ML20024D214
| ML20024D214 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 09/30/1981 |
| From: | Leblanc R BRAND-REX CO. |
| To: | |
| Shared Package | |
| ML20024D198 | List: |
| References | |
| REF-PT21-83 OI-054, OI-54, NUDOCS 8308030311 | |
| Download: ML20024D214 (3) | |
Text
!
,_ s o
A3PROVA_S
- REV S ONS i
MANUFACTURING PROCEDURE:
MArlUFACTURIIIG SPLICE 054 OPERATING INSTRUCTION:
ACCOUNTABILITY PROCEDURE DATE:
9/81 INITIAL __ RELEASE REVISION DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
Q DATE:
DATE:
l DATE:
- ^*
DATE:
WRITTEN BY:
O REVI del;T)BY DATE:
h[
AREA MANAGER:
d.
- J1t, j
E N
RN 14ANAGER:
c M
DATE:
- /
C)!B/
DATE:
QUALITY ASSURANCE fiANAGE Uj
' ].9 '
/
APPROVED
,/
PLANT MANAGER./ M
/
DATE:
//
/
~v 8309030311 830727 O--
j39
-- p.
v
~
_w Eff:ctiveDats s Numbar
_ O T-O cid 9/91 fhvision Pag 3
~ 2, REX 1_
- of 2
'~
~~
SUBJECT:
MANUFACTURING SPLICE ACCOUNTABILITY PROCEDURE s
s s,.. -
l.0 PURPOSE t
t s.
To provide instructions to insure that no manufactu$ igg.
1.1 splices reinain in the product. af ter th? -manuf acturing process.
- \\
~
+
~;.
.. s ~
~.
- s. s
'J*
2.0 APPLICATION / RESPONSIBILITY s
This procedure applies to those manufacttiring departments 2.1 N
s and personnel that introducc,, discover, and/or?, process
.s 1
\\
7
, ~
\\
q -
}
- s splices in a product.
4 s
Cables are spliced for efficiency and economy of production 2.2 y-at various operations'. All pplices are made for mhnufacturi,ng->
a m.
s purposes only and shall be removed prior to shi ren$.
F e
N b.
0**'
3.0 PROCEDURE
,4 s}
g ;
4 All splices will be made in accordance with Operating f
(
3.1 Instruction 007 or 008, as applicable.,
s Products containing splices will be so identified.
3.2 All splices will be identified 'at the oper' tion where they a
3.3 are made in accordance with Operating Instruction 007 or 008, as applicpble, l
All splices will be m&do to short out when voltaJe tested,.
3.4 w
per Operating Instrtictio'n,007 or 008, as applicable.
All splicen will be documented on appkopriate forms, rec 1 3.5 tags, production. records, packing lists, etc.
s a.
6 w
\\
4 A35 PM 210440
-n.
l x
s
.jw.
g EFFECTIVE DATE NUMDER SUDJECT:
- a'
~
MANUFACTURING SPLICE 9/81 OI-054 PAGE REVISION ACCOUNTABILITY PROCEDURi 2
OF 2 8
s
- ~,),
Individual lengtns of product will be' listed on appropriate V[ 3.6 1
c.
forms prior to delivering paperwork to the next operation.
3.7 The responsible manufacturing department will assure that all splices are removed prior to the final High Voltage test.
s 3.8 All splices will be brought to the attention of the area e
supervisor.
e 4g
\\
i 1
4 9
g
\\
e bs i.
4 3
n.
t.
4
\\
1 l
4 A
4, Aw s
i l
l s-i
.T e
S a
- m 4
(X
{
I A
pM.214441
^ AJ A I
.il
=
)
8 9
I s,
,A