_ _ _ _ - _ _____

l f NBAGARA MOHAWK POWER CORPORATION MAGARA MOHAWK soo tait soutevano west svaacuse.= v isao GERALD K. RHODE SENIOR VICE PRESDENT April 11, 1983 l

Mr. James R. Tourtellotte Chairman, Regulatory Reform Task Force U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l

Dear Mr. Tourtellotte:

Your letter of February 8,1983 requested information regarding backfitting costs for our nuclear generating station. The attached material addresses your request.

Yours truly,

- x , 0/1, x raid K. R ode av Attachment 8307080347 830622 PDR REVGP IGt9REO PDR

t NIAGARA M0 HAWK POWER CORPORATION BACKFITTING COST EXPERIENCE FOR NINE MILE POINT 3TATION UNIT 1 - +.

Nine Mile Point Unit I has a net dependable capacity of 610 MWe. Commercial operation commenced in December 1969. The total cost of the unit was $164.2 million, equivalent to approximately $270 per KW.

Backfitting costs for Nine Mile Point Unit 1 through June 30, 1982 have been

$171.6 million. These costs can be allocated as $77.5 million for NRC imposed backfitting other than TMI lessons learned; $8.9 million for TMI lessons learned backfitting; and $85.2 for utility initiated backfitting. An additional backfitting cost of $125 million is anticipated for the Nine Mile Point Unit 1 to satisfy the existing and projected projects required by the NRC. A listing of the major previous backfitting costs is provided in Table 1, while the projected backfitting costs are shown in Table 2.

o

=

l e

. 1 l

Table 1

.Nine Mile Point Unit 1 Actual Cost of Backfitting Total through June 30, 1982 Total Expenditure Summary (thousands of dollars)

~

77,480 a) Costs for NRC Imposed Backfitting 8,854 b) Costs for hRC TMI Lessons Learned Backfitting 85,220 c) Costs for Utility Initiated Backfitting 171,554 Total Backfitting Costs Detail a) Costs for NRC Imposed Backfitting 7,099 Security 11,323 Off Gas Modifications 1,984 Containment Atmosphere Dilution 998 Document Control Program 4,132 Explosion Testing 477 Containment Pump System 584 Anticipated Transient Without Scram 3,247 NRC Bulletin 79-14 4,714 Scram Discharge Volume Modification 621 Local Power Range Monitors 7,192 Torus Modification 764 ,

Replace Spargers 15,705 Fire Protection 12,885 Mark I Containment 2,351 Administration Building 872 Equipment Qualification 2,532 All Other NRC Imposed Backfitting 77,480 Total Costs for NRC Imposed Backfitting O

Table 1 Nine Mile Point Unit 1 Actual Cost of Backfitting Total through June 30, 1982 4

Total Expenditure

- - Summary (thousands of dollars) b) Costs for*NRC TMI Lessons Learned Backfitting Relief Valve Position 809 To TMI Plant Shield 131 Containment Accident Monitoring 157.

Process Computer 566 Instrument Inadequate Core Cooling 705 Increase Range Radiation Monitor 780 Drywell Automatic Isolation Valves 1,165 Administration Building 110 TMI Related Emergency Vent Modification 560 Post Accident Sampling 1,635 On-Site Technical Support Center 994 Appendix E Modifications 1,242 Total Costs for NRC TMI Imposed Backfitting 8,854 c) Costs for Utility Initiated Backfitting Modify Rehea.ter Drain 1,372 Increase Rating 2,176 Incore Detectors 638 Suppression Chamber 236 ,

Refuel Crane Access 348 Hydraulic Guide 463 Change R915 305 125 Ton Redundant Hoist 606 Reactor Building Extension 600 Resin Cleaners 332 Reactor Head Safe Ends 554 Clean Up Pipe System Replace 234 Feedwater Pump Clutch 262

< Shield Inspection Platform 217 e

i

Table 1

'Nine Mile Point Unit 1 Actual Cost of Backfitting Total through June 30, 1982 Total Expenditure

- Detail (thousands of dollars)

(Continued) c) Costs for Utility Initiated Backfitting Clean-Up Pipe Modification 546 Spent Fuel Storage 1,197 Reactor Protection System 602 Replace Control Rod Drive 552 Turbine Buckets 942 Reactor Pipe Replacement 1,803 Bulk Core Memory 477 Feedwater Spargers 3,215 Recirculation Valve Replacement 213 Breathing Air Compressor 241 Torus Saddles 4,206 Rod Position Infcrmation System 845 Replace Control Rod Blades 562

. 5th High Pressure Feedwater Heater 1,223 Core Spray Modification 824 Add Automatic Isolation Valves 1,164 Recirculation Pump #15 Decontamination 456 Snubber Replacement 2,114 Reactor Head Stud Tension 575 Core Spray Sparger 411 ,

Process Computer 1,698 Reactor Safe Ends 882 Improve Fuel Bridge 285 Radwaste Solidification & Storage Building 28,598 Torus Water Quality Control 206 Administration Building 1,212 Meteorlogical Tower & Computer 1,456 Security / Radiation Exposure /Maint. System 1,637 Reactor Safe End Replacements 1,410

  1. . . . . _ . . . . . _ . - ~ . . . _ . . . . .
  • ' f$

& Q o

/Nn, h M) pf77 'V 4 IMAGE EVALUATION TEST TARGET (MT-3)

//jj// /

'/"#[U /g, ,

9777p-

  1. (+\ , f) ,p zz

+ * '

I l.0 22 W l;;fl LE i.i [m li!!M 1.8 l

l 1.25 1.4 l 1.6 I I 4 150mm -- >

4- 6" >

m$ %s$ y O

/n+dh A+ u 4*'

4

Table 1 Nine Mile Point Unit 1 Actual Cost of Backfitting Total through June 30, 1982 Total Expenditure Detail (thousands of dollars)

(Continued) c) Costs for Utility Initiated Backfitting Install Equipment for Improvements of Waste Loading Facility 11,848 All Other Utility Initiated Backfitting 5,477 Total Costs for Utility Initiated Backfitting 85,220 E

e 9

4 a

l l .

i Table 2 Nine Mile Point Unit 1 Projected Additional Future Costs for NRC Imposed Backfitting Requirements Projected 5 Millions Year Per Year 1983 20 1984 15 i l

1985 15 1986 15 1987 15 1988 15 1989 15 1990 15 4

g 'I W

e 9

________._____________.________.___.____.___m____ ____..-_m______