Period 12.

Number of Hours Reactor Was Critical 13 Reactor Reserve Shutdown Hours 14.

Hours Generator On-Line 15 Unit Reserve Shutdown Hours 16.

Gross Thermal Energy Generated (MWH) y -

~

-=<

l 17 Gross Electrical Energy Generated (MWH)

[* A I_,,

18.

Net Electrical Energy Generated (MWH)

V' O J.'- ~ C A -

O.

N 19 Unit Service Factor 20.

Uni t Availability Factor pg l--

p i

21.

Unit Capaci ty Factor (Using MDC Net)

UU V

7.

22.

Unit Capacity Factor (Using DER Net) 23 Unit Forced Outage Rate 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25 If Shut Down At End Of Report Period, Estimated Date of Startup: Extended Modification Outage - Shutdown Until June, 1986 C

l E206150313 R20601 PDR ADOCK 05000010 R

pop

OPERATING DATA REPORT DOCKET NO. 050-237 DATE June 1. 1982 COMPLETED By B. A. Schroeder TELEPHONE (815) 942-2920 OPERATING STATUS NOTES 1.

Unit Name:

Dresden II 2.

Reporting Period:

May, 1982 3

Licensed Thermal Power (MWt):

2.527 4.

Nameplate Rating (Gross MWe):

828 5

Design Electrical Rating (Net MWe): 794 6.

Maximum Dependable Capacity (Gross MWe):

812 7

Maximum Dependable Capacity (Net MWe):

772 8.

If Changes Occur in Capacity Ratings (items 3 Through 7) Since Last Report, Give Reasons:

N/A 9

Power Level to Which Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions, if Any: N/A l

This Month Yr-to-Date Cumu.lative 11.

Hours in Reporting Period 744.0 3623.0 105623.0 12.

Number of Hours Reactor Was Critical 61R_21 3507.6 J 142.83 13 Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.

Hours Generator On-Line 617.4 3482.8 78207.17 15 Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWH) 1248685.0 8156928.0 156715089.0 17 Gross Electrical Energy Generated (MWH) 396545.0 2649811.0 50133123.0 18.

Net Electrical Energy Generated.(MWH) 375378.0 2525942.0 47402832.0 19 Unit Service Factor 82.98 96.13 74.04 20.

Un i t Ava i l abil i ty Facto r 82.98 96.13 74.04 21.

Unit Capacity Factor (Using MDC Net) 65.35 90.31 58.13 22.

Unit Capacity Factor (Using DER Net) 63.54 87.81 56.52 23 Unit Forced Outage Rate 2,93 0.92 11.77 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

M /A 25 If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

4 OPERATING DATA REPORT DOCKET NO.

050-249 DATE June 1,1982 COMPLETED BY B. A. Schroeder TELEPHONE en3g 947_797n j

--.. OPERATING STATUS. -.

NOTES I.

Unit Name:

Dresden III 2.

Reporting Period: May. los?

3 Licensed Thermal Power (MWt):

2,527 4.

Nameplate Rating (Gross MWe):

R2R 5.

Design Electrical Rating (Net MWe): 794 6.

Maximum Dependable Capacity (Gross MWe): 812 7

Maximum Dependable Capacity (Net MWe):

773 8.

If Changes Occur in Capacity Ratings (items 3 Through 7) Since Last Report, Give Reasons:

N/A 9

Power Level to Which Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions, if Any:

N/A This Month Yr-to-Date Cumulative II.

Hours in Reporting Period 744 7623 95208 12.

Number of Hours Reactor Was Critical 691.1 733.9 71382.4 13 Reactor Reserve Shutdown Hours 0.

0.0 0.0 14.

Hour.< Generat'or On-Line 609.2 646.7 68539.2 15 Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.

Gross Therma'l Energy Generated (MWH) 1052413.0 1110237.0 134722226.0

17. ~ Gross Electrical Energy Generated (MWH) 344460.0 359059.0 43822165.0 18.

Net Electrical Energy Generated.(MWH) 324735.0 324681.0 41519443.0 19 Unit Service Factor 81.9 17.8 72.0

, 20.

Unit Availability Factor 81.9 17.8 72.0 l

21.

Unit Capacity Factor (Using MDC Net) 56.5 11.6 56.4 22.

Unit Capacity Factor (Using DER Net) 55.0 11.3 54.9

~

~

23

' unit Forced Outage Rate 7.7 7.3 14.1 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25 If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A l

l

AVERAGE DAILY UNIT POWER LEVEL g

DOCKET NO.

050-010 i

UNIT I DATE Jur. 1. 1on?

r COMPLETED BY B. ' Al Schroed TELEPHONE (815) 942-2920 t

MONTH May, 1982 f

/

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NWe-Net)

(MWe-Net)

/

1 o

17 0

L

\\

j 2

0 18 0

3 0

19 0

g 4

0 20 0

5 0

21 0

6-0 22 0

i' l

7 0

23 0

8 0

24 0

9 0

25 0

j 10 0

26 0

0 4

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 15 0

3, 0

16 0

6 O

7 _..-. - - - _ _ _ _ - -. - _ _

-~

AVERAGE DAILY UNIT' POWER LEVEL f

DOCKET N0. 050-237 UNIT II DATE June 1,1982 COMPLETED BY B. A. Schroeder i

TELEPHONE raim ea2-202n i

MONTH May, 1982 i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 771 17 662 lt i

2 636 18 663 l

3 766 19 663 i

4 778 20 667 l

5 783 21 651

!s 6

784 22 667 l

7 458 23 670 l

8 641 24 667 681 g

25 661 10 653-26 666 6

11 27 662 0

12 28 554 8

13 0

29 443 14 173 3o 430 535 15 31 596 16'

.w,-.

.--+-,........,w_,

--_-rm..--,

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-249 UNIT III DATE June 1,1982 COMPLETED BY B. A. Schroeder TELEPHONE (815) 942-2920 MONTH May, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)

(MWe-Net)

I o

17 s02 2

o 18 565 3

0 19 632 4

149 20 630 5

139 21 733 6

150 22 638 7

424 23 693 l

8 194 24 785 9

0 25 772 10 264 26 786 11 308 27 790 473 12 28 791 512 13 29 781 14 523 30 745 15 204 31 773 16 473

\\

o

DOCKET NO. 050-010 UNIT NAME Dresden I UNIT SHUTDOWNS AND POWER REDUCTIONS DATE ai m i ion 9 COMPLETED BY B. A Orewbr TELEPHONE f815) 942-2920 REPORT MONTH MAY, 1982

{

METHOD OF LICENSEE CAUSE & CORRECTIVE NO.

DATE TYPEI DURATION REASON 2 SHUTTING EVENT SYSTEM COMPONENT ACTION TO (HOURS)

DOWN REACTOR 3 REPORT i CODE 4 CODE 5 PREVENT RECURRENCE 8

78-10-31 5

744 C

3 Refueling, turbine overhaul, and chemical cleaning outage.

I 2

l 1

2 3

4 F: Forced Reason:

Method:

Exhibit G-Instructions for S: Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data B-Maintenance of Test 2-Manual Scrca Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (

) File

]

D-Regulatory Restriction 4-Other (Explain)

(NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error H-Other (Explain)

DOCKET NO.

050-237 UNIT NAME Dresdan II UNIT SHUTDOWNS AND POWER REDUCTIONS DATE June 1, 1982 COMPLETED BY B.A. Schra

  • r TELEPHONE (815) 942-2920 REPORT MONTH May. 1982 METHOD OF LICENSEE CAUSE & CORRECTIVE NO.

DATE TYPEI DURATION REASON 2 SHUTTING EVENT SYSTEM COMPONENT ACTION TO (HOURS)

DOWN REACTOR 3 REPORT #

CODE 4 CODES PREVENT RECURRENCE 2

82-05-06 F

18:39 H

3 Cbntractor Error Cbntractor (Bechtel) opened cubical for pot fuses on Bus-23-1.

GE/CIOD has required that the 3

82-05-11 S

84:19 B

1 necessary equipnent be instal-led to conduct a chemistry test injecting H into Reactor.

2 Change oil in Recire. ptrps.

4 82-05-29 S

23:38 B

2 I

2 3

4 F:

Forced Reason:

Method:

Exhibit G-Instructions for S:

Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (

) File D-Regulatory Restriction 4-Other (Explain)

(NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error H-Other (Explain)

DOCKET NO.

050-249 UNIT NAME Dresden III UNIT SHUTDOWNS AND POWER REDUCTIONS DATE June 1, 1982 COMPLETED BY B

A_ %rer TELEPHONE rel9 942-2920 REPORT MONTH May, 1982 METHOD OF LICENSEE CAUSE & CORRECTIVE NO.

DATE TYPEI DURATION REASON 2 SHUTTING EVENT SYSTEM COMPONENT ACTION TO (HOURS)

DOWN REACTOR 3 REPORT f CODE 4 CODES PREVENT RECURRENCE 1

820102 S

84:15 C

Post refueling scr5nV' start-up testing.

2 820508 F

40:27 A

3 Trip of turbine while testing turbine trip system. DiC Failure._

L.P. Feedwater heater control 3

820515 F

10:07 A

1 problems. Calibrate and adjusted control valves.

1 l

l l

l l

1 1

1 2

3 4

l F:

Forced Reason:

Method:

Exhibit G-Instructions for l

S:

Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data l

l B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee l

C-Refueling 3-Automatic Scram Event Report (

) File l

D-Regulatory Restriction 4-Other (Explain)

, (NUREG-0161) l E-Operator Training & License Examination i

F-Administrative G-Operational Error l

H-Other (Explain) l

N 0

1 T

C d

A n

E' a.

V el I

vi T

l o C

ac E

v R

d R

te O

l c C

ia ul bp e

ee Rr TL U

A S

/

E N

R N

O I

TC N

2 U

8 F

9 L

1 AM Y

E A

S M

U A

A

/

C N

1 E

T C

I l

l N

A U

N E

N T

E N

D I

S A

E M

R E

D D

G E

A T

T A

UR L

OE E

B R

RM OU Y

N T

R E

E F

L A

S 6

4 4

90 E

FC R.

ONA EN W

RE UT e

Tl v

f AI i

NA t

M never P

tn e

T yVc N

nh E

et M

gr P

ro I

U eN Q

m.

E E

d l no UC

e t

I 1

DRESDEN UNIT 2 l

l SAFETY RELATED HAINTENANCE - t%Y,1982 NATURE OF LER OR OUTAGE HALFUNCTION CAUSE RESULT CORRECTIVCFACTION EQUIPMENT.

MAINTENANCE NUMBER D-2 HPCI Main Preventive W.R. #15666 N/A N/A Area was ground and Steam Line blended.

D-2 IfPCI Main Preventive W.R. #15667 N/A N/A Grounded out indica-Steam Line tions, blended U-2 to establish wall thick-ness.

Scram Disch Vol.

Preventive W.R. #17973 N/A N/A Corrected tubing run Invel Switch and checked L.S.

operation via DIS 500-5.

Time Delay Relay Preventive W.R. #18422 N/A N/A Adjusted time delay for 45% Scram on relay.

Bypass

  1. 2 Diesel Gen.

Preventive W.R. #19316 N/A N/A Cmpleted inspection per' ENP 6600-6.

U-2 "A" SBIC Preventive W.R. #19379 N/A N/A Adjust packing with Pump pump running.

2B SBIC Pump Preventive W.R. #19309 N/A N/A Adjust packing with pump running.

Ch. "A" Refueling Preventive W.R. #19499 N/A N/A Relocated and added Floor Ili Range extension cable camp.

IARM DIS 1700-7.

I

! Accumulator Preventive W.R. #19793 N/A N/A Replaced pressure t #38-03 Iow Press.

switch camp. DIS

' SW 300-2 for 38-03.

l f

DRESDEN UNIT 2 I

3 SAFETY RELATED tiAINTENANCE - MAY,1982 t

4 NATURE OF LER OR OUTAGE HALFUNCTION-CAUSE RESULT CORRECTIVEFACTION EQUIPMENT.

itAlllTENANCE NUtiBER 2B LPCI Ileat Preventive W.R. #19909 N/A N/A Inspected Sample Valve.

Exchanger IIPCI Lube Oil Preventive W.R. #20037 N/A N/A Remove Filter'for Filters cleaning and replaced.

Refuel Grapple Preventive W.R. #19842 N/A N/A

' Reinstalled track switches and hooked-up to normal power supply.

DW Vent Valve Preventive W.R. #19725 N/A N/A Found versa valve to SBGP System be froze up.

Repaired with new one fran stock.

2-202-9A Valve Preventive W.R. #19545 N/A N/A Backseated 2-202-9A valve. Brought motor amps from.5 to 2.9 ampc.

Refuel Platform Preventive W.R. #19172 N/A N/A Cleaned control switch.

IIPCI 125V DC Preventive W.R. #18049 N/A N/A Transfer wires EE F5 &

Control Power F6 to EE F3 & F4.

IIPCI 2-2301-8 Preventive W.R. #20040 N/A N/A Cleaned contacts 1 and Valve 1C on limit switch.

ll, Electromatic Preventive W.R. #17954 N/A N/A Inspected wiring, found

' Relief Valve ok.

Installed tie wraps to keep the wires in the clear.

i l

' I, 1

J DRESDEN UNIT 2 SAFETY RELATED MAINTENAf4CE - MAY,1982 t

NATURE OF LER OR OUTAGE HALFullCTION-CAUSE RESULT CORRECTIVE ACTION EQUIPMENT MAlllTENANCE NUMBER Control Rod Preventive W.R. #18848 N/A N/A Replaced rod select D-4 Select Push switch.

Bottom

'Ibrus Drywell Preventive W.R. #18839 N/A N/A Checked limit switch-Vacuum Bk-32D operated 32D 6 times, picked up loss of light and alarm each time and when reset, picked-up light and lost alarm. No appa-rent trouble with switch.

U-2 Safety Preventive W.R. #2.0554 N/A N/A

~ Replaced rupture disc.

Old one was blown.

Valves U-2 Safety Preventive W.R. #20555 N/A N/A Replaced ruptune disc.

Valves Old one was blown.

Refuel Platform Preventive W.R. #19826 N/A N/A Checked and found ok.

  1. 2 Diesel Gene-Preventive W.R. #17657 N/A N/A Performed electrical l

rator inspection per DMP l

6600-8 DMP 6600-7 and I

6600-6, DMP 6700-3, 29 6700-4 (part of DMT 6600-8) R1P 6600-2.

I,j "B" Electromatic Preventive W.R. #17952 N/A N/A Inspected wiring, l

Relief Valve found ok.

Installed i

tie wraps to keep the

jl wires in the clear.

I'i

f 1

DRESDEN UNIT 2 SAFETY RELATED MAINTENA!1CE - MAY,1982 NATURE OF LER OR OUTAGE MALFUNCTION CAUSE RESULT CORRECTIVE'" ACTION EQUIPMENT MAltlTENANCE NUMBER "E" Electro-Preventive W.R. #17953

'N/A N/A Inspected wiring, found ok.

Installed matic Relief' tie wraps to keep the Valve wires in clear.

D-2 DG Cooling Preventive W.R. #16628 N/A N/A Removed starter.

H O PP

' Changed from manual 2

reset to auto reset by repositioning spring arm on oil relay.

"D" Electro-Preventive W.R. #17951 N/A N/A Inspected wiring, matic relief found ok.

Installed valve tie wraps to keep the wires in the clear.

i B

DRESDEN UNIT 3 SAFETY RELATED MANTENANCE-MAY,1982 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION IOI3-220-44 Preventive W.R. #18971 N/A N/A Removed conduit for P & G so supports can be welded.

Relocated conduit and ran H.C. type sealtile to new wire for 3-202-44 valve coil.

D/W Equipnent Preventive W.R. #06295 N/A N/A Removed cover.

Hitch Main Steam Preventive W.R. #13873 N/A N/A Tightened packing and lubricated the stem.

Valve Drain

/-

D/W Equipment Preventive W.R. #13915 N/A N/A Closed D/W equipnent Hatch hatch.

Torus /DN Vac.

Preventive W.R. #13924 N/A N/A Inspected vacuum breakers Breakers results in prbpedure.

Torus /DN Vac.

Preventive W.R. #13936 N/A N/A Performed lift force test Breakers results in procedure.

Tested and adjusted elec-trically 4-22-82.

D-3 "D" CCSW Preventive W.R. #16326 N/A N/A Rebuilt pump with new i

Pump bearings, seals, packing, stuffing box backing rings.

I)-3 "A" CCSW Preventive W.R. #16328 N/A N/A Disassembled, replaced Pump packing, packing backing rings, seats. - Re-assem-bled.

I DRESDEN UNIT 3 J

SAFETY RELATED MANTENANCE - MAY,1982 NATURE OF LER OR OUTAGE HALFUNCTION EQUIPliENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION D-3 "B" CCSW Preventive W.R. #16329 N/A N/A Rebuilt pump with new l

bearings, seals, packing, Pump stuffing box packing rings. l D-3 "S" OCSW Preventive W.R. #16330 N/A N/A Replaced bearings, packing, stuffing box packing ring.

Pump i

Electrcuatic Preventive W.R. #16401 N/A N/A All blanks installed 1/6/82, 52 m/hr. All Relief Valves blanks removed 4/15/82, and Pilot 32 m/hr.

Valves 10% Functional Preventive W.R. #16441 N/A N/A Removed snubber #3 (Iso.,.

cand.) and snubber #8 Test of S.R.

Hydraulic (torus ring header). Bench tested #3 (Grinnell'2 x Snubber 5") per functional test check of DMP 1600-10 Rev, p.

Bench

  • tested 98 (Bergen-Patterson 2h x 6")

per functional test of EMP 1600-2 Rev. p.

Cil level good in Grinncil. Added oil to proper level in Bergen-Patterson. 'Ihere was a loose fitting (oil addition fitting) on Bergen-Patterson. Both l

snubbers operated smoothly.

l Re-installed both snubbers

  1. 3 and #8 after camp. of testing.

l DRESDEN UNIT 3 SAFETY RELATED MANTENANCE - MAY,1982 NATURE OF LER OR OUTAGE MALFUNCTION EQUlPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Torus Drywell Preventive W.R. #17604 N/A N/A Removed covers and disc as Vac. Breaker requested 1-3-82.

Installed covers with new o-rings after inspecting valve seats and disc.

Outside Seal on Preventive W.R. #17886 N/A N/A Inspected seal, greased Vacuum Breaker and checked out. Ok.

U-3 HPCl 2301-7 Preventive W.R..#17926 N/A N/A Replaced solenoid.

A.O.V.

ID-3-1501-27B Preventive W.R. #18411 N/A N/A Adjust packing.

U-3 A.O.V.

Preventive W.R. #18991 N/A N/A Installed new switch, 1402-9A replaced damaged sealtite and rewired.

Torus liatches Preventive W.R. #19355 N/A N/A Inspect hatch y O-rings, found ok. Closed and bolted-down hatch covers.

Torus liatch Preventive W.R. #19356 N/A N/A Opened hatch and then closed it.

D/W Eqtiipnent Preventive W.R. #13359 N/A N/A Removed covers for ILRT and Floor Drain 4/23/82. Put covers on 4/26/82.

ILRT Air Supply Preventive W.R. #19628 N/A N/A Pemoved existing flange and Flange installed gooserieck.

Re-moved gooseneck and installed flange.

I DRESDEN UNIT 3 l

SAFETY RELATED tiANTENANCE - MAY,1982 l

NATURE OF LER OR OUTAGE tiALFUNCTION EQUIPriENT tiAINTENANCE NUtiBER CAUSE RESULT CORRECTIVE ACTION D-3 Reactor Preventive W.R. #19836 N/A N/A Checked cal. and installed ASME Ilydro gauge. When the hydro was cmpleted the gauge was removed and calibration was checked.

ACC 50-27 Scram Preventive W.R. #19904 N/A N/A Installed two 500 F55 kits. '

Pilot Solenoid (D-3LPCIIlanger Preventive W.R. #19926 N/A N/A Removed turn buckle and

~

repaired bent rod, straightened and rein-stalled.

AO-2301-7 Preventive W.R. #19936 N/A N/A Replaced small air litne off ASCO Solenoid '

!l Safety Valve Preventive W.R. #19941 N/A N/A Re-tightened Itgin flange 3-203-4B bolts using slugging wrench and sludge hamer.

When slugged nuts turned 2 flats equal to about 1/4" on all nuts.

Core Spray Preventive W.R. 19936 N/A N/A Tightened 4 turns on Manual 1402-6B packing nuts 3/4" left on packing follower. Also lubed stem.

3-220-5 & 6 Preventive W.R. #19949 N/A N/A Repacked with grafoil and Va3ves 1625 G.F.

Each' valve took 3 rings of grafoil and 7.

rings of 1625 G.F.

Packing was hard. Icosened packing with liquid wrench and removed packing.

l DRESDEN UNIT 3 SAFETY RELATED MANTENANCE-o'AY,1982 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Recirc. IIeader Preventive W.R. #19959 N/A N/A Adjusted packing to reduce bO202-6A leakage.

Recirc. lieader Preventive W.R. #19960 N/A N/A Adjusted packing to reduce F0202-6B leakage.

Safety Valve Preventive W.R. #19961 N/A N/A Removed blown diaphgram.

3-203-4F Replaced with new one,

  1. 580A30.

Safety Valve Preventive W.R. #19962 N/A N/A Replaced with new diaph-Removed blown diaphgram.

3-203-411 gram, #580A30.

Inst. Line Preventive W.R. #19967 N/A N/A Removed flow check below Excess Flow M.L.P.N. field groove and Check Vlv.

brought flow to 900 M.L.P.M.

APIS 3-261-34B Preventiva W.R. #19974 N/A N/A Installed new handle and Ili lleader 3/8" lock nut.

Main Steam Line Preventive W.R. #19978 N/A N/A Installed valve handle -

DPIS 261-3D 568771 (boke " viv.)

PS 3-504 Back-Preventive W.R. #19979 N/A N/A Replaced w/ handle fill Valve IIancock valve.

D-3 S/D Cooling Preventive W.R. #19983 N/A N/A Jacked-up shutdown line to Support unload spring.. Cut-off bracket extending down frcan pipe approx. 1".

Welded plate onto bracket set spring adjustment to 4200 lbs.

I DRESDEN UNIT 3 SAFETY RELATED MANTENANCE - MAY,1982 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION D-3 Clean-Up Preventive W.R. #19984 N/A N/A Adjusted spring can to Line Support 1080 lbs.

Drywell to Torut Preventive W.R. #20009 N/A N/A Icosened-up on disc nut Vac Breakers so disc wouldn't bind up.

Drywell to Torur Preventive W.R. #20010 N/A N/A Opened both E_& F vac.

Vac. Breakers breakers. Adjusted and corrected reassembled valves.

Shutdown Scram Preventive W.R. #20014 N/A N/A Corrected wiring of relays Reset Interlock 580-115A and ll6A, ll5Bf Relays and ll6B.

DOCS Iogic Preventive W.R. #20019 N/A N/A Installed jumpers an'd (for ILRT) blocked relays. Removed jumpers and bl,ocks from relays.

D/W llead Vent Preventive W.R. #20014 N/A N/A Changed out diaphgram and Valve turned over to shift for stroke test.

Steam Trap Preventive W.R. #20046 N/A N/A Cancelled.

3-2301-1 Drywell Equip-Preventive W.R. #20078 N/A N/A Installed new O-rings ment IIatch and bolted-up hatch.

Inst. Line Preventive W.R. #20092 N/A N/A Removed. Tested to 1500

. Excess Flow M.L.P.!!.

Check I

DRESDEN UNIT 3 SAFETY RELATED MANTENANCE-MAY,1982 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Drywell Instr.

Preventive W.R. #20175 N/A N/A Weld angle iron hanger Line back onto I beam. Was broken during outage work.

Torus /RX Bldg Preventive W.R.#20210 N/A N/A Replaced gasket on blank Vac Breaker flange.

U-3 Steam Line Preventive W.R. #15871 N/A N/A Relocated breakers as Drain Breakers requested.

HPCI Test Valve Preventive W.R. #17070 N/A N/A Removed limitorque and yolk building. Pressure 2301-10 seal ring, valve bonnet.

j stem and pressure seal ring. Was badly worn.

Repacked valve and fnstal-led new pressure seal ring.

HPCI Isolation Preventive W.R. #17276 N/A N/A Could not get lantern ring Valve out. Packed with 9 rings, 187I.

D-3 Isolation Preventive W.R. #17278 N/A N/A Couldn't get lantern ring Cond. Iso.

out. Repacked with 10 Valve rings, 187I.

D-3 RX Clean-Up Preventive W.R. #17279 N/A N/A Removed all packing (app.

Iso. Valve 10 rings) to lantern ring.

Couldn't get lantern ring out. Repacked with 15 rings.

l

DRESDEN UNIT 3 SAFETY RELATED MANTENANCE - MAY,1982 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACT*0N D-3 CRD F-10 Preventive W.R. #19953 N/A N/A Recoved shoot out steel and (22-39) retorqued CRD 22-39 to 500 ft. lbs. Shoot out steel to be installed per W.R. #19954.

D-3 CRD F-5 Preventive W.R. #19957 N/A N/A Removed shoot out steel

~

(22-19) and retorqued CRD #22-19 to 500 ft lbs. Shoot out steel to be installed per W.R. #19951.

D-3 CRD 14-43 Preventive W.R. #19968 N/A N/A Rmoved shoot out steel.

and retorqued CRD #14-43 to 500 ft lbs. Also installed steel.

D3 CRD 18-35 Preventive W.R. #19969 N/A N/A Removed shoot,out steel and retorqued tRD #18-53 to 500 ft lbs. Shoot out steel to be installed per W.R. #19954.

3 "A" Tip Ball Preventive W.R. #20359 N/A N/A No work done. Valve Valve wrking ok 5/11/82.

Acoustic Fbnitor Preventive W.R. #08918 N/A N/A Changed resistors and

Preamp, performed checks.

Safety Valves /

Preventive W.R. #13895 N/A N/A Install gags on safety Target Rocks valves and target rock.

Removed gags A-H.

Target Rock Preventive W.R. #13905 N/A N/A Rencved old valve.

Checked grove depth.

Installed new gasket and valve.

DRESDEN UNIT 3 SAFETY RELATED MANTENANCE - MAY,1982 NATURE OF LER OR OUTAGE HALFUNCTION EQUlPHENT HAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION DW Cover Preventive W.R. #13925 N/A N/A Cleaned DW need flange.

Installed new O-rings.

D-3 HPCI Steam Preventive W.R. #16236 N/A N/A.

Lenghtened eye bolt and

, Line reinstalled sway brace on both 215 and 217.

R-6 No Pault Preventive W.R. #16428 N/A N/A Replaced probe checks.

SW.00.OK Ok.

D-3 Corespray Preventive W.R. #17277 N/A N/A Disassembled valve.

Testable Ck repaired pin and actuator Valve rod. Repacked valve.-

Reassembled.

U-3 D/W N Preventive W.R. #17579 N/A N/A Removedoldplugahid 2

Backup seat assembly.

Acad D.W. H Preventive W.R. #17679 N/A N/A Replaced sensor in s

2 Sensors and A train.

Mstr.

"B", "D", "E" Preventive W.R. #18059 N/A N/A Install new pilot valves..

Electromatic Valves LPRMs Preventive W.R. #19142 N/A N/A Replaced and tested all LPRM's.

Drywell Equip-Preventive W.R. #19358 N/A N/A Removed chk. valve ment Drain and covers.

Floor Drain

DRESDEN UNIT 3 SAFETY RELATED MANTENANCE - MAY,1982.

NATURE OF LER OR OUTAGE HALFUNCTION EQUIPMENT HAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION 3A LPCI Test Preventive W.R. #19525 N/A N/A Cylinder moved and Check Valve seals cleaned, reassem-bled and tested.

DQ Line for Preventive W.R. #19935 N/A N/A Cut out cracked 90 and

' 3-1501-25A installed new valve and fittings.

' D-3 CRD K-5 Preventive W.R. #19952 N/A N/A Renoved shoot out steel (38-19) and retorqued to 500 lbs.

D-3 CED 1-13 (42-51)

Preventive W.R. #19958 N/A N/A Removed shoot out steel and retorqued CRD #4251.

T M 3-203-3B Preventive W.R. #19963 N/A N/A Removed bottom cover, cleaned and installed new seal rings.'.

s S/D Cooling Preventive W.R. #20023 N/A N/A Tightened nut.

Hanger

' Accumulator Rod Preventive W.R. #20076 N/A N/A Installed jumper and '

Block removed same after coup.

wk.

Accumulator Rod Preventive W.R. #20077 N/A N/A Installed junpers and

' Block removed same.

3 "E" Flow Preventive W.R. #20111 N/A N/A

-Installed spare flow Converter converter and calibrated.

HPCI 3-2301-4 Preventive W.R. #20214 N/A N/A Jumpers installed and removed upon ca p.

DRESDEN UNIT 3 SAFETY RELATED HANTENANCE MAY,1982 NATURE OF LER OR OUTAGE HALFUNCTION EQUIPHENT HAlNTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION HPCI 125 VDC Preventive W.R. #18048 N/A N/A Corrected wiring error.

Control Power D-3 CRD Lll Preventive W.R. #20213 N/A N/A Rebuilt A Scram pilot valve.

Mechanical Preventive W.R. #19568

.N/A N/A Replaced snubbers as Snubber requested. Fbilowed work instruction for settings.

Iso-Cond. Auto Preventive W.R. #20066 N/A N/A Set Iso Cond. Auto Act.

Ast. ID Relays T.D. Relays as per Tech Specs.

D-3 Rod R6 Preventive W.R. #19617 N/A N/A Rebuilt both SOL.

(# 58-23)

CRD B-9 Preventive W.R. #19861 N/A N/A Replaced the121 and 123 g

(06-35) valve.

U-3 Target Rock Preventive W.R. #17854 N/A N/A Pulled target rock sole-Valve noid 1-5-82 BS.

Bench tested, work ok 1-6-82 DS. leak test ok. Rein-stalled 1-12-82 BS.

125 V D.C.

Preventive W.R. #20235 N/A N/A Replaced broken fuse Ground and replaced pinched wire.

U-3 123-B Aux.

Preventive W.R. #19162 N/A N/A

'Took relay apart, cleaned Relay and lubed.

U-3 Turbine Preventive W.R. #16096 N/A N/A Cleaned and inspected Valves all limits.

DRESDEN trillT 3 SAFETY RELATED HANTENANCE - MAY,1982 HATURE OF LER OR OUTAGE MALFUNCTION EQUlPHEllT HAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Relay 590-123-Preventive W.R. #19411 N/A N/A Replaced relay.

C Aux.

SDV Preventive W.R. #19847 N/A N/A Replaced defective alarm card.

ACAD/ CAM Preventive W.R. #18975 N/A N/A Adjusted limit switch.

2499-2A Valve Relays Preventive W.R. #20065 N/A N/A Jumpers installed 4-22-82.

~

ACAD 2599-1A Preventive W.R. #20021 N/A N/A

'Ihis valve must have a Valve flow signal from FC3 '

2540-0154 before you'll tsve a supply of air to operate 3-2599-1A. Every-thing checked out ok.

Feedwater Preventive W.R. #13887 N/A N/A Renoved old packing.

Manual Stop Removed lantern ring and Valve cut off. Installed 21 rings of new packing.

F rings, 1625 GF, 17 rings Grafoil.

RX-Bldg.

Preventive W.R. #20144 N/A N/A Found pinched wire on maonet. Repaired wire, grd cleaned.

U-3-Mov 1201-1 Preventive W.R. #20212 N/A N/A Replaced mtr.

bO 3-1301-1 Preventive W.R. #20162 N/A N/A Replaced torciue switch.

Valve

DRESDEN UtilT 3 SAFETY RELATED HANTENANCE - WsY,1932 NATURE OF LER O't OUTAGE HALFUNCTION EQUIPMENT HAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION U-3 1601-55 Preventive W.R. #19867 N/A N/A If a red tag solenoid is Valve not available in store-rom a "like for like" replacement can be used.

Verify that coil voltage and catalog number are the same.

3D Cont. Cool lPreventiveW.R.#19154 N/A N/A Rmove cable per instruc-Serv. Wat Pump tions 3-14-82.

N/A N/A Replaced mtr-set limits, IIPCI 3-2301-10 Preventive W.R. #20058 checked torque settings.

Target Rock Preventive W.R. #20002 N/A N/A Replaced air hose with a new one, #503869.

IIPCI Turbine Preventive W.R. #13931 N/A N/A Disassembled. couplings.

Repacked with*marfak.

s A0-1601-24 U-3 Preventive W.R. #19622 N/A N/A Versa val've solenoid needs Containment replacing. None in stock Vent Valve in storeroom.

125 V Batt.

Preventive W.R. #18699 N/A N/A Checked operating mechanism Turbine Bldg.

and found very little slope Main Bus Bkr.

in handle. Tightened B-1 down all screws holding mechanism. Operatinq mechanism line c breaker perfectly.

Inerting Sample Preventive W.R. #19813 N/A N/A Adjusted the'close limit Return Valve switch.

3-8501-3A

N O

I T

C A

e l

E b

V ac I

T C

d E

e t

R r

l R

i i

O a

u C

p b e

e R

R a

T A

A L

/ /

U N

N S

E N

R O

I T

C NU F.

lA 2

H 891 E

A A

S

/

/

U N

N Y

A n

C 3

F T

I N

E U

C N

N A

E N

D E

S T

E N

R A

D H

E G

D A

E T

T UR A

OE L

B E

RM R

OUN Y

R T

E E

L F

A S

2 7

0 7

7 5

9 4

1 1

E FC ON R.

R.

A EN RE W

W UT TN e

e AI v

v NA i

i H

t t

n n

e e

v v

e e

r r

P P

-ua T

8 r

N 6

ds E

1 ye l

H 7

l l

P 3

u I

Dd U

Ro Q

e CM E

lb 3 c a

i C

Ul

~

>li

,l

O

\\

0 u) u UI 0

  • U G W

w UW M

g Hw E

=e4 (L O

  • ll v

DW D

z to W

Z E

O O=

D J

.,J<

Z N

CO M

=

z m

N

~

W D

U Z

z 5

W C

W to W

W Z

E C

Z W

L3 O

W v-DE OW W

co W

EZ E

O

.D.

W g

W W

W L<

to i

LW l

O2 1

W2 EW D>

>Z 25-l 2"

MN A

N.

D C.W -

o u

w x oi

SUMMARY

OF OPERATING EXPERIENCE UNIT ONE May, 1982

)

5-1 to 5-31 Unit one was shutdown for the entire month, awaiting license approval for the chemical cleaning. Major work scheduled to be completed following chemical cleaning is as follows:

HPCI installation for ECCS upgrading, equip-1 I

ment upgrade to IEEE 279, major in-service inspection, and refuel, i

i I

l

,e--

--m

-~g r-- - - -,

emm-

- --.+

SLMWW OF OPEPATING EXPERIENCE UNIT 'INO May, 1982 5-1 to 5-6 Unit Two entered the month operating at a power level of 771 W e and operated until 1021 hours0.0118 days <br />0.284 hours <br />0.00169 weeks <br />3.884905e-4 months <br /> on my 6th when a Reactor Scram occurred due to hi flux trip / contractor error. A contractor (Bechtel) opened an energized cubical for pot fuses.

5-6 to 5-14 A quick turnaround was performed and the Unit placed on the grid again until May lith when a scheduled shutdown was per-formed. %is forced shutdown was due to a GE/CDCo directive of a 11ydrogen Addition Test to reduce oxygen levels in the BWR.

In addition, other general maintenance was performed, i.e. change oil in recirculation pumps.

5-14 to 5-28 During this period the Unit was unable to operate at rated We due to bearing temperature alarms on the recirculation pumps. The new oil to the pumps was determined not to have the heat transfer characteristics as expected.

5-28 to 5-31 A short shutdown was performed on the 28th to change the oil in the recirculation pumps. W e Unit exited the period at 535 We (increasing 5 We/hr).

>l

/

sum ARY OF OPERATING EXPERIH CE LNIT 'DIREE

,t May, 1982 s

I 5-1 to 5-9 Unit t ree had just completed a refueling outage. h is period was devoted to scram / start-up testing, turbine testing and low power operation.

5-9 to 5-15 Iow power operation continued, however, L. P. fdedwater control problems occurred during the entire period. On the 15th the Unit was placed in hot-standby while work was performed on the heater control problem.

~

5-15 to 5-31 The Unit was placed back on the line and exited the period at 773 We (5 me/hr increase).