05000280/LER-1982-081-03, /03L-0:on 820823,steam Flow Transmitter FT-1-495 Failed Low.Caused by Faulty Power Supply.Power Supply Replaced.Affected Instrument Channel Checked Satisfactorily & Returned to Svc

From kanterella
(Redirected from ML20027B293)
Jump to navigation Jump to search
/03L-0:on 820823,steam Flow Transmitter FT-1-495 Failed Low.Caused by Faulty Power Supply.Power Supply Replaced.Affected Instrument Channel Checked Satisfactorily & Returned to Svc
ML20027B293
Person / Time
Site: Surry Dominion icon.png
Issue date: 09/10/1982
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20027B291 List:
References
LER-82-081-03L, LER-82-81-3L, NUDOCS 8209200236
Download: ML20027B293 (2)


LER-1982-081, /03L-0:on 820823,steam Flow Transmitter FT-1-495 Failed Low.Caused by Faulty Power Supply.Power Supply Replaced.Affected Instrument Channel Checked Satisfactorily & Returned to Svc
Event date:
Report date:
2801982081R03 - NRC Website

text

_

Nn: FOIM 366 U.S. NUCLEAR RECULATO2Y COMMIS$3ON

7. m LICENSEE EVEN~ REPORT

.l @ '.

! ' 'l I

I coNTxoc stoex: !,

te East paint oR TYPE Au. REcuiREo iNeoRMATiom le it l lv I AISIPIS I 11@u0 10 l 10 IO I O I O I 0; 1 OI Ol@as4 I) 1111l1l@lsi car s, @

l l

s e ucenses coat ucama=vusan as uce=sa rv,a.

con ;

7 l L @ 01 51 01 01 01 218 I O @seO'812l318121@lOl9111 d R! d@ - - - - - -

Ietti s

si oocar =vuesa es svowi nara 3.

7s me,oarnars so e

EVEN* DESCRIPTION AND PROSABLE CONSEQUENCES h

,_ici:1 lWith the unit at full power. steam flow trr eitter FT-1-495 fnfled Inu.

Thic ic l _

, _ [5T31 I contrary to T.S.-Table 3.7.2 and is report:51e oer T.S.-6.6.2.b(2). The t

.lolai fredundant steam flow channel was operable. therefore the hen 1 th and enforv nf ek, l

I o e s i_l public were not af fected.

t.-

.. l o is i l

~

t _

_Io67Il I

_rTTr1 I I

E"

" coos" - sScEs suYe sE5os Co.nomorrcaos o6 i II El@ [E_j@ [Ej@ l Il NI SIT lR IU l@ W@

loist Z

e io n

u u

o is s

SEcuernAL OCCummENCE napoorf RevissoN LEm IVSNT YEAR 25poftf No.

CooE TYPE 88 o.

@,ag/mo i 81 21 p

10l8111 Ld lo la I y

(--l p0 2i 22 3e as 27 3

29 3i G,* YER n;i' n '

  • Mal" X @*BCCW e3%.,;*ab7 c.c.lll,en'..
  • ~

pL.z_J@ p@

p@

l 01 01 01 cf

.Ly_l@

.LE.J@ LAJ@

IT 101718 l@

n CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 27 12 p o i IThe transmitter failed due to a faulty power supply. The power supp1v was replaced.1

, g land the affected instrument channel was checked satisfactory and returned to I

g tservice.

1 tiesil I

e I

i i i. i l I

i oe8CoVERYOtsCRom o= @

'sT N

% powem ofMsm status oiscovtR*

is I [E.,j@ l Il of oI@l N/A l

L&jhl Operational Event l*

11 u

n as as so a g,, g, i

--T on activrry @ I i.ocationosnatsass@

entsAsso on a:Laase I s l [y,j @ Q'at exposuAss N/A I

N/A l

I l1 penso==

e..

I 17 6101010 l@W@l N/A

'l

~

= '

o-,':,,a,

oescrimo=@

wuwere l'8stlololol@l N/A l

ae is a

so

',T. * ",f,'!;^C "" @

lis1[g,,,j@l w/a l

8209200236.820910 so ae io R MOCK 05000280 NRC USE ONLY issue @oss: mime =@

l PDR i

i;i!;ii i 9,l=

1:i:1 ufx

. s io s.

u..ge...g...g.

..,. ; g. (804) 357-3184 5

J. L. Wilson

.1

I ATTACHMENT 1 SURRY POWER STATION, UNIT NO.1 DOCKET NO:

50-280 REPORT NO:

82-081/03L-0 EVENT DATE:

08-23-82 TITLE OF THE EVENT: FT-1-495 Failed 1.

DESCRIPTION OF THE EVENT:

With the unit at 100% power, steam flow detector FT-1-495 failed low.

This is contrary to Tech. Spec. Table 3.7.2 and is reportable per T.S.

6. 6. 2. b (2).

2.

PROBABLE CONSEQUENCES and STATUS of REDENDANT EQUIPMENT:

Each main steam line has 2 steam flow detectors that are used in conjunction with a low Tavg or low steam line pressure signal t6 initiate safety injection for steam line break protection.

The redundant steam flow channel was operable, therefore the health and safety of the public were not affected.

s 3.

CAUSE

Steam flow detector FT-1-495 failed low because the channel power supply fail ed.

4.-

IMMEDIATE CORRECTIVE ACTION

The associated bistables were placed in the trip mode and remained tripped until the channel was returned to service.

5.

SUBSEQUENT CORRECTIVE ACTION:

The failed power supply was replaced.

  • 6.

ACTION TAKEN TO PREVENT RECURRENCE:

The faulty power supply was installed in February of this year. This power supply is a new type installed in conjunction with a design change and is the first of this type to fail, therefore this event is considered random and no further actions are necessary.

7.

GENERIC IMPLICATIONS:

None.