ML20034C574

From kanterella
Jump to navigation Jump to search

Forwards Amend 125 to License DPR-61 & Safety Evaluation. Amend Revises Entire Current Set of Custom Tech Specs
ML20034C574
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/26/1990
From: Stolz J
Office of Nuclear Reactor Regulation
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20034C575 List:
References
TAC-43048, TAC-49109, TAC-66797, TAC-74179, TAC-74180, TAC-74181, TAC-74551, NUDOCS 9005040156
Download: ML20034C574 (8)


Text

,

, y cs:%'(

UN11 ED STATES

~

']

NUCLEAR REGULATORY COMMISSION a

_ ASHINGTON, D. C. 20666 '

W 7,,

  • ...+.[

April 26,1990 1

Docket No. 50-213 Mr. Edward J. Mroczka Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company i

Northeast Nuclear Energy Company P. 0.-Box 270 Hartford, Connecticut 06141-0270 l

Dear Mr. Mroczka:

SUBJECT:

ISSUANCE OF AMENDMENT (TAC NOS. 43048, 49109, 66797, 74179, 74180, 74181 AND 74551) i The Consnission has issued the enclosed Amendment No. '125 to Facility Operating-License No. DPR-61 for the Haddam Neck Plant, in response to your, applications 4

titled and-dated as follows:

1)

Revised Technical Specifications dated October 26.bmittals on August 21 1988, March 6, June 2, June 23, July 28, and August 4, supplemented-by su j

and November 22, 1989,_

i 2)

Pro)osed Changes to Technical Specifications Section 3/4.5 of_ Revised Tec1nical-Specifications dated August 2, 1989, 3)

Proposed-Revision to Technical Specifications Fire Protection dated July 31, 1989, 4)

Proposed Changes to Technical Specifications Cycle 16 Reload dated

{

July 28, 1989, supplemented by submittal on September 29, 1989, j

5)

~ Proposed Changes to Technical Specifications Electrical Power Systems dated November 16, 1987 and: revised August 29, 1988, supplemented.by i

submittals on June 9,~ July 19, and August-1,.1989, and

{

6)

Proposed Changes to Technical Specifications Reactor Protection System I

Phase II and Nuclear Instrumentation' System Upgrades dated July 28, 1989.

1 This amendment will revise 'the entire current set of custom Technical Specifications (TS). These TS revisions include:

1)'aformatchangefrom

.l custom TS to the Westinghouse Standard-format Technical Specifications-(WSTS)..

2)changestoreflectmodificationstotheplantsuchasthenewswitchgear-1 room (Appendix R), High Pressure Safety Injection Recirculation Path, and ReactorProtectionandNuclearInstrumentationReplacements,3)changesas recommended by various Generic Letters and changes associated with NUREG-0737

~5 9005040106 900426 7

eacx osey

g 9.

g Mr. Edward 'J. Mroczka

-2 April 26,1990 and the Systematic Evaluation Program.

Details of the TS changes and our

" conclusion that the proposed TS changes are acceptable are provided in the enclosed Safety Evaluation which is divided into six parts each of which addresses the changes requested in items 1) through 6) above.

The following TS changes were denied or deferred:

1)'

By submittal dated October 26, 1988, the-licensee requested that TS I

Section 5.3.1, " Fuel Assemblies" be revised to allow insertion of stainless steel filler rods or vacancies as justified by the cycle-specific reload analysis. The staft has deferred the review of this request to the resolution of GL 90-02, " Alternative Requirements for Fuel Assemblies in the Design Features Section of Technical Specifi-Cations."

2)

By submittal dated June 2,1989, the licensee requested to add the words "to be repaired" to Ts Section 4.4.5.4.e 6, " Plugging Limit."

3)

By submittal dated June 2, 1989, the licensee requested that the charging flow indication calibration requirement be removed from the TSs.

4)

By submittal dated June 23,.1989, the licensee proposed _an additional ACTION (a) to TS Section 3.3.3.2, "The Movable Incore Detector System."

The proposed action statement stated that with less than the minimum number of detector thimbles required, the movable incore detector system could be used if penalty factors are applied to the linear heat generation rate or quadrant power tilt; or during recalibration of the system.

The specific evaluations are provided in the enclosed Safety Evaluation.

Our conclusions regarding the F,.ise II of the Reactor Protection System (RPS)

Upgrade are consistent with our Phase I conclusions.

The one unresolved-area is the potential susceptibility of the new equipment to electromagnetic inter-ference. The licensee shall submit by June Ib, 1990, or prior to restart a-2 plan outlining the analysis or testing necessary to demonstrate that the electrical environment of the new equipment is enveloped by the vendor's qualif_1 cation testing and the schedule by which this work will be completed.

As stated in our letter dated September 5, 1989, this TS upgrade effort does not fu'Ifill CYAPCO's SEP commitment to convert to the WSTS.

This review is not a STS conversion because:

1)

-A conversion would require a more comprehensive and detailed review, 2)

A conversion would evaluate all deviations of the current TS from the WSTS. This was not performed as part of this review..The staft confirmed that the current requirements were maintained and therefore, in general, the proposed TS changes could be considered an administrative change.

3

)b Edward J. Mroczka

- 3 3)

A c version would result in a " completeness" review to assure all appli le sections of the WSTS were included. This was not performed as part of iis review.

For this review, the staff did evaluate all new TS

proposed, CYAPC0 but only to determine if the.new TSs maintained the current reg rements, were appropriate and in the WSTS-format.

Therefore, the staff ects the STS conversion to be scheduled for-implementation because it is an SEP c itment.

A co)y of 'the related Safety valuation is enclosed..Also enclosed'is a copy of tie Notice of Issuance and copy of the Notice of Denial: and Opportunity for Hearing which have been forw ded to the Office of the Federal Register for publication.

Sin rely, John F. Stol Director Project Direct ate I-4 Division of Reac r Projects. I/II Office of Nuclear actor Regulation

Enclosures:

1.

Amendment No.

to DPR.61

?

2.

Safety Evaluation 3.

Notice of Issuance 4.

Notice of Denial cc w/ enclosures:

l See next page j.

  • SEE PREVIOUS CONCURRENCE l

FC

LA:PDI-4
PM:PDI-4 *
PDI-4 *
0GC
D:PDI-4

.... :................ :.............. :.............. :Q... [.gg )

ME ~ :SNorris

AWang: bid
GGarten
JStolz QTE -: / '/90
02/27/90
02/26/90
Y/zM/90
03/06/90

~0FFICIAL RECORD COPY-fNp

$2d>}$td Document Name: HNECK AMEND 43048 ETC g

g(

.i

b

.Mr. Edward J. Mroczka

-2 and the Systematic \\ valuation Program. Details of the TS changes and our conclusion that the roposed TS changes are accepteble are provided in the enclosed Safety Eval ation which is divided into six parts each of which addresses the changes requested in items 1) through 6) above.

As stated in our. letter ated September 5, 1989, this TS upgrade effort does not fulfill CYAPCO's SEP ommitment to convert to the WSTS.

This review is not a STS conversion becau e:

4 1)

A conversion would requ e a more comprehensive and detailed review, 2)

A. conversion would evaluat all deviations of the current TS from the F

WSTS.

This was not perfor d as part of this review.. The staff confirmed that the current r quirements were maintained and therefore, in general, the proposed TS chan es could be considered an administrative change.

3)

A conversion would result in a " ompleteness" review to assure all applicable sections of the WSTS wbre included.

This was not performed as:

part of this review.

For this reyfqw, the staff did evaluate all new TS proposed by CYAPC0 but-only to detergine if the new TSs maintained the current requirements, were appropriat and in the WSTS format.

Therefore, the staff expects the STS convers'on to be scheduled for implementation because it is an SEP commitment.

A copy of the related Safety Evaluation is enc 1 sed. Also enclosed is a copy i

of the Notice of Issuance which has been forward to the Office of the Federal Register for publication, s

Sincerely, Alan B. Wang, Project Manager Project Directorate 1 4 Division of Reactor Projects. I/II Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendment No.

to DPR-61 2.

Safety Evaluation 3.

Notice of Issuance cc w/ enclosures:

See next page OFC :LA:PDI.4

PM:PDI-4 PDI-4
OGC
D:P 4

....:............:..... g..:....

NAME :SNorris

AWang M d
GGar 66r :
JStol DATE :02/ /90
02/211(/90
02/26/90
0 g /90
W/gb/90 v '>

0FFICIAL RECORD COPY Document Name: HNECK AMEND 43048 ETC

Mr. Edward J. Mroczka-

-3.

3)

A conversion would' result in a " completeness" review to assure all applicable sections of:the WSTS were included. This was not performed as part of this review.

For.this review, the staff did evaluate _all new TS proposed by CYAPC0 but only to determine if the.new TSs maintained the-current requirements, were appropriate and in the WSTS format.

Therefore, the staff expects'the STS conversion'to be scheduled for' implementation because it is an SEP commitment.

A copy of the related Safety. Evaluation-is enclosed. Also enclosed is a copy of the Notice of Issuance and a copy of the flotice of Partial Denial and Opportunity for llearing which have been forwarded to the Office of the Federal Register for publication.

Sin'cerely, i

/s{

John F. Stolz, Director-Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendment flo.

to DPR 61 2.

Safety Evaluation t

3.

Notice of Issuance 4.

flotice of Partial Denial ec w/ enclosures:

See next page

'DFC LA:PDI-4

PM:PDI-4
PDI-4
0GC
D:PDI-4

,NAME

SNtirris
AWang: bid
GGarten
JMoore-
JStol lDATE :4/g(/90
02/27/90
02/26/90
04/23/90 t03/0C/ M ' 0 :

0FFICIAL RECORD COPY Document Name:

HNECK AMEND 43048 ETC I

l l

\\%

i DATED:

April P6,1990 AMENDMENT NO.125TO FACILITY OPERATING LICENSE NO. DPR HADDAM NECK PLANT DISTRIBUTION

(

Ils

  • PDI-4 Reading SVarga,14/E/4 BBoger 14/A/2 JStolz SNorris
  • t AWang GGarten
  • OGC*(for information only)

DHagan, 3302 MNBB

  • EJordan,)3302 MNBB
  • GHill(4 Wanda Jones * -

JCalvo

GPA/PA DC/LFMB DKubicki

  • f DFieno
  • TDunning
  • J

CWoodard RI

  • InezBailey*

E. Wenzinger, RI*-

.s

  • WITH TECHNICAL SPECIFIQATIONS cc:

Plant Service list i

l

Mr. Edward J. Mroczka

-3 April 26,1990 3)-

A conversion would result in a " completeness" review to assure all applicable sections of the WSTS were included.

This was not performed as part of this review.

For this review, the staff did evaluate all new TS proposed by CYAPC0 but only to determine if the new TSs maintained the I

current requirements, were appropriate and in the WSTS format.-

3 Therefore, the staff expects the STS conversion to-be scheduled for implementation because it is an SEP commitment.

A copy of ta < elated Safety Evaluation is enclosed.

Also enclosed is a copy of the Notite of Issuance and a copy of.the Notice of Partial Denial and-Opportunity-for Hearing which have been' forwarded to the Office of the Federal Register for publication.

I Sincerely, 0L' Jo

. Stolz Direct P ject Directorate

-4

' Division of Reactor Projects - I/II 3

Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendment No.125 to DPR-61 2.

Safety Evaluation 3.

Notice of Issuance 1

4 Notice of Partial Denial cc w/ enclosures:

See next page l

i l

l i

l l

l l

I i

A w

Mr. ' Edward J. Mroczka Connecticut. Yankee Atomic Power Company.

Haddam Neck Plant i

l xi Cc Gerald Garfield, Esquire R. M. Kacich, Manager:

- Day, Berry and Howard:

Generation Facilities Licensing i

Counselors at Law Northeast Utilities Service Company 1

City Place Post Office Box 270 i

Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 i

W. D. Romberg, Vice President D. O. Nordquist

-j Nuclear Operations.

Director of Quality Services Northeast Utilities Service Company Northeast Utilities Service Company

- Post Office Box 270' Post Office Box 270

.~

i

. Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270-L Kevin McCarthy, Director

- Regional Administrator 3

Radiation Control Unit Region I Department of Environmental Protection U. S. Nuclear Regulatory Commission l

State Office Building

. 475_Allendale Road i

Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 i

Bradford S. Chase, Under Secretary Board of Selectmen Energy Division Town Hall i

- Office of Policy and Management Haddam, Connecticut- 06103

'l 80-Washington Street Hartford, Connecticut 06106' J. T; Shedlosky, Resident Inspector a

Haddam Neck Plant D. B. Miller, Jr., Nuclear Station Director c/o U. S. Nuclear Regulatory Commission i

o Haddam Neck Plant Post Office' Box.116 Connecticut Yankee Atomic Power Company

-East Haddam Post Office

~

RFD 1, Post Office Box'127E East Haddam, Connecticut 06423 East Hampton, Connecticut 06424 t

G. H. Bouchard, Nuclear Unit Director Haddam Neck Plant i

i Connecticut Yankee Atomic Power Company i

RFD 1, Post Office Box 127E East Hampton, Connecticut 06424 i

I f

-.m u.

~ --.

4 e -,~.-,,

e-e.

+-

e v~

E------*

'