6 y
TABLE 15,4,1-2 (Continued)
Test Frequency 14.
Refueling System Interlocks Functioning Each refueling shutdown 15.
Service Water System Functioning Each refueling shutdown 16.
Primary System Leakage Evaluate Monthly (6) 17.
Diesel Fuel Supply Fuel inventory Daily 18.
Turbine Stop and Functioning Monthly (6) (9)
Governor Valves 19.
Low Pressure Turbine Visual and magnetic Every five years Rotor Inspection (5) particle or liquid penetrant l
20.
Boric Acid System Storage Tank Daily Temperature 21.
Boric Acid System Visual observation Daily of piping temperatures (all >145'F) 22.
Boric Acid Piping Heat Electrical circuit Monthly Tracing operability (1)
A radiochemical analysis for this purpose shall consist of a quantitative measurement of each radionuclide with half life of >30 minutes such that at least 95% of total activity of primary coolant is accounted for.
(2)
E determination will be started when the gross activity analysis of a filtered sample indicates >10 pc/cc and will'be redetermined if the primary coolant gross radioactivity of a filtered sample increases by more than 10 pc/cc.
(3)
Drop tests shall be conducted at rated reactor coolant flow.
Rods shall be dropped under both cold and hot conditions, but cold drop tests need not be timed.
(4)
Drop tests will be conducted in the hot condition for rods on which maintenance was performed.
(5) As accessible without disassembly of rotor.
(6)
Not required during periods of refueling shutdown.
(7)
At least once per week during periods of refueling shutdown.
(8) At least three times per week (with maximum time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> between samples) during periods of refueling shutdown.
(9)
Effective in March 1982, the requirement for the monthly functional test for Point Beach Unit 2 is relaxed and extended until the start of the eighth refueling outage.
l Amendment No. 75 8203300119 820324 PDR ADOCK 05000301 P