Responds to NRC Re Violations Noted in IE Insp Repts 50-438/82-22 & 50-439/82-22.Corrective Actions:Hold Placed on Further Installation of Shielded Power Cable in Cable Tray Sys.Investigation Continuing
ML20027C238
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 09/09/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20027C229 List:
References
NUDOCS 8210150181
Download: ML20027C238 (2)


Text

,

N e

TEN][>SEE VALLEY AUTHORITY cngTgA9aomT! TEN N ESSEE 37401 400 Chestnut' Street Tower II 32 Sf P l3

/18 00Septemher9,1982 U.S. Nuclear Regulatory Commission Region II Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - RESPONSE TO VIOLATION 50-438,50-439/82-22 VIOLATION OF CABLE MINIMUM BEND RADIUS This is in response to R. C. Lewis' letter dated August 12, 1982, report numbers 50-438/82-22, 50-439/82-22, concerning activities at the Bellerente Nuclear Plant which appeared to have been in violation of NRC regulations.

Enclosed is our response to the citation.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

To the best of my knowledge, I declare the statements contained herein are complete and true.

Very truly yours, TENNESSEE VALLEY AUTHORITY

/

L. M. Mills, Manager Nuclear Licensing Enclosure cc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 i

l l

l

!!AiB8Wogg00438 on3 An Equal Oppor tomtv E mn+va y

PDR

o 0

ENCLOSURE s

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 RESPONSE TO SEVERITY LEVEL IV VIOLATION 50-438,50-439/82-22-01 VIOLATION OF CABLE MINIMUM BEND RADIUS Descritpion of Deficiency 10 CFR 50, Appendix B, Criterion V as implemented by PSAR Section 17.1.5 requires that activities affecting quality be accomplished in accordance with documented instructions, procedures, or drawings.

General Construction Specification G-38, paragraph 3.2.1.2, identifies l

cables which have a minimum bend radius in excess of 12 inches.

t Contrary to the above, cable identified as having a minimum bend radius exceeding 12 inches was installed in vertical cable tray fittings which have a 12-inch radius. This installation causes the cable bend radius to be violated.

Admission or Denial of the Alleged Violation TVA admits the violation occurred as stated.

Reason for the Violation The design of the cable tray system was based on numerous factors. In some cases, the bending radius specified in General Construction Specification G-38 for the larger shielded power cables was not adequately considered by the designers.

Corrective Action Taken and Results Achieved An investigation is being made to determine if the as-installed condition will provide a suitable service life for the cable. Nonconformance Report (NCR) 1889, which was reported to NRC Inspector R. V. Crlenjak on August 6, 1982, has been written to document this concern. A review is being made of design requirements at other TVA nuclear plants, and nonconformance reports will be written if any deficiencies are found.

Steps Taken to Avoid Further Violations A hold has been placed on installing further shielded power cable in the cable tray system until resolution of this concern. Other action to prevent further noncompliance will be determined during investigation and resolution of NCR 1889.

Date of Full Compliance Full compliance will be achieved upon satisfactory resolution of NCR 1889.