Letter Sequence Approval |
|---|
|
|
MONTHYEARML19276F1481979-03-21021 March 1979 Forwards Tech Spec Change Requests 35,37 & 38 Requesting Amend to App a of License DPR-72.W/check for $12,000 Fee Project stage: Other ML19341D7131981-04-0303 April 1981 Responds to 801120 Request for Proposed Change to Tech Specs Re safety-related Hydraulic & Mechanical Snubbers.Review Continues in Order That Util Can Adequately Address Listed Concerns.Tech Specs Change to Be Sent 810601 Project stage: Request ML20004D0831981-06-0101 June 1981 Advises That No Need to Increase Snubber Surveillance Program Has Been Identified.Declines to Submit Tech Spec Change Request.Current Surveillance Program Adequate in Identifying Potential Problems Project stage: Other ML20039E3951981-12-28028 December 1981 Forwards Tech Spec Change Request 38,Revision 1,adding 120 Snubbers to Table 3.7-3 of License DPR-72 Tech Specs. Certificate of Svc Encl Project stage: Other IR 05000302/19820011982-01-22022 January 1982 IE Insp Rept 50-302/82-01 on 820104-08.No Noncompliance Noted.Major Areas Inspected:Requalification Training of Licensed Operators,Procedures,Surveillance & Calibr Control Program Project stage: Request ML20040G7691982-02-0202 February 1982 Amend 50 to License DPR-72,adding 120 Snubbers to Table 3.7-3 & Designating All Snubbers in Reactor Bldg as Inacessible During Reactor Operation Project stage: Other ML20040G7751982-02-0202 February 1982 Safety Evaluation Supporting Amend 50 to License DPR-72 Project stage: Approval ML20040G7781982-02-0202 February 1982 Notice of Issuance & Availability of Amend 50 to License DPR-72 Project stage: Other ML20065C7241982-09-10010 September 1982 Part 21 Rept Re Contaminants in Snubber Hydraulic Fluid. Initially Reported on 820323.Program Developed in Which Fluid Reservoirs Completely Flushed Prior to Filling W/Fresh Fluid.Containment Snubbers to Be Rebuilt by 821001 Project stage: Other ML20072A5201983-01-17017 January 1983 Discusses Insp Interval for Hydraulic Shock Suppressors (Snubbers) Located Outside Reactor Bldg.Snubbers Will Be Placed on 12-month Visual Insp Interval Upon Entering Next Refueling Outage Project stage: Other 1981-06-01
[Table View] |