ML20054A952

From kanterella
Jump to navigation Jump to search
Summary of Systematic Assessment of Licensee Performance Review Group Meeting 81-13 on 810707.Review Group Rept Approved,Pending Incorporation of Minor Comments
ML20054A952
Person / Time
Issue date: 07/07/1981
From:
NRC - SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE REVIEW
To:
NRC - SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE REVIEW
Shared Package
ML19310G156 List:
References
FOIA-81-392 NUDOCS 8204160241
Download: ML20054A952 (5)


Text

.

MINUTES - SALP MEETING 81-13 July 1,1981 The SALP Review Group convened at 9:30 a.m. on July 1,1981 for meeting 81-13 in the Air Rights Building Conference Room 5033.

Attendees were:

J. H. Taylor, IE*

D. G. Eisenhut, NRR C. Michelson, AE0D J. H. Sniezek, IE R. H. Wessman, IE

  • for N. C. Moseley 1.

The Review Group reconsidered Susquehanna and Regional SALP Board input provided June 30, 1981.

Susquehanna was evaluated to be average.

A final tally of facility ratings is attached.

2.

The Review Group Report was approved, pending incorporation of minor comments.

A copy will be available to Review Group members by July 13, 1981.

The Review Group is scheduled to meet with the ED0 on July 15,1981 at 9 a.m.

k$0#dop241 811103 UDELL81-392 PDR

7/1/81 Ope' rating Reactors Above Average Average Below Average Region I Yankee Rowe Ginna Vermont Yankee Maine Yankee Salem Millstone 1, 2 Haddam Neck Beaver Valley 1 Indian Point 3 Oyster Creek Calvert Cliffs Pilgrim

  1. TMI-l FitzPatrick Peach Bottom Indian Point 2 Nine Mile Point 1 Region II Oconee North Anna Surry Farley
  • McGuire 1 Brunswick Robinson Crystal River 3 Sequoyah 1 Browns Ferry Turkey Point St. Lucie 1 Hatch l

Region III Prairie Island Zion Palisades Point Beach Quad Cities Davis-Besse l

Dresden Monticello Big Rock Point Kewaunee Duane Arnold La Crosse DC Cook

'

  • Evaluated with operating reactors

Operating Reactors (Continued)

Above Average Averaae Below Average Region IV Cooper Ft. St. Vrain Arkansas Fort Calhoun Region V Trojan Rancho Seco San Onofre 1 l

l Totals:

9 26 15

1 Construction Reactors Above Average Average Below Average Region I Hope Creek Seabrook Limerick Shoreham Millstone 3 Beaver Valley 2 Nine Mile Point 2 Susquehanna 1, 2 Region II Summer Catawba Shearon Harris Watts Bar McGuire 2 Grand Gulf Cherokee Sequoyah 2 Yellow Creek Phipps Bend Hartsville Bellefonte Vogtle Region III Perry Midland Fenni Marble Hill LaSalle Zimer Braidwood Byron Cal 1away Clinton I

Construction Reactors (Continued)

Above Average Average Below Average South Texas Project Region IV Wolf Creek River Bend Commanche Peak Waterford 3 Region V WNP-3/5 WNP-2 San Onofre 2,3 Palo Verde Diablo Canyon WNP-1/4 Totals:

0 35 7