_

OPERATING DATA REPORT h

DOCKET NO: 50-261 DATE: 821201 w

COMPLETED BY:

H. Ray Norris TELEP110NE: (803) 383-4524 OPERATING STATUS Notes:

1. Unit Name:

H. B. Robinson Unit #2

2. Reporting Period: 821101, 0000 / 821130, 2400 There are presently 157 spent fuel
3. Licensed Thermal Power (FMt):

2300 assemblies in the spent fuel pool.

4. Nameplate Rating (Gross' M'.le):

739

5. Design Electrical Rating (Net FMe):

700

6. Maximum Dependabic Capacity (Gross FMe):

700

7. Maximum Dependable Capacity (Neti FMe):_

665 4

8. If Changes Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report Reasons:

No change '

, Give

9. Power Level to Which Restricted, If Any (Not FMe):
10. Reasons For Rest,rictions, If Any:_ Although the unit 1955 MW't Reactor Power is not restricted by any outside agency, the power level is presently reduced due to steam generator considerations This Month ~

Yr.-to-Date Cumulative

11. Hours in Reporting Period 720 8.016 102942
12. Number of Hours Reactor Was Critical 688.97 3786.9 76132.32
13. Reactor Reserve Shutdown Hours
14. Ilours Generator On-Line 31.0 3 31.03
  • 1271.12 687.2 3575.84 74131.15
15. Unit Reserve Shutdown Hours O'

0 23.20

16. Gross Thermal Energy Generated (IMH)
17. Gross Electrical Energy" Generated (?MH)

_ 1265349.6 6372019.6 149467393.6 404872 2014395

18. Net Electrical Energy Generated (MWU) 48092365 380823 1860227 45480478
19. Unit Service Factor
20. Unit Availability Factor

__ 95.4 4 44.61 72.01 93.44 44.61 72.03

21. Unit Capacity Factor (Using MDC N'et) 79.54 34.89 66.44
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate

_ /5.56

_ 33.15 63.11

~

_=4.3b

_*7.90 14.29

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

_ Type Two 5/14/83. Four week steam generator inspection outade.

25..If Shut Dcwn At End of Report Period, Estimated Date of Startup:

12/1/82

26. Units In Test Status (Prior to Commercial Operation):

3 Forecast Achieved i

INITIAL CRITICALITY t

f INITIAL ELECTRICITY COMMERCIAL OPERATION l

8301140374 830103 PDR ADOCK 05000261 R

PDR i

j

  • Corrected on 830104 5

cg 9777)

e u

DOCKET NO. 50-261 UNIT SHUTDOWNS AND POWER REDUCTIONS ~

UNIT NA\\1E H. B. Robinson DATE 821201 j

COMPLETED BY H. Ray Norris' REPORTMONTil ovember TELEPilONE (803) 383-4524 N

e.

E 4.u,5 sx Licensec

,E r.,

b

'Cause & Correstive

'=

5?

E Action to

S3 No.

Date g

3g

(

jgy Event g,?

Prevent Recurrence 8,:

j;5g Report 8 my H

,2

- 'g

=

W VALVEX S/G chemistry was unacceptable due 11-1 821129 F

  • 32.80 A

3 to mechanical. failure of caustic i

injection valves. This resulted. in j

~

inleakage of sodium hydroxide into the make-up water system and*from there to the S/G's.

The va.lves were replaced.

~

4 3

2 Method:

Exhibit G-Instructions F: Forced Reaum:

l.Madual for Preparati m of Data S: Scheduled A l'quipment Failure (Explain).

2-Manual Scram.

Entr> Sheets for Licensee

3. Automatic Scram.

Event Report (LER) File (NUREG-Il Mainter.ance of Test C. Refueling 4 Other (Explain) '

0161)

D.Regulatiny Resiriction E-Operaio Training & License Examination 5

F Admmistrative Exhibit ! Same Source G Operational Errur (Ex' plain) 19/77) ll Other (Explain)

  • Corrected on 830104
  • t 1