.y. o OPERATING DATA REPORT e
DOCKET NO: 50-261 DATE: 811203-
~
COMPLETED BY:
H.' Ray Norris TELEPHONE: (803) 383-4524 OPERATING STATUS Notes:-
f 1.. Unit Name:
H. B. Robinson' Unit #2 -
-2.' Reporting Period: 811101, 0000 / 811130, 2400 There are presently 113-spent fuel'
- 3. Licensed Thermal Power.(Mit):
2300 assemblies in the spent fuel pool. -
- 4. Nameplate Rating (Gross PMe):
739
. 5.. Design Electrical Rating (Net }Me):
700
- 6. Maximum Dependable Capacity (Gross-tMe): 700
,y l
- 7. Maximum Dependable Capacity (Net IMe):
665 4
- 8. If Changes Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, 91ve Reasons:-
No channe '
- 9. Power Level to khich Restricted, If Any (Net MWe):
325 (80% Reactor Power)
- 10. Reasons For Restrictions, If Any: Although the unit is not restricted by any outside agency, the power level is presently reduced due to steam generator considerations.
l
(
I This Month' Yr.-to-Date Cumulative
- 11. Hours in Reporting Period 720 8016 94182 3
- 12. Number of Hours Reactor Was Critical 170.75 5908.71 71673.99 J
- 13. Reactor Reserve Shutdown Hours
- 138.87
- 246.29.
- 1224.17 3
- 14. Hours Generator On-Line 163.13 5763.93
'69922.75 J-
.15. Unit Reserve Shutdown Hours 0.00 0.00 23.20 l
- 16. Gross Thermal Energy Generated (MWH) 182326 10843264 142055038 J
- 17. Cross Electrical Energy ~Cencrated (MWH) 55381 3404745 45743512' J
- 18. Net Electrical Energy Generated (MWH) 43006
_3193905
-43310357 J
- 19. Unit Service Factor 22.65 71.90 74.24 d
- 20. Unit Availability Factor 22.65 71.90 74.26 J
- 21. Unit Capacity Factor (Using MDC N'et) 8.98 59.92 69.15 J
- 22. Unit Capacity Factor (Using DER Net) 8.53 56.92 65.69 J
- 23. unit Porced Outage Rate 77.43 21.92 14.59 l
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
.j Refueling / maintenance outage in late winter.
- 25..If Shut' Down At End of Report Period, Estimated Date of Startup:
12/1/81
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY i
COMMERCIAL OPERATION l
- Corrected on 830104 i