te -
e,,_...
n 1 OPERATING DATA. REPORT DOCKET NO: 50-261' DATE: 820105
. COMPLETED BY: - H. Ray Norris TELEP110NE:
(803) 383-4524 OPERATING STATUS.
Notes:
1.. Unit Name:
H.- B. Robinson Unit #2 2.. Reporting Period: 811201, 0000 / 811231. 2400 There are presently 113 spent fuel.
- 3. Licensed Thermal Power..(MWt):
2300-assemblies in the spent. fuel pool'.
- 4. Nameplate Rating- (Gross MUc):
739
- 5. Design Electrical Rating- (Not }Me):
700
- 6. Maximum Dependable Capacity (Gross 4Me): 700
- 7. Maximum-Dependable Capacity (Net FMe):
665
- 8. If Changes occur in Capacity Ratings (Item Number 3 through 7)-Since Last Report, Give Reasons:
No change
.9. Power Level to Which Restricted, If Any (Net MWe):
535 (80% Reactor Power)
- 30. Reasohs For Restrictions, If Any: Although the unit 1s not restricted by any outside agency,*.the power level is presently reduced due to steam generator considerations.
This Month' Yr.-to-Date Cumulative J
- 11. Hours in Reporting Period 744 8760 94926
-12. Number of Hours Reactor Was Critical 671.43 6580.14 72345.42 a
- 13. Reactor Reserve Shutdown Hours
- 15.92
- 262.21
- 1240.09.
- 14. Hours Cencrator On-Line 632.56 6396.49 70555.31
- 15. Unit Reserve Shutdown Hours 0
0
-23.20 4
- 16. Gross Thermal Energy Generated (MWH) 1039736 11883000 143095374 4.
- 17. Cross Elec'trical Energy Generated (FMH) 332458 3737203 46075970 3
- 18. Net Electrical Energy Generated (TMH) 309894 3503799 -
43620251
- 19. Unit Service Factor 55.02 73.01 74.3 2-s 2
- 20. Unit Availability Factor 55.02 73.01 74.35
~
J
- 21. Unit Capacity Factor (Using MDC N'et) bz.63 60.14 69.10 1
- 22. Unit Capacity Factor.(Using DER Net) 59.50-57.13 65.64
- 23. Unit Forced Outage Rate 14.9 7 21.2 3 14 59 3
-24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
j.
Refueling / maintenance outage in late winter.
l4 25, if Shut Down At End of Report Period, Estimated Date of Startup-k
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved i
INITIAL ~ CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Corrected on 830104 l<
8301140379 830103 PDRADOCK05000g i
R '
(9/77)
- i
-sg I u--
-