Amend 53 to License DPR-27,allowing one-time Waiver of Requirement for Monthly Functional Tests of Turbine Stop & Governor Valves Until Start of Seventh Refueling Outage
ML20126H835
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/03/1981
From: Clark R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20126H840 List:
References
43607, TAC-43607, TAC-48064, NUDOCS 8104220128
Download: ML20126H835 (4)


Text

e m asc

[(ps uq[c UNITED STATES y s. c ( j-NUCLEAR REGULATORY COMMISSION WASHINGTON,0. C. 20555

- /, '

v 'y'..

C

<) e, 3 -

m l

9..u.:,?

1 WISCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-301 POINT EEACH NUCLEAR PLANT, UNIT NO. 2 r

AMEt!DMENT'TO FACILITY OPERATING LICENSE 4

Amendment No. 53 i

License No. DPR-27 1.

The Nuclear Regulatory Commissicn (the Conmission) nas found that:

A.

The application for amendment by Wisconsin Electric Power Company (tne licensee) dated March 23, 1951, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; 3.

The facility will cperate in conformity with the application, the orovisions of the Act, and the rules and regulations of the Cenmissien; C.

There is reasonable assurance (i) that the activities authori:ed by this amendment can be conducted without endangering the health anc safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendrent will not be inimical to the com on defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements i

have been satisfied.

L a10.422oIJ8

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License i

No.. DPR-27 is hereby amended to read as follows:

B.

Technical Soecifications t

The Technical Specifications contained in Appendices A and 3, as revised through Amendment No. 53, are i

hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical 3pecifications.

3.

This license amendnent is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY CCHMISSION

b. l-l

' l,

- u.Um/

i/1

s. p.._ 4s - G' 9 Robert A. Clark, Chief

\\ss-Operating Reactors Branch d3 Division of Licensing l

i Attachtert:

Chances 50 t"e Technical i

specifi:ations l

Date of :ssuance: April 3, 1981 t

t l

1 1

I I

~

u i

ATTACHMENT TO LICENSE AMENDMENT 3-AMENDMENT NO. 53 TO FACILITY OPERATING LICENSE NO. OPR-27 DOCKET NO. 50-301 Revise Appendix A as follows:

Remove Page Insert Page Table 15.4.1-2 (continued)

Table 15.4.1-2 (continued)

i L

TABLE'15'4.1-2 (Continued)

Test Frecuencv 14.

Refueling Systen Interlocks Functioning-Each refueling shttdown 15.

Servie.e Water Syste:

' Functioning Each refueling shutdown I

b 16.

Primary Syste Leakage Evaluate Menchly (6) i 17.

Diesel FuelLSupply Fuel inventory Daily l

'18.

Turbine Stop and Functioning Monthly (6)(9) l f

Governor Valves r

19.

Lew Pressure Turbine Visual and magnetic Every five years Rotor Inspection (5) particle or liquid l

penetrant k

20.

Soric Acid Syste:

S:crage Tank Daily Temperature

'21.

3cric Acid Syste Visual cbservation Daily i

cf piping temperatures (all 1145'F) j e

22.

Ieric Acid Piping Hee:

Electrical circuit Monthly Tracing operibility l

(1) A radiochemical analysis for this purpose shall consist of a quanti:ative ressurement cf each radionuclide with half life of >30 minutes such that at least 95% of Octal activi:y cf primary ccolant is accounted for.

(2)

I determination will be started when the gross activi:y analysis of a fil:ered f

sa ple indica:es >10 pc/cc and will be redetermined if the primary ecolan:

j l

gress radicactivity of a fil:ered sample increases by acre than 10 c/cc.

(3) Drop tests shall be condue:ed at rated reactor coolant flew.

Kods shall be

{

dr:pped under both cold and hc: conditions, but cold drop :es:s need not be

ired.

(4) Drep tests will be conducted in the het conditien fcr reds on which maintenance 1

was performed.

(5) As accessible without disassembly of rotor.

(6)

ct required during periods cf refueling shu:dewn.

(7) A: least cnce per week during periods of refueling shutdcwn.

(S) At least three times per week (with caximum time of 72 hcurs between samples) during perieds of refueling shutdown.

(9) Effective in March 1961, the requirement for the centhly functional tes:

for Point Beach Unit 2 is waived until the start cf Le seventh refueline l

I outage.

1 l

J Amend:en:. :c. 38, 50, ;3 l

- - - -.