LER-1978-032, /03L-0 on 780929:Unit 2 Main Steam Target Rock Pressure Relief Valve 2-203-3A Failed to Open While Performing Test.Caused by Broken Air Line to Valves Manual Air Operator |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2651978032R03 - NRC Website |
|
text
.
.~
O 11 LICENSEE EVENT REPORT
.,m CdNTHOL BLOCK: l l
l l
l l
lh (PLE AsE PRINT On TYPE All. REQUiFtED INFORMATION) i e
j [o}ij l l l L [Q l A l D l 2 l@! 0 l 0 l 0 l - l 0 l 0 l 0 l - l 0 l 0 l 0 l@l 4 l1 l1 l1l1 l@l lJ@
f 7
45 1s LICL ASE E COLL 14 lb LICLNSE NuYLLF.
23 26 Liis m Tvrg JO 67 CA1 b6 CON'T 3$ l Li@l015 l0 l 01.012 l 6 l 5 l@[ 0 l 9 l 2 l9 l 7 l8 l@l 1l 0l 2l 0l 7l 8 l@
O i l
7 8
60 61 DOCKET NUMBE R 68 69 EVENT DATE 74 76 REPORT DAT E 80 EVENT DE:,CRIPTION AND PROB ABLE CONSEQUENCES h l The Unit Two Main Steam Target Rock Pressure Relief Valve (2-203-3A) failed to open l
o 2 [while performing semi-annual test procedure QOS 201-1.
Unit Two was being shutdown l
0 3 10141 ( for a scheduled weekend maintenance outage at the time. Safe plant operation was l
I not af fected since HPCI and the remaining four auto-pressure relief valves were l
O s l O 16 I l operable.
g O 7 l
I Fhi i l
80 i
7 8 9 C DE COOE S BC E COMPONENT COOE SU8 CODE S
E ITTil I c I c IO LEJ@ LaJ @ l V l A l L lV lE lX l@ W@ W @
7 8
9 to 11 12 IJ 18 19 20 SE QUE NTi AL OCCURRENCE REPORT REVISION LE R/RO EVENT YEAR REPORT NO.
CODE TYPE NO.
O,at=
l 7l 8I l--J l01312l [g.J l 0l 3I
[_L,_j
(--J [0,J u
21 22 23 24 26 27 28 29 30 31 32 TKN ACilO ON PL NT MET HOURS 22 58 if FO 8.
SUPPL R MANUFACTURER W Ql Zl@
l Zl@
W@
l0l0l0l0l QJg [Yj@
W@
Ql0l2l0l@
33 34 35 36 37 40 41 42 43 44 47 j
CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h A
IThe cause of this occurrence was due to a broken air line to the valve's manual air l
i O i i l operator. The corrective action taken was to repair the broken air line. The L ! 2-203-3A valve wa's subsequently tested during unit startup and proven operable.
I f
~
i a l I
l' l
i 4 7
8 9 80 STA $
% POWER OTHER STATUS ts O RY DISCOVER ( CE SCRIPTION [Dj@ l 0l 2l 3l@l NA l
W @l Routine Test l
i s A T1VITY CO TENT AMOUNT Or ACTIVITY h l LOCATION OF REtEASE h nrtEASED Or RELEASE
@ [Zj l
NA
[
NA l
)
1 6 l
7 8 9 10 il 44 45 80 PERSONNEL EXPOSUnES 7811240 M.-
l NUY8ER TYPE
DESCRIPTION
[0] 0 l Oj@[Zjhl i 7 NA PERSONNE L INJU IES NUMBER O E SC RIPTION l Ol 0l Ojhl NA l
i a 7
a o it 12 80 Loss OF OR DAMAGE TO FACILITY TvPE DE SC hip TION LzJ@l NA I
' 9 7
8 9 10 80 NA l
lllIlllllIlll%
ISSUE
DESCRIPTION
12101 Luj81 2
i 8 9 10 68 69 80 ;
{
NAME OF PREPAnEn M.
Reed PHONE:._3_09-654-2241. ext 252
-=mm--_-..----%,
__m--,._.-.-_r,,,-_r---,,m,-,-m%m
.7,_.7
,,.-n e
- - y
- - 7 m,
,. ~ y3--n y
1.
LER NUMBER:
LER/R0 78-32/03L-0 ll.
LICENSE NAME:
Commonwealth Edison Company Quad-Cities Nuclear Power Station Ill.
FA_CILITY NAME: Unit Two IV.
DOCKET NUMBER: 050-265 V.
EVENT DESCRIPTION
On September 29, 1978, Unit Two Main Steam Target Rock Pressure Relief Valve (2-203-3A) failed to open while performing semi-annual test procedure QOS 201-1.
When the unit operator placed the key switch to the MANUAL position, he received a dual Indication on the valve position Indicating Ilghts, and
(
observed only a 5* compensating closure of the full open Main Steam B/ pass Valve. The operator again atten.pted to open the relief valve, but no change in bypass valve position was observed.
Unit Two was in the RUN mode at a thermal power of 570 MWt.
The Unit was being shutdown for a scheduled weekend maintenance outage.
VI.
PROBABLE CONSEQUENCES OF THE OCCURRENCE:
The consequences of this occurrence were minimal since redun-dancy has been provided in the automatic pressure reIIef function, in that only four of the five relief valves are I
required to operate. All four Electromatic Relief Valves were tested and found to be operable. Thus, loss of one of the i.
relief valves does not materially affect the pressure relieving capability of the automatic pressure relief system. Also, the g
four Electromatic Relief Valves were capable of actuating in F-the event of an ECCS auto blowdown initiation. The safety mode of the 2-203-3A Target Rock Valve was unaffected and would have opened at designed pressure conditions.
Vll.
CAUSE
The 2-203-3A relief valve failed to open due to a broken stainless steel air line to the diaphragm of the valve operator.
The air line was found broken at the valve.
The 2-203-3A safety relief valve, Model 67F, is manufactured by Target Rock Corporation.
4 Vllt.
CORRECTIVE ACTION
Work Request number 4529-78 was written to repair the broken air line. The end of the air line was rethreaded and reattached to the valve.
On October 1, 1978, while Unit Two was returning to power, the 2-203-3A relief valve was again tested and pioven to operate properly.
Since this is the first failure of this type, no further actions are deemed necessary.
9
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000254/LER-1978-010-03, /03L-1 on 780420:during Routine Hydraulic Snubber Surveillance Inspec,Snubber Mark 149 Was Found Inoper Due to Empty Fluid Reservoir & Mark 144 Was Found W/Missing Cotter Pin,Due to Component Failure | /03L-1 on 780420:during Routine Hydraulic Snubber Surveillance Inspec,Snubber Mark 149 Was Found Inoper Due to Empty Fluid Reservoir & Mark 144 Was Found W/Missing Cotter Pin,Due to Component Failure | | | 05000254/LER-1978-010, Forwards LER 78-010/03L-1 | Forwards LER 78-010/03L-1 | | | 05000254/LER-1978-026, Forwards LER 78-026/03L-0 | Forwards LER 78-026/03L-0 | | | 05000254/LER-1978-026-03, /03L-0 on 780920:A RHR Room Watertight Door Found Open.Caused by Contractor Personnel Ignorance. Personnel Admonished to Heed Procedures at All Times | /03L-0 on 780920:A RHR Room Watertight Door Found Open.Caused by Contractor Personnel Ignorance. Personnel Admonished to Heed Procedures at All Times | | | 05000254/LER-1978-027-03, /03L-0:on 780928,diesel Fuel Transfer Lines 1-5201 & 1-5204 Taken Out of Svc to Replace Two Pipe Sections.Sys Returned to Svc on Same Day | /03L-0:on 780928,diesel Fuel Transfer Lines 1-5201 & 1-5204 Taken Out of Svc to Replace Two Pipe Sections.Sys Returned to Svc on Same Day | | | 05000254/LER-1978-027, Forwards LER 78-027/03L-0 | Forwards LER 78-027/03L-0 | | | 05000254/LER-1978-028, Forwards LER 78-028/03L-0 | Forwards LER 78-028/03L-0 | | | 05000254/LER-1978-029, Forwards LER 78-029/03L-0 | Forwards LER 78-029/03L-0 | | | 05000254/LER-1978-029-03, /03L-0 on 781025:smoke Detectors Were Removed from Svc in Cable Spreading Room,Elec Equip Room & Control Room for Installation of New Fire Detection/Suppression Sys | /03L-0 on 781025:smoke Detectors Were Removed from Svc in Cable Spreading Room,Elec Equip Room & Control Room for Installation of New Fire Detection/Suppression Sys | | | 05000254/LER-1978-030-03, /03L-0 on 781026:dual Position Indication Was Received for Supression Chamber to Drywell Vacuum Breaker, Valve 1-1601-33E.Caused by Position Indication Problem | /03L-0 on 781026:dual Position Indication Was Received for Supression Chamber to Drywell Vacuum Breaker, Valve 1-1601-33E.Caused by Position Indication Problem | | | 05000265/LER-1978-030-03, /03L-0:on 780831,main Steam Line Radiation Monitor 2-1705-2D Failed Downscale.Caused by Instrument Drift & Elevated Chassis Ambient Operating Temp | /03L-0:on 780831,main Steam Line Radiation Monitor 2-1705-2D Failed Downscale.Caused by Instrument Drift & Elevated Chassis Ambient Operating Temp | | | 05000265/LER-1978-030, Forwards LER 78-030/03L-0 | Forwards LER 78-030/03L-0 | | | 05000265/LER-1978-031-03, /03L-0:on 780910,during Testing,Msiv 2-203-3c Failed to Give Half Scram in Reactor Protection Sys Channel B.Caused by Equipment Failure.Msiv Inspected & Adjustor Arm Adjusted | /03L-0:on 780910,during Testing,Msiv 2-203-3c Failed to Give Half Scram in Reactor Protection Sys Channel B.Caused by Equipment Failure.Msiv Inspected & Adjustor Arm Adjusted | | | 05000254/LER-1978-031-03, /03L-0 on 791122:pressure Switch 1-5600-PS-3 to Failed During electo-hydraulic Control Pressure Sensor Functional Surveillance Due to Setpoint Drift.Switch Was Recalibr | /03L-0 on 791122:pressure Switch 1-5600-PS-3 to Failed During electo-hydraulic Control Pressure Sensor Functional Surveillance Due to Setpoint Drift.Switch Was Recalibr | | | 05000254/LER-1978-031, Forwards LER 78-031/03L-0 | Forwards LER 78-031/03L-0 | | | 05000265/LER-1978-031, Forwards LER 78-031/03L-0 | Forwards LER 78-031/03L-0 | | | 05000265/LER-1978-032, Forwards LER 78-032/03L-0 | Forwards LER 78-032/03L-0 | | | 05000254/LER-1978-032, Forwards LER 78-032/03L-0 | Forwards LER 78-032/03L-0 | | | 05000254/LER-1978-032-03, /03L-0 on 781218:calibr & Functional Test for Drywell Pressure Instruments PS1-1001-89 a Thru D Found Not in Accordance W/Tech Specs.Caused by Instrument Drift | /03L-0 on 781218:calibr & Functional Test for Drywell Pressure Instruments PS1-1001-89 a Thru D Found Not in Accordance W/Tech Specs.Caused by Instrument Drift | | | 05000265/LER-1978-032-03, /03L-0 on 780929:Unit 2 Main Steam Target Rock Pressure Relief Valve 2-203-3A Failed to Open While Performing Test.Caused by Broken Air Line to Valves Manual Air Operator | /03L-0 on 780929:Unit 2 Main Steam Target Rock Pressure Relief Valve 2-203-3A Failed to Open While Performing Test.Caused by Broken Air Line to Valves Manual Air Operator | | | 05000254/LER-1978-033, Forwards LER 78-033/03L-0 | Forwards LER 78-033/03L-0 | | | 05000254/LER-1978-033-03, /03L-0 on 781219:during Automatic Isolation of Ventilation Sys,Inlet Isolation Dampers 1-5741 a & B Failed to Close.Pilot Solenoid on Air Operator of Damper Valves Stuck & Failed to Supply Air Signal Needed to Close Valve | /03L-0 on 781219:during Automatic Isolation of Ventilation Sys,Inlet Isolation Dampers 1-5741 a & B Failed to Close.Pilot Solenoid on Air Operator of Damper Valves Stuck & Failed to Supply Air Signal Needed to Close Valve | | | 05000265/LER-1978-033-03, /03L-0 on 780930:during Routine Snubber Surveillance inspec,2 Snubbers Were Found to Be Inoperable. Both Mark 183 & Mark 175 Snubbers Failed Due to Hydraulic Leakage Thru Hardened O-rings | /03L-0 on 780930:during Routine Snubber Surveillance inspec,2 Snubbers Were Found to Be Inoperable. Both Mark 183 & Mark 175 Snubbers Failed Due to Hydraulic Leakage Thru Hardened O-rings | | | 05000265/LER-1978-033, Forwards LER 78-033/03L-0 | Forwards LER 78-033/03L-0 | | | 05000265/LER-1978-034-03, /03L-0 on 781002:while Performing Procedure Qts 130-4,Control Rod Drive Scam Timing Control Rod N-10(50-39) Failed to Scram Upon Receiving a Test Signal from Panel 902- 16.Caused by Failure of 118 Scram Solenoid Valve | /03L-0 on 781002:while Performing Procedure Qts 130-4,Control Rod Drive Scam Timing Control Rod N-10(50-39) Failed to Scram Upon Receiving a Test Signal from Panel 902- 16.Caused by Failure of 118 Scram Solenoid Valve | | | 05000265/LER-1978-034, Forwards LER 78-034/03L-0 | Forwards LER 78-034/03L-0 | | | 05000265/LER-1978-035-03, /03L-0 on 781004:Unit 2A Reactor Vent Radiat Monitor & 2A Refueling Floor Radiat Monitor Started Spuriously Spiking.Caused by Faulty Pwr Supply Common to Both 2A Monitors.Pwr Supply Replaced W/Spare Monitor | /03L-0 on 781004:Unit 2A Reactor Vent Radiat Monitor & 2A Refueling Floor Radiat Monitor Started Spuriously Spiking.Caused by Faulty Pwr Supply Common to Both 2A Monitors.Pwr Supply Replaced W/Spare Monitor | | | 05000265/LER-1978-035, Forwards LER 78-035/03L-0 | Forwards LER 78-035/03L-0 | | | 05000265/LER-1978-036-03, /03L-0 on 781016: 1 Core Spray low-low Level Initation Switch Failed to Trip at Proper Setpoint, Caused by Instru Drift | /03L-0 on 781016: 1 Core Spray low-low Level Initation Switch Failed to Trip at Proper Setpoint, Caused by Instru Drift | | | 05000265/LER-1978-036, Forwards LER 78-036/03L-0 | Forwards LER 78-036/03L-0 | | | 05000265/LER-1978-037, Forwards LER 78-037/03L-0 | Forwards LER 78-037/03L-0 | | | 05000265/LER-1978-037-03, /03L-0 on 781116:Unit 2 Reactor Bldg to Suppression Chamber Vacuum Breaker Valve 2-1601-20A Failed to Open.Caused by Failure of Air Line Solenoid Operator (Valve 2-1601-50A) | /03L-0 on 781116:Unit 2 Reactor Bldg to Suppression Chamber Vacuum Breaker Valve 2-1601-20A Failed to Open.Caused by Failure of Air Line Solenoid Operator (Valve 2-1601-50A) | | | 05000265/LER-1978-038-03, /03L-0 on 781125:during Normal Operation,Drywell Vent Valve AO-1601-23 Would Not Open.Mechanical Failure of Solenoid Air Supply Valve SO 2-1601-52A Prevented Operation of Drywell Vent Valve.Solenoid Valve Was Replaced & Test | /03L-0 on 781125:during Normal Operation,Drywell Vent Valve AO-1601-23 Would Not Open.Mechanical Failure of Solenoid Air Supply Valve SO 2-1601-52A Prevented Operation of Drywell Vent Valve.Solenoid Valve Was Replaced & Tested | | | 05000265/LER-1978-038, Forwards LER 78-038/03L-0 | Forwards LER 78-038/03L-0 | | | 05000265/LER-1978-039-03, /03L-0 on 781218:test Results Found HPCI Initiation Switches Associated W/Drywell Pressure Instruments Not in Accordance W/Tech Specs.Caused by Procedural Inadequacy;Switches Excluded from Test Program | /03L-0 on 781218:test Results Found HPCI Initiation Switches Associated W/Drywell Pressure Instruments Not in Accordance W/Tech Specs.Caused by Procedural Inadequacy;Switches Excluded from Test Program | | | 05000265/LER-1978-039, Forwards LER 78-039/03L-0 | Forwards LER 78-039/03L-0 | | | 05000265/LER-1978-040, Forwards LER 78-040/03L-0 | Forwards LER 78-040/03L-0 | | | 05000265/LER-1978-040-03, /03L-0 on 781221:during Main Steam Line Low Pressure Isolation Surveillance,Pressure Switch PS-2-261-30C Tripped Below Tech Spec Min.Caused by Instrument Drift.Pressure Switch Recalibrated | /03L-0 on 781221:during Main Steam Line Low Pressure Isolation Surveillance,Pressure Switch PS-2-261-30C Tripped Below Tech Spec Min.Caused by Instrument Drift.Pressure Switch Recalibrated | |
|