ML20024D224
| ML20024D224 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 09/30/1981 |
| From: | Leblanc R BRAND-REX CO. |
| To: | |
| Shared Package | |
| ML20024D198 | List: |
| References | |
| REF-PT21-83 OI-008, OI-8, NUDOCS 8308030334 | |
| Download: ML20024D224 (6) | |
Text
_
o*
- b I
'j APPROVA_S
- REV S ONS MANUFACTURING PROCEDURE:
SilORTING INSTRUCTIONS FOR MANUFACTURING SPLICES 008 OPERATING INSTRUCTION:
DATE:
9/81 INITIAL RELEASE REVISION DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
I DATE:
e DATE:
DATE:
f DATE:
9/81 MRITTEN BY: R. A. LEBLANC JtEV D BY h
l'I\\
/
/
DATE:
AREA MANAGER:
M 7s DATE:
[/
E ER t 11ANAGER:
DATE:
V I
[
QUALITY ASSURANCE tiANAGER: A G/J f
/
_ /
APPROVED f
DATE:h
/ h Mi
/
77 PLANT MANAGED-c, y -
I u
b g
B308030334 830727 PDR ADOCK 05000312 s
\\
S q
3R
,3n
Elf:ctiva Data Number l
9/81 01-008 Page Revision pgg 1 of 5
S
SUBJECT:
SilORTING INSTRUCTIONS FOR MANUFACTURING SPLICES 1.0 PURPOSE To give instructions for the proper method of shorting a cable 1.1 l
l so that nanufacturing splices are detected and removed prior to l
shipping.
2.0 APPLICATION Applies whenever one or more components are spliced.
2.1 Cables are spliced for efficiency and economy of production NOTE:
at various operations. All splices are made for manufacturing I
i All purposes only and will be removed prior to shipment.
i j
splices will be shorted in the manner described in this
[I instruction to insure detection and removal.
i I
3.0 RESPONSTBILITY All personnel who produce splices will be familiar with and 3.1 follow this instruction.
3.2 Area supervisors will assure that responsible personnel are familiar with and follow this instruction.
l 4.0 ASSOCIATED MATERIALS uninsulated wire I
4.1 Pine gauge, 4.2 Yellow tape 6C PM 210 040
EF FECTIVE DATE NUMBER 9/81 07-008 SUBJECT. SilORTING INSTRUCT. IONS FOH FANUFACTURING SPLICES 2 OF 5
0 5.1 Remove the insulation from the c,onductors adjacent to the splice.
t (See Figure I) l In cables with three or less conductors, expose all of the a minimum In cables with four or more conductors, conductora.
of three conductors will be exposed.
The above applies to the o.utside 1ayer of a cable, also, even if the splice is on the
~
Inner layer.
FIGURE 1 e,
i I
i i
e
^
m S
\\
e tk ll l
I l
- U^
SUBJECT:
sitonTIrJG INSTPtiCTIONS FOR 9/8 01-008 PAGE REVISION l
MANUFACTUR1tJG SPLICl S 3 OF 5
~
p l
['
5.2 Wrap the cable at the exposed point with a fine gauge I
uninsulated wire, making sure that the wire makes contact with the exposed conduct. ors. (see Figure II) s i
FIGURT: TI I
f*. -
'a
=
aY$m-.
.fG
,4
,N
?j r
8 T.'
i'
)
...r '/ h l
p, _
I i
\\h
'1 5'
I
SUBJECT:
SHORTING INSTRUCTIONS FOR 9/81 0I-008 l
PAGE REVISION b
MANUFACTURING SPLICES 4 OF 5 f
\\
/
5.3 Apply a single wrap of yellow tape, approximately six (6) inches I
from each side of the splice to, serve as a visual flag.
1 (See Figure III) f FIGURE III i
9 r
I e
,)$k!b.hsidhk
3.
bh)klhj$7
.VM4 M9gf t up p @s w ;n.gg e$p 3:
pa p
A.. v e.ss.m. + g., ny Y?;i[{t b,',ih.'p; k,.,,, e g&.),Vrj.,;. y\\ ff
.. t,,
- a..
y kt gf.Y* $?'
L.
gdf*
4 M
53 PM 210441
- ~
e EF FECTIVE DATE NUMBER i
SUBJECT:
SHORTING INSTRUCTIONS FOR PAGE REVISION MANUFACTURING SPLICES 5
OF 5 9
5.4 Insert a colored flyer at the splice on the take up reel.
' ~ ~ '
l (See Figure IV)
FIGURE IV l
l i
r l
i 1
I l
..'i..,'.:. t.
^
~
/
4, g
=-
?A.
l
^
$f
)
I r'
- , /,,
'f l /
l
/; [j'
'/
h I
'g jj Record the lengths on the appropriate paperwork.
l 5.5 i
r L
i l
l
/3 I M 5"f PM-210441
_ _ _., - -. _ _ _ - _