Monthly Operating Rept for Feb 1974
ML20037A450
Person / Time
Site: Oconee  
Issue date: 03/12/1974
From:
DUKE POWER CO.
To:
Shared Package
ML20037A441 List:
References
NUDOCS 8001230669
Download: ML20037A450 (2)


Text

-

UNIT Oconee Unit 2 DATE Marcl 12. 1974 0PERATING STATUS 1.

REPORTING PERIOD:

February 1 gg February 28 672 CROSS IOURS IN REPORTING PERIOD:

2568

.gg g T 2.

CURRESTLY AUTliORIZED POWER LEVEL }Mt I

NO"*

3.

POWER LEVEL TO WHICH RESTRICTED (IF AhT):

REASONS FOR RESTRICTIONS (IF AhT):

~

4.

Oconee Unit 2 is presently in power escalation testing and is not cornercially operable. Items 10-13 are not applicable THIS CUMULATIVE MONTH YR-ID-DATE TO DATE 5.

HOURS REACTOR WAS CRITICA1.

0 85.6 743.0 6.

HOUES GENERATOR ON-LINE O

64.0 577.2 7.

CROSS THEP?.AL POWER GENERATED (Mull) 0 104099 709271 6.

CROSS ELECTRICAL POWER GENERATED (MW) 0 33000 209310

-2352 23612 175899 9.

NET ELECTRICAL POWER GENERATED (MWU)

10. REACTOR AVAILABILITY FACTOR (1) 11.

PLAhT AVAILABILITY FACTOR (2) 12.

PLAhT CAPACITY FACTOR (3) 13.

}VRCED OUTAGE RATE (4) 14.

SHUTDOWNS SCHEDULED "U BEC1N IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH):

15.

IF SHUTDOWN AT D;D OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

16. PLANTS IN TEST STATUS (PRIOR TO CO}DIERCIAL OPERATION) REPORT THE FOLLOWIRO:

DATE LAST DATE REASON FOR EDRECAST ACHIEVED DIFFERENCE 11/11/73 INITIAL CRITICALITY 12/5/73 INIIIAL ELECTRICAL POVER CENERATION 5/15/74 COMMERCIAL OPERATION

  • 100 (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR UAS CRITICAT.

GROSS LOURS IN REPORTING PERIOD

  • 100 (2) PLAhT AVAILABILITY FACTOR = HOURS CENERATOR ON-lit *E

~

/ /

GROSS !!OURS IN REPORTING PERIOD 8 0012 3 (QQof.. _,.

(3) PLANT CAPACITY FACTOR = NET ELECTRICAL, POWER GENERATED _

CURREhTLY LICENSED POWER LEVEL

  • CROSS 10URS IN REPOR
  • 100 (4) FORCED OUTAGE RATE = FORCED OUTAGE 110URS liOURS GENERATOR ON-LINE + PORCED OUTAGE LOURS

~

Mt

  • y

o o

I, f

e 01DetARY:

Oconee Unit 2

).-

UNIT NAME DATE March 12, 1974 REFORT MONTH. Februaryi 1974 FLANT' SHUTDOWNS _

I TYPE METIIOD OF F-FORCED DURATION

~SilUTTIND DOWN 3'O.

DATE S-SC;1EDULED (IIOURS)

REASON (1)

Ti!E REACTOR (2)

C0!CIENTS,

3 740122 F

672.0 A

B Reactor' coolant pump 2B2 seal failed.

(1) REASON:

(2) METH03:

- A-EQUIPMENT FAILURE (EXFLAIN)

A-MATJAL -

B-?!AINT. OR, TEST B-1*.rJUAL SCRAM C-REFUELING C-TJTOMATIC 5 CRAM, D-REGULATORT RESTRICTION E-OPERATOR TRAINING AND LICENSE EXA'.!INATION F-ADMINISTRATIVE'

~

C-OPERATIONAL ERROR (EXPLAIN) 6 j