ML20034C576

From kanterella
Jump to navigation Jump to search
Amend 125 to License DPR-61,revising Entire Cuurent Set of Custom Tech Specs
ML20034C576
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/26/1990
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20034C575 List:
References
NUDOCS 9005040157
Download: ML20034C576 (3)


Text

.-

l --

- pm r. top 4'o

)

i f

L

_f

. UNITED STATES y,g NUCLEAR REGULATORY COMMISSION

  • [

c 1

i.

f,.

O; WASHING TON, D. C. 20666 e

[

CONNECTICUT-YANKEE ATOMIC POWER COMPANY l

DOCKET NO. 50-213 L

HADDAM NECK PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.125 License No. DPR-61 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The applications for amendment by Connecticut Yankee Atomic Power' (thelicensee), dated:

(1) October 26, 1988, as supplemented March 6, June.2, June 23, July 28, August 4, August 21 and November 22, 1989, (2) August 2, 1989, l

(3) July 31, 1989, i

(4) July 28,1989, as supplemented September 29, 1989, (5) hovember 17, 1987, revised August 29, 1988, as supplemented June 9, July 19 and August 1

1989, (6) July 28,1989, comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the-Comission's rules and l

regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the l

provisions of the Act, and the rules and regulations'of the L

Comission; 1

l C.

Thereisreasonableassurance(1)thattheactivitiesauthorizedby this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; F

I-D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all appitcable requirements have-been satisfied.

9005040157 900426 n

PDR ADOCK 05000213 P

PDC

,.-.*---.**r.,.--

. 2..

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR.61 is hereby amended to read as follows:.

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised I

through Amendment No.125, are hereby incorporated in the license, l-The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of issuance and shall be implemented within 60-days of issuance.

L FOR THE NUCLEAR REGULATORY COMMISSION

/

(

Od M

il

/0o#n4. Stolz,11 rector

[Pr6jectDirectorate14 7

l Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications,

Date of Issuance: April 26,1990

ATTACHMENT TO LICENSE AMENDMENT NO.125 FACILITY OPERATING LICENSE NO. DPR-61 p0CKET NO. 50-213 Replace the following pages of the Appendix "A" Technical Specifications with-the enclosed pages.

Remove Insert All All I

l i

e

?

(

.,