Text
_
(
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 12151 841-4 5 o 2 v ecten tssotNT May 4, 1983 Mr. James R. Tourtellotte Chairman Regulatory Refo m Task Force United States Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Tourtellotte:
Your letter of February 8, 1983, to John H. Austin, Jr.
has been referred to me for response. My staff has examined the costs associated with the units at our Peach Bottom Station and has provided the attached tabulations in a format similar to your examples.
The backfitting of a nuclear power plant with new systems and equipment is not only expensive but is also time consuming and technically challenging.
I hope your efforts result in improvements in the regulatory process so that the cost, time, and effort involved in plant changes are recognized from the outset for compariron with the potential benefits.
l Don't hesitane to contact us again if~ you need additional ~'
information.
Sincerely,
/
Attachments i
I l
l 8307080352 830622 PDR REVGP NRCREG j
\\
y--
r
~
Peach Bottan Atanic Power Plant, Units 2 & 3 Actual Cost of Backfitting
'Ibtal '1hrough De rnber 31, 1982 (Not including AEUDC)
N (a) Costs for NBC Inposed Backfitting ($1000's) 1.
Hardware
$136,702 2.
Analytical 2,683
'Ibtal
$139,385 (b) Costs for NBC 'IMI Iessons leaned Backfitting ($1000's) 1.
Hardware
$18,766 2.
Analytical 2,219 Total
$20,985 (c) Costs for Utility Initiated Backfitting ($1000's) 1.
Hardware
$45,094 i
i l
, (a) Costs for NRC Irposed Backfitting - Detail
($1000's) 1.
HARDWARE Install two additional cooling towers 18,916 High density spent fuel racks 5,637 Insh1'ation of plant security syst m 8,761 Install startup bypass valve on one reactor feed pcip valve (NUREG 0619) 793 Autmatic isolation of RHR sanple line 654 Add radiation nonitors on HPSW systm 817 Upgrade conhi-nt vent & purge valves 386 Purge and pressure protection 320 CRD scram dischrge volume nodifications (IE Bulletin 80-17) 3,305 Digital meteorological equipnent 429 Upgrade of cor:puter facilities 719 Repla feedwater spargers 11,223 Iodine ronitoring system and equipnent 132 Mxiify & analyze masonry walls (IE Bulletin 80-11) 975 Solid radwaste facilities 2,948 Mark I containment nodifications 64,835 Fire protection inprovements 1,841 Seismic nonitoring instrumentation 262 Work associated with IE Bulletin 79-14 4,285 Work associated with IE Bulletin 79-02 8,369 3
All atium et L,-
WM=
1 095 Hardware Total SI3 N 2.
ANALYfICAL Control of Heavy loads (NURm 0612) 727 EmrL.Onmeni.al Omlification (IE Bullentin 79-OlB) 1,366 Atypical welds (IE Bulletin 78-12) 276 Miscellaneous srall tasks 314 Analytical 'Ibtal
$2,683 Hardware and Analytical Total
$139,385
j cA (b) Costs for NIC 'IMI Iessons learned Backfitting - Detail
($1000's) 1.
HARDWARE Provide ecznputerized valve nonitoring system 3,535 Install SRV position indicator 762 Modify containment isolation provisions 909 Drywell high range radiation nonitors 506 Autcrnatic switchover section 186 Accident nonitoring instrumentation system 769 Addition of reactor water recorder 194 Emergency public alert system 1,502 Ibergency facilities 2,777 Safety grade air supplies 2,627 Post accident sanpling 3,785 c'r - mication facilities 564 Effluent nonitor upgrade 180 Inprovements in control recm habitability-(Sodium hypochlorite system) 379 All other NIC 'IMI lessons learned Backfitta.ng 91 Hardware Total
$18,766 2.
ANALYI'ICAL
'IMI, Post 'IMI (NUREG 0737 etc.)
874
')
t_ _. y '
1 345 Analytical 'tbtal M.
Hardware and Analytiical Total
$20,985 i
_4-(c) Cost for Utility Initiated Backfitting - Detail
($1000's) 1.
HARDWARE Piping replacement or remwal due to intergranular stress corrosion cracking 4,611 Radwaste system inprovements 625 LLRT provisions 286 Interphase seismic Q-LDgrade 578 Install bo stop valves in turbine bleed lines 1,284 Provide breathing air headers 597 IIRT dewpoint instrumentation 259 New sewage treatment plant 1,297 Peroute HPCI & RCIC irtoard valve cables 539 Modify reactor water clean-up system 310 Reroute CAD systs cables 1,156 Reroute isolation valve cables 640 Support facilities 5,111
'Ibols, furniture, test equipnent 943 Feedwater system 1,384 Cooling towers 2,081 Ocxuputer facilities 381 Off-Gas system 3,716
'Iwo 1065 FW units - cmpletion work 16,196 All'.other utility initiated backfitting 3,100 i
Ha-= 22tal.
$45,094 s
ARD:mjb 4/26/83-1
W Peach Bottm Atcznic Power Station - Units 2 & 3 Projected Additional Costs for NIC Inposed Backfitting Requirenents - Existing and Future Projects (a) NBC Inposed Backfitting (S1000's)
Fire protection: cable spreading rocrns and renote shutdown areas 20,058 Piping and valve changes (appendix J) 694 A'IWS nodifications 11,182 Increased spent fuel pool capacity 15,580 Mark I containment nodifications 14,600 Total
$62,114 (b) 'IMI Lessons Isarned Backfitting Accident ronitoring instrumentation (NUREI Guide 1.97) 4,828 Safety parameter display system (NURKi 0737) 1,120 Total S5,948 5
'Ibtal Cost for Future Backfitting S68,062 i