Revised Monthly Operating Rept for Dec 1981
ML20028C989
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/05/1982
From: Norris H
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20028C979 List:
References
NUDOCS 8301140379
Download: ML20028C989 (1)


Text

.

te -

e,,_...

n 1 OPERATING DATA. REPORT DOCKET NO: 50-261' DATE: 820105

. COMPLETED BY: - H. Ray Norris TELEP110NE:

(803) 383-4524 OPERATING STATUS.

Notes:

1.. Unit Name:

H.- B. Robinson Unit #2 2.. Reporting Period: 811201, 0000 / 811231. 2400 There are presently 113 spent fuel.

3. Licensed Thermal Power..(MWt):

2300-assemblies in the spent. fuel pool'.

4. Nameplate Rating- (Gross MUc):

739

5. Design Electrical Rating- (Not }Me):

700

6. Maximum Dependable Capacity (Gross 4Me): 700
7. Maximum-Dependable Capacity (Net FMe):

665

8. If Changes occur in Capacity Ratings (Item Number 3 through 7)-Since Last Report, Give Reasons:

No change

.9. Power Level to Which Restricted, If Any (Net MWe):

535 (80% Reactor Power)

30. Reasohs For Restrictions, If Any: Although the unit 1s not restricted by any outside agency,*.the power level is presently reduced due to steam generator considerations.

This Month' Yr.-to-Date Cumulative J

11. Hours in Reporting Period 744 8760 94926

-12. Number of Hours Reactor Was Critical 671.43 6580.14 72345.42 a

13. Reactor Reserve Shutdown Hours
  • 15.92
  • 262.21
  • 1240.09.
14. Hours Cencrator On-Line 632.56 6396.49 70555.31
15. Unit Reserve Shutdown Hours 0

0

-23.20 4

16. Gross Thermal Energy Generated (MWH) 1039736 11883000 143095374 4.
17. Cross Elec'trical Energy Generated (FMH) 332458 3737203 46075970 3
18. Net Electrical Energy Generated (TMH) 309894 3503799 -

43620251

19. Unit Service Factor 55.02 73.01 74.3 2-s 2
20. Unit Availability Factor 55.02 73.01 74.35

~

J

21. Unit Capacity Factor (Using MDC N'et) bz.63 60.14 69.10 1
22. Unit Capacity Factor.(Using DER Net) 59.50-57.13 65.64
23. Unit Forced Outage Rate 14.9 7 21.2 3 14 59 3

-24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

j.

Refueling / maintenance outage in late winter.

l4 25, if Shut Down At End of Report Period, Estimated Date of Startup-k

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved i

INITIAL ~ CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Corrected on 830104 l<

8301140379 830103 PDRADOCK05000g i

R '

(9/77)

i

-sg I u--

-