r m

J oconee Unit 2 UNIT March 12. 1974 MTE CPERATING STATUS January 31, 1974 1.

REPORTING PERIOD: January I gn 743 GilDSS EDURS IN REPORTING PERICD1 2568

' MW-NET 2.

CURRENTLY AUTHORIEED POWER LEVEL IMt 4

None 3.

POWER LEVEL 10 WEICH RESTRICTED (IF ANY):

REASONS FOR RESTRICTIONS (IF ANY):

4.

Oconee Unit 2 is presently in power escalation testing and is not ecnetercially operable. Items 10-13 are not applicable.

THIS CUMULATIVE MONTH YR-TO-DATE TO DATE 5.

HOURS ETACTOR WAS CRITICAL 85.6 85.6 743.0 6.

HOURS GENERATOR ON-LINE 64.0 64.0 577.2 7.

CROSS THERMAL POWER GENERATED (MWH) 104099 104099 709271 8.

CROSS ELECTRICAL Pok7.R GENERATED (MVH) 33000 33000 209310 9.

NET ELECTRICAL POhT.R GENERATED (MWH) 25964 25964

~ 178251 i

10. REACTOR AVAILABILITY FACTOR (1)

^

11. PLAhT AVAILABILITY FACTOR (2)
12. PLAhT CAFACITY FACTOR (3)
13. 70RCED OUTAGE RATE (4)
14. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 M0hTilS (STATE TYPE, DATE AND DURATION OF EACil):
15. IF SHUTDOWN AT ENE OF REPORT PERIOD, ESTI:!ATED DATE OF STARTUP:
16. PLANTS IN TEST STATUS (PRIOR TO Com!ERCIAL OPERATION) REPOT.T THE FOLLOUING DATE LAST DATE REASON FOR FORECAST ACHIEVED DIFFERENCE 11/11/73 INITIAL CRITICALITY 12/5/73 INITIAL ELECTRICAL 70VER GENERATION 5/15/74 COMIERCIAL OPERATION
  • 100 (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITICAL CROSS IDURS IN REPORTING PERIOD
  • 100 (2) PLAhT AVAILABILITY FACTOR = HOURS GENERATOR OS-LINE GROSS HOURS IN REPORTING PERIOD (3) PLANT CAPACITY FACTOR = NET _ ELECT,RICAL POWER CENERATED_ _,

CURREhTLY LICENSED POWER LEVEL

  • CROSS IDURS IN RZPO

~* 100 (4) FORCED OUTAGE RATE = FORCED OUTACE 110URS BOURS GENERATOR ON-LINE + FORCED 00 G 1 800128

- y htARY:

Oconee Unit 2 UNIT W at

~

DATg February 28, 1974

  • Janudry,.1974 33ront McNis.

FLANT SEUTDOWNR i

TYPE HETHOD OF F-F0RCED DURATION

'SHUITIND.DOWN NO.

DATE S-SOIEDULED (HOURS)

REASON (1) tile react 0R (2)

ColttENTS,

1 740101 F

27 B

A Repaired feedwater and condensate system valves 2

,740104 F

410.7 A

C Detected loose object in reactor vessel lower bead following reactor trip; AEC approval to. continue operation granted January 15, 1974

,3 74b122 F-198.3 A

B Reactor coolant pump 2B2 seal failed i

(1) REASON:

(2) METH03:

A-EQUIFHENT YAILURE (EIFLAIN)

A-MArJAL -

E-l' 3UAL SCRAM B-MAINT. OR, TEST C-REFUELING C-TJTOMATIC SCRAM D-REGULATORY RES1RICTION E-OPERATOR TRAINING AHD LICENSE EXA*lINATI0t4 F-ADH1!!!STRATIVE G-Ol'ERATIOllAL ERROR (EXPLAIN) g