Revised Monthly Operating Rept for Nov 1981
ML20028C995
Person / Time
Site: Robinson 
Issue date: 12/03/1981
From: Norris H
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20028C979 List:
References
NUDOCS 8301140384
Download: ML20028C995 (1)


Text

_..

.y. o OPERATING DATA REPORT e

DOCKET NO: 50-261 DATE: 811203-

~

COMPLETED BY:

H.' Ray Norris TELEPHONE: (803) 383-4524 OPERATING STATUS Notes:-

f 1.. Unit Name:

H. B. Robinson' Unit #2 -

-2.' Reporting Period: 811101, 0000 / 811130, 2400 There are presently 113-spent fuel'

3. Licensed Thermal Power.(Mit):

2300 assemblies in the spent fuel pool. -

4. Nameplate Rating (Gross PMe):

739

. 5.. Design Electrical Rating (Net }Me):

700

6. Maximum Dependable Capacity (Gross-tMe): 700

,y l

7. Maximum Dependable Capacity (Net IMe):

665 4

8. If Changes Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, 91ve Reasons:-

No channe '

9. Power Level to khich Restricted, If Any (Net MWe):

325 (80% Reactor Power)

10. Reasons For Restrictions, If Any: Although the unit is not restricted by any outside agency, the power level is presently reduced due to steam generator considerations.

l

(

I This Month' Yr.-to-Date Cumulative

11. Hours in Reporting Period 720 8016 94182 3
12. Number of Hours Reactor Was Critical 170.75 5908.71 71673.99 J
13. Reactor Reserve Shutdown Hours
  • 138.87
  • 246.29.
  • 1224.17 3
14. Hours Generator On-Line 163.13 5763.93

'69922.75 J-

.15. Unit Reserve Shutdown Hours 0.00 0.00 23.20 l

16. Gross Thermal Energy Generated (MWH) 182326 10843264 142055038 J
17. Cross Electrical Energy ~Cencrated (MWH) 55381 3404745 45743512' J
18. Net Electrical Energy Generated (MWH) 43006

_3193905

-43310357 J

19. Unit Service Factor 22.65 71.90 74.24 d
20. Unit Availability Factor 22.65 71.90 74.26 J
21. Unit Capacity Factor (Using MDC N'et) 8.98 59.92 69.15 J
22. Unit Capacity Factor (Using DER Net) 8.53 56.92 65.69 J
23. unit Porced Outage Rate 77.43 21.92 14.59 l
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

.j Refueling / maintenance outage in late winter.

25..If Shut' Down At End of Report Period, Estimated Date of Startup:

12/1/81

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY i

COMMERCIAL OPERATION l

  • Corrected on 830104 i