Forwards First Monthly Rept Re Status of Prompt Notification Sys Implementation at Facilities.Meteorological Programs, Emergency Response Facilities & Research Reactors Need Addl Mgt Attention & Clarification
ML20053E548
Person / Time
Site: Hatch, Browns Ferry, Oconee, Mcguire, Saint Lucie, Grand Gulf, Sequoyah, Summer, Brunswick, Surry, North Anna, Turkey Point, Crystal River, Farley, Robinson, McGuire, 05000000, 05000303
Issue date: 01/08/1981
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20049J052 List:
References
FOIA-82-195, REF-SSINS-9199 NUDOCS 8206090009
Download: ML20053E548 (4)


Text

__. _

a g ".%c.,k UNIT ED STATES l

NUCLEAR REGULATORY COMMISSION ENCLOSURE 2 gj REGION !!

L g

101 MARIETTA ST., N W, %UITE 3100 8,

%*f ATl.AfdA, oEo AotA 30303

/g u

JAh 0d Eli SSINS 9199 MEFORANDUM FOR:

Richard C. DeYoung. Director. Office of Inspection and Enforcement FROM:

James P. O'Reilly, Regional Administrator

SUBJECT:

IMPLEMENTATION STATUS OF PROMPT NOTIFICATION SYSTEMS As requested, the first monthly report of the status of prompt notification system implem:ntation at Region II facilities is pr3vided (Enclosure 1).

As indicated in Enclosure 1, there are two Region II facilities where full implemantation of the systems by February 1,1982, is not yet a certainty, although both utilities state that they fully expect to meet that date.

A potential delay at Browns Ferry is primarily associated with receipt and installation of hardware.

The St. Lucie situation is rather unique, in that the potential problem is a possible refusal by St. Lucie County to accept and use the installed system. After numerous discussions between FP&L,. State of Florida, and St. Lucie County representatives, a three-party contract-has been drafted and is scheduled for discussion with the St. Lucie Ccunty Coxnission on January 11-12, 1982.

We understand that this draft.

centract provides that FP&L will pay all necessary and reascnable operating and maintenance expenses a' d will indemnify the system.

FP&L is actively n

pursuing resolution of this remaining issue.

There have been no FEMA Region reviews of Region II facility systems to evaluate the resuTts of system tests.

FEMA Guidan'ce Memorandum #18, dated May 21. 1981, proposed actions to qualify prompt notification systems against NUREG-0654/ FEMA-REP-1, including a questionnaire to be provided to members of the public residing within the 10 mile EPZs.. FEMA submit.ted this document to OMB in May,1981 for approval, and has apparently taken no further action.

I believe it is imperative that the FEMA /NRC Steering Committee take the necessary action to insure that the FEMA reviews are promptly scheduled and implemented.

Other emargency preparedness areas that appear to need additional management u

l attention and clarification at this time are meteorological programs, emergency l

1 CONTACT:

G. R. Jenkins 242-5541 l

8206090009 820511 PDR FOIA REYNOLD82-195 PDR

_w

._---,._,m c_,,., _ _ _

.-,_g

.lAN O a ;ggy

~

P.ichard C. DeYoung Page 2 of Enclosure 2 1

response facilities, and also, to a lesser extent perhaps, research reactors.

The Region II staff has been discussing these areas with IE:HQ staff attempting to stay current.

h'f n

~

' tva,.

et\\

'J,ames P. O'Reilly

( -~~~. \\

Enclosure:

As stated y

ccit/ enc 1:

B. Grimes, DEP

\\

_,)

' ' ~ ~

em S

a N Emuum e

9 8

k 4

4

\\

6 k,

a Page 3 of Enclosure 2 CNCLOSURE 1 PROMPT NOTIFICATION SYSTEM REGich JI_FAcitITTES ~~

EXPECTED IMPLEMENTATION (1)

FACILITY AS OF 1/5/82 COMMENTS TESTING U (4)

~

TOTAL SYSTEM Browns Ferry 2/1/82 (2)

See Footnote (2)

Pending ~nstall-ation Brunswick 2/1/82 After testing, 1/18/82 additional sirens were required Crystal River 7/1/81 Complete Complete Farley 10/1/81 Complete Complete Grand Gulf 10/31/81 NTOL Complete Hatch 7/1/81 Complete; Tone Complete

. alert radio systens used for prompt notification McGuire 7/1/81 Compfete Complete North Anna 12/8/81 Complete Complete Oconee-7/1/81 Complete Complete Robinson 2/1/82 After testing, 1/11/82 additional sirens were required Sequoyah 8/1/81 Complete Complete St. Lucie 2/1/82 (3)

See Footnote (3)

Pending St. Lucie County acceptence of administrative responsibility SInrrar 2/1/82 NTOL 1/30/82 Surry 12/8/81 Complete Complete Turkey Point 2/1/82 No problems Pending resolu-expected tion of the St. Lucie situation to allow consistent

!ee Footnotes on Pa;e 2 contract with Dade County.

Page 4 of Enclosure 2 PAC;iPT NOTIFICATION SYSTEM REG'ON II FACILITIES (1) Including operability testing of each siren.

(2) By 2/1/82, TVA expects to have the Browns' Ferry system completely installed with the possible exception of:

(a) the radio controlled trigger machanism on 28 sirciis due to delivery delay; (b) installation of one siren may be delay:2d due to property acquisition delays; (c) the delivery date for five mob'ie sirsu has not been guaranteed by the vendor.

(3) By 2/1/82, FP&L expects to have the St. Lucie system installed and operational, including on.. ability testing of eecn stren.

Mcwever, there is still a major issue regar.r.rg full implementation, since a proposed three-party contract

( FP&L, S ta '..r. St. Lucie County) is not yet agreed to by St. Lucie County.

This is bV.ng actively pursued by FPAL.

(4) Testing af total system refers to a simultaneous activation of all sirens (or tone alert radios).

Final acceptance testing against the criteria of NUREG-0654/ FEMA-REP-1 awaits coordination and participation with FEMA.

Se e

  • h o

'o

~

UtJITED STATES 3..3,,. jj $

i'J :.

I NUCLEAR REGULATORY COMMISSION g-- -.v.

REGION lli e, '.y

'f [

ENCLOSURE 3 799 ROOSEVELT ROAD

% 9 P

...,f GLEN ELLYN. ILLINotS 60137 January 5, 1982 FEMORANDUM FOR: Brian K. Grimes, Director Division of E=ergency Preparedness, IE FROM:

Jack A. Hind, Director Division of E=ergency Preparedness and Operational Support

{

SUBJECT:

UPDATED INFORMATION ON PROMPT NOTIFICATION AND WARNING SYSTEMS FOR REGION III LICENSEES Current status of the Prompt Notification and Warning System for Region III licensees is attached in tabular form and represents th'e latest 1

information received as of January 4, 1982, by Region III, DEPOS staff.

Conversatio. with FEMA's management indicate they are currently reviewing the proposed systems. Approximately 65% of their reviews have been

, completed. We will continue to keep you informed of chEnges relevant to this subject.

~

s W

,/

. A. Hind, Director Division of Emergency Preparedness and Onerational Support

Attachment:

As s tated N

r 0

jn

\\

}$

/j)/ '

/

/

'~~

\\

h s

I I

l IS THERf ENOUCH TECHNICAL INFORitAflor:

l FLANNED CENERATED TO HAKE EVALUATION OF WARNING l

REACTORS AND INSTAL.LATION (WYTET IIUtlRFRS DATE CURRENT STATUS SYSTEM?

Dresden 2/1/82 Strens nd other equipment for waning systems are st!!! being Partial information has been received on 50-2);

received. Permits from local governmente are almost complete these plants, but not sufficient yet for 50-373 for Zion and Dresden. About 70% of the permits have.been evaluation. Licensee has agreed to received for the area around quad Cities. System testing will provide the staff with the needed inforne-q,s;id-Ci t ie s be done af ter installation.

tion.53-254 8

50-265 Z$en 50-195

  • l 50-104 is.e l le Installed System to installed and operationally tested.

Yes 50-173 Point Beach 2/1/82 Letter of December 16. 1981 from licensee to R. A. Clark, NRA.

Yes, this December 16. 1981 letter plus o

D gives addillonel dealan description of system and states that prior information in November 20. 1981 g'

50-266 system will be fully operational before February I 1982.

letter is suf ficient information.

to 50-301 to LicenseeworkingwithFotnt8eachinajo1Etefforttoinstall Tes, based on information received in O

rewaunce 2/1/82 strene. Pertinent information has been received.

letter of November 20. 1981 to J. Keppler.

50-305 m

Region III.

I

3 n.

04vis-sesse 2/3/82 Licensee responded to letter from J. C. Keppler. NRC Region 111 Yes, technical information has been O

on December 30. 1981. Licensee agreed to instalt 32 new strens received in letter of December 30. 1988.

c in 5-10 mile EFZ. New atten total is now 43.

Right-of-way System testing will be done after instal-h 50-346 approval from local government agencies needed. Status reports lation.

W will be provided in writing on January 8. 15. and 22. 1982.

o t

I I

~

, IS THERE EHOUCH TECHNICAL INFORMATIDH F LANNED CENERATED TO HAKE EVALUATION OF WARNING REACTCIS AND INSTALLATION SYSTEHf DOCrET NUMBERS DATE CURRENT STATUS Lacrosse 90 days after, Latter, drafted'by Region III on November 25, 1981, stating that No 50-409 approval by 1\\ mile EFE is unacceptable le still held by HRR-HQ for approval.

This to a reply to licensee's letter of April 2 and October 22, NRC 1981, to NRR. No strens are currently installed.

Bir. Hock Point Request indef-Licensee sent letter dated December 28, 1981 to D. H. Critchfield, No 50-155 inite estension NRR, requesting entension of Feb.1,1982 deadline due to Charlevoix I

of Feb. I, 1982 County resolution prohibiting installation and activation of the date warning system. Charlevoix County rescinded resolution a feu days I

1 ster, but this caused a three week delay in installation.

1 1

Honticello 2/15/82 Letter to Region '111 dated December 28, 1981 gave current status Tee, letter of December 22, 1981 incluJes 50-26)

(Approx.)

of equipment received and installation of of rens. Fourty-nine technical information needed by Region llL strens have been mounted and 12 control cabineto installed. Four System will be tested prior to going weeks needed af ter equipment delivery to complete installation operational.

and testing of the system. Delay of receipt of control cabinets will delay ine,tatistion.

I From same letter referenced above, 41 have been mounted and 30 Tee, letter of December 16, 1981 incluJe s

,o D8 Frairie Island 2/1/82 Power control cabinets have been installed. Licensee's expedt-technical information needed by Region til 50-282 tors are visting vendote to speed up delivery of these control System will be tested prior to going 50-306 St!!1 espect to meet Feb. 1, 1982 deadline.

operational, cabinets.

o-b rn D. C. Cook Installed Fourteen afrene installed and operab,le as of August 1981.

No, avatting reply from American Electric Activation will be by 8erien County Sheriff's Office. System Power Service Corporation representative fl

.s has been tested. Administrative procedures for notification to supply this information.

50-385 Cg 50-316 are in place.

C-1 (D

r.silsad,e 2/1/82 Some strens were moved in the 0-5 alles range. Poles are att No, swetting reply to licensee in letter set and equipment installed in 5-10 miles range. Circuitry hoe to sent November 2y, 1981 from Reston Ill.

be completed. Individual strene have been tested. Complete 30-255 operational test of entire system to scheduled for February 6, 1982, as previously on fiset Saturday of month.

.4

~

o I

8 I

l,

? 15 TitERE ENCUCH TECNMICAL INFOR?tATto?1 PLANNED CENERATED TO itAKE EVALUATION OF WAR:;I:Y.

p[\\CTORS AND INSTALLATION faj kET NUMBERS DATE CURRENT STATUS STSTEN?

Duane Arnold installed Licensee responded to Region 111's Confirmation of Action Letter Tee, as listed under current Sc ice.4.

50- MI with reply dated December 14, 1981 describths the prompt public The stren system has been functis,nat t -

notification system including technical information. Activation tested.

of the system will be in accordance with the County Flens.

Complete system will be tested January 6,1982.

Zimmer 2/1/82 Licensee submitted on December 14, 1981, a package of corres-Tes, sufficient information supplied as indicated under Current Status.

pondence and technical information on their proept public 50 358 notification system. Twenty-one of 30 strens have been installed.

Stren system testing and documentation are scheduled for com-pletion by March 1, 1982.

=.