Forwards Technical Evaluation Rept, Comparison of Plant & Model Radiological ETS, & Revised 820218 & Summary of 820203-04 Meeting.Requests Final Submittal within 60 Days.W/O Encl
ML20042A984
Person / Time
Site: Oyster Creek
Issue date: 03/16/1982
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Fiedler P
JERSEY CENTRAL POWER & LIGHT CO.
Shared Package
ML20042A985 List:
References
LSO5-82-03-075, LSO5-82-3-75, NUDOCS 8203240359
Download: ML20042A984 (5)


Text

peg m

ft y

  • ,jo D

UNITED STATrif

+

s 8)*

('h NUCLEAR REGULATORY COMMISSION e

g '- (

p WASHINGTON, D. C. 20555

'V L cal PDR March 16, 1982

'S ORB Reading NSIC 4

DCrutchfield Docket No. 50-219 cp f

LS05-82-03-075 g

J b rdo

,j

/*

  • OELD

~

, h

,,,c 71992y. 2 Ol&E Mr. P. B. Fiedler N

. : [.w, ;

ACRS (10)

SEPB m" "

S FCongel Vice President and Director - OysteriCreek~

J Oyster Creek Nuclear Generating Station t f

CWillis D@-lT @ gW Post Office Box 388 ls Forked River, New Jersey 08731

Dear Mr. Fiedler:

SUBJECT:

RADIOLOGICAL EFFLUENT TECHNICAL. SPECIFICATIONS (RETS) AND 0FFSITE DOSE. CALCULATION MANUAL (0DCM) - OYSTER CREEK NUCLEAR GENERATING STATION This letter transmits the Franklin Research Center (FRC) Technical Evaluation Report (TER), " Comparison of Plant and Model Radiological Effluent Technical Specifications" dated January 27, 1982 and revised February 18, 1982 (Enclosure 1). This report reflects the initial review of your proposed RETS and the agreements reached at the February 3-4,,1982 meeting held at GPU Nuclear Corporation headquarters. is a summary of the results of that meeting. For the majority of the items discussed at the meeting the licensee presented clarifications and agreed to either change the specifications to meet our requirements or present justification for deviations.

We request that you provide a final submittal for the RETS and ODCM in accordance with the enclosed report within 60 days of receipt of this letter. Should you have any questions please contact your assigned project manager.

This request for information is followup to a pending plant-specific l

application. Therefore, OMB clearance is not required under P.L.96-511.

Sincerely, 6

h-N!

DennisM.Crutchfield.dhief g6ffl i

Operating Reactors Branch #5 DSy l

Division of Licensing i

Enclosures:

1.

Technical Evaluation Report 2.

Meeting Summary CC w C CI S 1:

omce > 01:..MP.fl S

. 36..#5..

DI.

p

5....

L h DC JLombar N

..\\.i.Gn....g....:

...i..e..l.d.

-m >

3 h....k..

.. p.s....

8203240359 820316

, unc PDR ADOCK 05000P19 DFFICIAL RECORD COPY mare an-u m W

PDR

v Mr. P. B. Fiedler

~

2-March 16, 1982 cc G. F. Trowbridge, Esquire Resident Inspector Shaw, Pittman, Potts and Trowbridge c/o U. S. NRC 1800 M Street, N. W.

Post Office Box 445 Washington, D. C.

20036 Forked River, New Jersey 08731 J. B. Lieberman, Esquire Commissioner Berlack, Israels & Lieberman New Jersey Department of Energy 26 Broadway 101 Commerce Street New York, New York 10004 Newark, New Jersey 07102 Natural Resources Defense Council Ronald C. Haynes, Regional Administrator 917 151h Street, N. W.

Nuclear Regulatory Commission, Region I Washington, D. C.

20006 Office of Inspection and Enforcement-631 Park Avenue J. Knubel King of Prussia, Pennsylvania 19406 BWR Licensing Manager GGPU Nuclear 100 Interplace Parkway Parsippany, New Jersey 07054 Deputy Attorney General State of New Jersey Department of Law and Public Safety 36 West State Street - CN 112.

Trenton, New Jersey 08625 Mayor Lacey Township 818 Lacey Road Forked River, New Jersey 08731 U. S. Environmental Protection Agency Region II Office ATTN:

Regional Radiation Representative 26 Federal Plaza New York, New York 10007 Licensing Supervisor Oyster Creek Nuclear Generating Station Post' Office Box 388 Forked River, New Jersey 08731 5

I s

/

N

.E CLOSURE 2

's

/

suEmeryofMajorIssues

~

u e

The following is a list of the major deficiences in the Licensee's,,

proposed RETS. The attached updated draf t technical review report dated January 27, 1982 and revised February 18, 1982 reflects the resolutions.

achieved.

Each of. the following items will be addressed by-the Licensee in the forthcoming re-submittal,

.,,,,,.,a, l.

The requirement for alarm / trip setpoints on liquid and gaseous, effluent monitors was not addressed. The surveillance requirement for source check is missing.

3,

' 2.

The requirement for tank level indicating devices for outdoor. liquid holdup tanks was not addressed.

3.

The following deviations in the sampling and analysis program for liquid and gaseous effluents were identified:

a.. Lower Limits of Detection (LLDs) were not specified.

b.

Principal gamma emitters in the gamma isotopic analysis were not specified.

Sampling for I-131, Sr-89, Fe-55 and dissolved noble gases in c.

liquid samples was not stipulated.

d.

A sampling and analysis program of service water effluents was',not provided.

Sampling for I-131, I-133, Sr-89, and Sr-90 in gaseous effluents e.

was not stipulated.

., i,

f.

Tritium sampling over tha spent fuel pool area was not stipulated.

4.

The requirement for effluent monitors located in the offgas building and in the new liquid / solid radwaste building was not addressed.

5.

Appendix I calendar quarter dose limits were not addressed.

6.

The requirement for monthly dose calculations was not addressed.

7.

The release rate limits for noble gas releases and for iodine releases may not conform with the required limits specified in the Model RETS.

8.

Requirements for " operability" of the liquid radwaste treatment system, the gaseous radwaste treatment system, and the ventilation exhaust systems are not addressed fully in the proposed RETS.

9.

Com.mitment for an NRC-approved Process Control Program was not specifiea.

.I-I

f-

. s l

,i

/

.J 10.

The locations of environmental samples in the Radiological fi.nrtr.t

..?

e.,w i s.

Environmental Monitoring Program were not given and should.be'.

'*M

/

included in the ODCM.

8. : d;.'!. ' i d' 11.

The requirement for 40 stations for measuring the dire'ct ra'diat' ion'in" the environment was not fully addressed.

E..

i 12.

LLDs in the Radiological Environmental Monitoring Program vere not specified.

13.

The Interlaboratory Comparison Program requirements were no,t" addressed.

14.

The proposed RETS do not include the required site boundary figures for liquid and gaseous effluents.

'o. '

15.

The Model RETS requirements for audits and written procedures were not addressed in the. proposed RETS.

' 16.

The Semiannual. Release Reports do not address the requirements for reporting " solid waste shipped offsite."

17.

Commitment for " Prompt Notification Reports" for offsite release rates which exceed set limits and for outdoor tanks which exceed the curie limits was not addressed.

r.

18.

Changes to the Process Control Program and to the ODCM'were not ~

' i addressed in the proposed RETS.

19.

The Model RETS Administrative Control Section 6.15." Major Changes to' Radioactive Waste Treatment Systems," was not included in the' uicensee's proposed RETS.

Flow Diagram of Gaseous Release Paths Early in the meeting, FRC reviewed with the Licensee a flow diagram of the gaseous release paths and the location of the hydrogen monitors and the radiation monitors in order to establish a basis for the review of the effluent monitoring instrumentation.

The initial diagram presented by FRC wa's prepared using information contained in " Final Description and Analysis of Augmented Offgas System and Liquid / Solid Radioactive Waste Treatment Systems.

Oyster Creek Nuclear Generating Station Unit 1."

The flow diagram which reficcts the current flow paths is contained on page 3.

Of fsite Dose Calculation Manual The Licensee has not yet submitted an ODCH and recognizes the need'to do so.

The Licensee will submit an ODCM with the RETS re-submittal'or'will submit a schedule for submittal of the ODCM.

2

AIDETED OFFG\\S SYSTDi

'N g---

N l

'h y

h y

l Main IN05E,F RE-066 RE-075 St.

b l

b0 SCm nain m enser SJAE 60 min. delay

-l II 1I f.

I P Pc l

l Dryers Charcoal Deds I

w g

1.

Recembiners d

AtnerrD OmmS SYSim

,. ; ;,},

9 m

8 Si b

Turbine Seals S

e Main D9 m

Stack INO3A O

82.4nn rm a

'Dirbine Bldg.

scint 6

"it

~

65,000 CM1 O

Reactor Bldg.

9 i 1 15,000 cm ~

.'r.ia '

Radwaste Bldg.

.. ~

E Pbof vent g..

O.

jg

,e (Unnonienrw11

~

.1

~

'nirbine Bldg.

p (Condensato arrl Fecdwater Ptmp Pocms)

Poof Ment RE-58 g

Jas, part.,ilodine L'

New Liquid / Solid f

Fad aste Dldg.

FDof Vcnt m

RE-076 kk Jas, part., iodine f

J Offq,in Bldg.

_