Notice of Issuance of Amend 125 to License DPR-61,revising Entire Current Set of Custom Tech Specs
ML20034C578
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/26/1990
From: Wang A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20034C575 List:
References
NUDOCS 9005040159
Download: ML20034C578 (3)


Text

. _ _..

j i

7590-01 i

UNITED STATES NUCLEAR REGULATORY Com!$$10N j

CONNECTICUT YANKEE ATOMIC POWER COMPANY i

i DOCKET N0. 50-213 l

NOTICE OF !$$UANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Comission (Comission) has issued Amendment l

No. 125 to Facility Operating License No. DPR 61 issued to Connecticut Yankee i

Atomic Power Company (the licensee), which revised the Technical Specifications for operation of the Haddam Neck Plant located in Middlesex County, Connecticut.

l The amendment is effective as of the date of issuance.

I The amendment revises the entire current set of Technical Specifications i

(TS).

These TS revisions include:

1) a format change from custom TS to the WestinghouseStandard-formatTechnicalSpecifications(WSTS),2)changesto

\\

reflect modifications to the plant such as the new switchgear room (AppendixR),HighPressureSafetyInjectionRecirculationPath,andReactor Protection and Nuclear Instrumentation Replacement, 3) changes as recomended by various Generic Letters and changes associated with NUREG-0737 and the-i Systematic Evaluation Program, f

The applications for the amendment comply with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's i

rules and regulations. The Comission has nede appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter 1, which l

are set forth in.the license amendment.

I i

b 13 P

PDC

~

i j

2-Noticot of Consideration of Issuance of Amendment and Opportunity for Hearing in connection with this action were published-in the FEDERAL REGISTER as follows:

(1) Application dated October 26, 1988, as supplemented March 6, June 2, June 23, July 28 August 4 e August 21 and November 22, 1989 published on September 11,1989(54FR37521).

(2) Application dated July 31, 1989 published on September 11, 1989 (54FR37519)

(3) Application dated July' 28, 1989 published on September 11, 1989 (54FR37520).

1 No request for hearing or petition for leave to intervene was filed following the notices.

The Commission has prepared an Environmental Assessment related to the above items and has determined not to prepare an environmental impact statement. Based upon the environmental assessment, the Comission has concluded that the issuance of this amendment will not have a significant effect on the quality of the human environment.

Notices of Consideration of Issuance of Amendment to facility Operating License and Proposed no Significant Hazards Consideration Determination and Opportunity for Hearing in connection with this action were published in the FEDERAL REGISTER as follows:

1 e

n e--

3 (1) Application dated August 2, 1989 published on September 20, 1989 (54FR38763).

(2) Application dated July 28 as supplemented September 29, 1989 published September 20,1989 (54 FR 38761)

(3) Application dated Noves6er 17, 1987, revised August 29, 1988, as supplemented June 9. July 19 and August 1,1989, published on December 14,1988($3FR50323).

The supplemental submittals noted t.bove did not affect the staff's initial proposed no significant hazards consideration determination.

No request for a hearing or petition for leave to intervene was filed following the notices.

Forfurtherdetailswithrespecttotheactionsee(1)theapplications for amendment as revised and supplemented noted in items (1) through (6) above, (2) Amendment No.125 to License No. DPR-61, (3) the Comission's concurrently issued Safety Evaluation and (4) the Comission's Environmental Assessment dated February 14, 1990.

All of these items are available for public inspec-tion at the Commission's Public Document Room, the Gelman Building, 2120 L Street N.W., Washington, D.C. and at the Local Public Document Room located at i

the Russell Library,123 Broad Street, Middletown, Connecticut.

A copy of items (2), (3) and (4) may be obtained upon request addressed to the U.S.

Nuclear Regulatory Comission, Washington, D.C. 20555, Attention:

Director, Division of Reactor Projects - I/II.

Dated at Rockville, Maryland this 26th day of April 1990.

l FOR THE NVCLEAR REGULATORY COMMISSION 0

s Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation