ML20028C995

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Nov 1981
ML20028C995
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 12/03/1981
From: Norris H
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20028C979 List:
References
NUDOCS 8301140384
Download: ML20028C995 (1)


Text

_. . .. --

.y . o .. .

OPERATING DATA REPORT e

.. DOCKET NO: 50-261 --

~

DATE: 811203-  %

COMPLETED BY: H.' Ray Norris

. TELEPHONE: (803) 383-4524 OPERATING STATUS Notes:- f 1.. Unit Name: H. B. Robinson' Unit #2 - .

-2.' Reporting Period: 811101, 0000 / 811130, 2400 There are presently 113-spent fuel'

3. Licensed Thermal Power .(Mit): 2300 assemblies in the spent fuel pool. -
4. Nameplate Rating (Gross PMe): 739 ,

. 5. . Design Electrical Rating (Net }Me): 700 .

. 6. Maximum Dependable Capacity (Gross-tMe): 700 ,y l

7. Maximum Dependable Capacity (Net IMe): 665 4

- 8. If Changes Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, 91ve Reasons:- No channe '

9. Power Level to khich Restricted, If Any (Net MWe): 325 (80% Reactor Power)
10. Reasons For Restrictions, If Any: Although the unit is not restricted by any outside agency, the power level is presently reduced due to steam generator considerations. l

( .

I This Month' Yr.-to-Date Cumulative  !

11. Hours in Reporting Period 720 8016 94182 3 12. Number of Hours Reactor Was Critical 170.75 5908.71 71673.99 J 13. Reactor Reserve Shutdown Hours *138.87 *246.29. *1224.17 3 14. Hours Generator On-Line 163.13 5763.93 '69922.75 J- .15. Unit Reserve Shutdown Hours 0.00 0.00 23.20 l 16. Gross Thermal Energy Generated (MWH) 182326 10843264 142055038 J 17. Cross Electrical Energy ~Cencrated (MWH) 55381 3404745 45743512' J 18. Net Electrical Energy Generated (MWH) 43006 _3193905 -43310357 J 19. Unit Service Factor 22.65 71.90 74.24  !

d 20. Unit Availability Factor 22.65 71.90 -

74.26 J 21. Unit Capacity Factor (Using MDC N'et) 8.98 59.92 69.15 J 22. Unit Capacity Factor (Using DER Net) 8.53 56.92 65.69 .<

J 23. unit Porced Outage Rate 77.43 21.92 14.59 l

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): .j Refueling / maintenance outage in late winter. '
25. .If Shut' Down At End of Report Period, Estimated Date of Startup: 12/1/81
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY -- --

INITIAL ELECTRICITY -- --

i COMMERCIAL OPERATION -- ---

l

  • Corrected on 830104 '

i 8301140384 830103  !

PDR ADOCK 05000261 '

R PDR o (9/77) i sg .

x .- - - , . -- -._