g UNIT Oconee Unit 1 DATE March 12, 1974 OPERATING STATUS 1.
REPORTING PERIOD:
February 1 TO February 28, 1974 672 CROSS HOURS IN REPORTING PERIOD:
071 2.
CURREhTLY AUTliORIZED POWER LEVEL Ffdt 2568 trJe-NET 3.
POWER LEVEL TO WilICH RESTRICTED (IF AhT):
4.
REASONS FDR RESTRICTIONS (IF AhT):
THIS CUMULATIVE MONTH YR-ID-DATE TO DATE 5.
IDURS REACTOR WAS CRITICAL 608.3 944.9 5298.8 6.
HOURS GENERATOR ON-LINE 602.3 897.4 3886.4 7.
GROSS THERMAL POWER GENERATED (Mull) 1448355 2102162 8113043 8.
GROSS ELECTRICAL POWER GENERATED (MWH) 514700 736652 2825240 9.
NET ELECTRICAL POWER CENERATED ()f4H) 489702 695351 2654429
- 10. REACTOR AVAILABILITY FACIOR (1) 90.5 45.6 96.9
- 11. PLAhT AVAILABILITY FACTOR (2) 89.6 63.4 70.7 83.7 56.4 55.7
- 12. PLANT CAPACITY FACTOR (3)
- 13. M RCED OUTAGE RATE (4) 10.4 10.5 9.3 14.
SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH): Two week shutdown for modifications to high energy lines outside containment to coamence April 24, 1974.
15.
IF SliUTDOWN AT END OF REPORT PERIOD, ESTII ATED DATE OF STARTUP:
- 16. PLANTS IN TEST STATUS (PRIOR TO C0121ERCIAL OPERATION) REPORT THE FOLLOWING:
DATE LAST DATE REASON FOR IURECAST ACHIEVED DIFFERENCE INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION C0F01ERCIAL OPERATION (1) REACTOR AVAILABILITY FACTOR = UOURS REACTOR WAS CRITICAL
- 100 GROSS IDURS IN REPORTII;G PERIOD
- 100 (2) PLAhT AVAILABILITY FACTOR = UOURS GENERATOR ON-LINE
~
GROSS HOURS IN REPORTING PERIOD
{
8001230 g
(3) PLAhT CAPACITY PACTOR = NET ELECTRICAL POWER GENERATED CURRENTLY LICENSED POWER LEVEL
- GROSS HOURS IN EEPORTIN
- 10'J (4) FORCED OUTAGE RATE = FORCED OUTAGE HOURS HOURS GENERATOR ON-LINE +
ED OUTAGE HOURS M U ~' -- -u A
r.
- =
3 UNIT oconee Unit i DATE March 12, 1974 DAILY PLANT POWER OUTPUT MONTH February, 1974 AVERAGE DAILY MWe-net DAY AVERAGE DAILY MVe-net
. DAY 1
20734 22 20821
~
20876 2
20543 23 3
17403 24 20883 17136 4
18227 25 5
20391 26 20697 20796 6
20665 27 20819 7
20955 28 8
20844 -
29 9
20760 30 20612 10 33 12390 ij
-535 12
-546 33 777~
g 12655 15 16 16999 17 20955 4
,18 21028 19 20976
_20945 20 d
21 20896
--_e.,.e-c..
m.m,
,,,_,_.4 y,.
,,...,7..--,y,,,,,,9.-
..,.,.-,_,..__,,,~,,y,_
,_w.,. ~.,.
l i
LD01ARY UNIT NAME Oconee Unit 1 DATE March 12, 1974 REPORT MON'IH February, 1974' FLANT' SHUTDOWNS TYPE HETHOD OF F-FORCED DURATION
' SHUTTIND. DOWN NO.
DATE S-S CilEDULED (HOURS)
REASON (1)
Tile REACTOR (2)
C0! CENTS,
3' 740211 F
69.6 A
A Two control rod drive stators failed', causing two control rods to drop into the core.
1
=
+
I (1) REASON:
(2) MEIN 03:
A-EQUIPMENT FAILURE (EXFLAIF)
A-MATJAL -
^
B-MAINT. OR. TEST
' B- ?'#.iUAL SCRAM C-REFUELING C-1JIOMATIC SCRAN D-REGULATORT RESTRICTION 6
' E-OPERATOR TRAINING AND LICENSE EXA'!INATION F-AD;1INISTRATIVE C-OPEllATIONAL ERROR
^
(EXPLAIN)