ML20010H244
ML20010H244 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 09/17/1981 |
From: | Carey J DUQUESNE LIGHT CO. |
To: | Varga S Office of Nuclear Reactor Regulation |
Shared Package | |
ML20010H245 | List: |
References | |
TAC-43748, NUDOCS 8109240259 | |
Download: ML20010H244 (2) | |
Similar Documents at Beaver Valley | |
---|---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARL-99-146, LAR 149 to License NPF-73,requesting one-time Extension of Unit 2 Surveillance Interval for Snubber Functional Testing1999-09-22022 September 1999
[Table view]LAR 149 to License NPF-73,requesting one-time Extension of Unit 2 Surveillance Interval for Snubber Functional Testing L-99-145, LARs 263 & 138 for Licenses DPR-66 & NPF-73,revising TS Surveillance Std to Which Ventilation Charcoal Must Be Laboratory Tested as Recommended by GL 99-021999-09-20020 September 1999 LARs 263 & 138 for Licenses DPR-66 & NPF-73,revising TS Surveillance Std to Which Ventilation Charcoal Must Be Laboratory Tested as Recommended by GL 99-02 L-99-116, Application for Amends to Licenses DPR-66 & NPF-73,revising TS Surveillance Frequency for Quench & Recirculation Spray Systems Nozzle Air Flow Test from 5 Years to 10 Years,Per Guidance Provided in GL 93-051999-07-15015 July 1999 Application for Amends to Licenses DPR-66 & NPF-73,revising TS Surveillance Frequency for Quench & Recirculation Spray Systems Nozzle Air Flow Test from 5 Years to 10 Years,Per Guidance Provided in GL 93-05 L-99-103, Supplemental Application for Amend to License NPF-73, Including Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages1999-06-28028 June 1999 Supplemental Application for Amend to License NPF-73, Including Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages L-99-080, Application for Amend to License NPF-73,updating TS Heatup, Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 Efpys.Proprietary LTOP Sys Setpoint Review, Encl.Proprietary Info Withheld,Per 10CFR2.7091999-06-17017 June 1999 Application for Amend to License NPF-73,updating TS Heatup, Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 Efpys.Proprietary LTOP Sys Setpoint Review, Encl.Proprietary Info Withheld,Per 10CFR2.709 L-99-092, Application for Amends to Licenses DPR-66 & NPF-73, Relocating Seismic Monitoring Instrumentation Requirements Contained in TS 3/4.3.3.3 to Licensing Requirements Manual Based on Guidance Provided in GL 95-101999-05-27027 May 1999 Application for Amends to Licenses DPR-66 & NPF-73, Relocating Seismic Monitoring Instrumentation Requirements Contained in TS 3/4.3.3.3 to Licensing Requirements Manual Based on Guidance Provided in GL 95-10 L-99-091, Application for Amends to Licenses NPF-66 & NPF-73,revising Frequency Notation for Manual Functions Specified in ESFAS TS to More Clearly Denote Appropriate Refueling Frequency for Testing1999-05-27027 May 1999 Application for Amends to Licenses NPF-66 & NPF-73,revising Frequency Notation for Manual Functions Specified in ESFAS TS to More Clearly Denote Appropriate Refueling Frequency for Testing ML20206F7551999-05-0505 May 1999 Application for Amends to Licenses DPR-66 & NPF-73, Consenting to Transfer of Dl Ownership Interests in BVPS, Units 1 & 2 to Penn Power & Dl Operating Authority of Subject Licenses to Firstenergy Nuclear Operating Co L-99-043, LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements1999-03-16016 March 1999 LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements L-99-045, LARs 264 & 139 for Licenses DPR-66 & NPF-73,modifying TS Bases Section 3/4.7.13,by Adding Wording Which Discusses Design Bases of Sys in Greater Depth1999-03-16016 March 1999 LARs 264 & 139 for Licenses DPR-66 & NPF-73,modifying TS Bases Section 3/4.7.13,by Adding Wording Which Discusses Design Bases of Sys in Greater Depth L-99-005, Application for Amends to Licenses DPR-66 & NPF-73,changing Qualifications for Operations Mgt & Incorporating Generic Titles in TS to Eliminate Need to Develop Amend Request When Corresponding plant-specific Titles Are Changed1999-03-0303 March 1999 Application for Amends to Licenses DPR-66 & NPF-73,changing Qualifications for Operations Mgt & Incorporating Generic Titles in TS to Eliminate Need to Develop Amend Request When Corresponding plant-specific Titles Are Changed ML20199G5341999-01-18018 January 1999 LARs 220 & 88 to Licenses DPR-66 & NPF-73,revising Limiting Safety Sys Settings 2.2.1 & Associated Table 2.2-1,including Revising Nonconservative Trip Setpoints & Allowable Values L-98-241, LARs 258 & 129 to Licenses DPR-66 & DPR-73,modifying TS 3/4.8.1, AC Sources for Units & Associated Bases to Clarify EDG Fuel Oil Storage Requirements by Addition of Term Usable1998-12-24024 December 1998 LARs 258 & 129 to Licenses DPR-66 & DPR-73,modifying TS 3/4.8.1, AC Sources for Units & Associated Bases to Clarify EDG Fuel Oil Storage Requirements by Addition of Term Usable L-98-238, LARs 262 & 135 to Licenses DPR-66 & DPR-73,modifying Applicable TS & Bases by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor1998-12-24024 December 1998 LARs 262 & 135 to Licenses DPR-66 & DPR-73,modifying Applicable TS & Bases by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor L-98-213, LAR 261 for License DPR-66,modifying License Condition 2.C(9) to Allow one-time Extension of SG Insp Interval to Coincide with Thirteenth Refueling Outage or End of 500 Effective Full Power Days,Whichever Is Sooner1998-11-11011 November 1998 LAR 261 for License DPR-66,modifying License Condition 2.C(9) to Allow one-time Extension of SG Insp Interval to Coincide with Thirteenth Refueling Outage or End of 500 Effective Full Power Days,Whichever Is Sooner ULNRC-03910, Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld L-98-203, Application for Amend to License NPF-73,incorporating Temporary License Condition That Would Extend TS Surveillance Interval,Specified in Surveillance Requirement 4.8.1.1.1.b to First Entry Into Mode 4 After Cycle 7 RFO1998-10-16016 October 1998 Application for Amend to License NPF-73,incorporating Temporary License Condition That Would Extend TS Surveillance Interval,Specified in Surveillance Requirement 4.8.1.1.1.b to First Entry Into Mode 4 After Cycle 7 RFO L-98-202, Proposed LARs 246 & 116 to Licenses DPR-66 & NPF-73,deleting Two License Requirements,Modifying LCO Applicability, Modifying Three Definitions,Changing Action Statement Number & Deleting Meteorological Monitoring Spec1998-10-15015 October 1998 Proposed LARs 246 & 116 to Licenses DPR-66 & NPF-73,deleting Two License Requirements,Modifying LCO Applicability, Modifying Three Definitions,Changing Action Statement Number & Deleting Meteorological Monitoring Spec L-98-201, Application for Amends to Licenses DPR-66 & NPF-73,adding Discussion That Explains Why Use of Time Constants, Expressed as Equality Such as T = X Seconds Are Acceptable1998-10-15015 October 1998 Application for Amends to Licenses DPR-66 & NPF-73,adding Discussion That Explains Why Use of Time Constants, Expressed as Equality Such as T = X Seconds Are Acceptable L-98-185, Application for Amend to License NPF-73,eliminating Potential for non-conservative Interpretation of TS 3.1.2.8 Values for RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative Controls1998-09-24024 September 1998 Application for Amend to License NPF-73,eliminating Potential for non-conservative Interpretation of TS 3.1.2.8 Values for RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative Controls L-98-144, Application for Amends to Licenses DPR-66 & NPF-73,revising UFSAR to Address Potential Flooding of Intake Structure Pump Cubicles Shared by Both Units1998-07-13013 July 1998 Application for Amends to Licenses DPR-66 & NPF-73,revising UFSAR to Address Potential Flooding of Intake Structure Pump Cubicles Shared by Both Units L-98-143, Supplemental Application to Amend Licenses DPR-66 & NPF-73, Modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors & Was Submitted 9712191998-07-0909 July 1998 Supplemental Application to Amend Licenses DPR-66 & NPF-73, Modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors & Was Submitted 971219 L-98-146, Application for Amends to Licenses DPR-66 & NPF-73,modifying TS 3.7.1.1, SVs & Associated Bases to Incorporate Improved STS Guidance of NUREG-1431 & Recommendations of W Nuclear Safety Advisory Ltr 94-01,dtd 9401201998-07-0909 July 1998 Application for Amends to Licenses DPR-66 & NPF-73,modifying TS 3.7.1.1, SVs & Associated Bases to Incorporate Improved STS Guidance of NUREG-1431 & Recommendations of W Nuclear Safety Advisory Ltr 94-01,dtd 940120 L-98-127, LARs 256 & 126 to Licenses DPR-66 & NPF-73,modifying Channel Calibr Definition to Exclude RTDs & Thermocouples from TS Channel Calibr Requirements1998-06-19019 June 1998 LARs 256 & 126 to Licenses DPR-66 & NPF-73,modifying Channel Calibr Definition to Exclude RTDs & Thermocouples from TS Channel Calibr Requirements L-98-046, Application for Amends to Licenses DPR-66 & NPF-73,revising Engineered Safety Feature Actuation Sys Instrumentation Table 3.3-3,action 34 & Associated Bases Section1998-03-17017 March 1998 Application for Amends to Licenses DPR-66 & NPF-73,revising Engineered Safety Feature Actuation Sys Instrumentation Table 3.3-3,action 34 & Associated Bases Section L-98-048, Application for Amends to Licenses DPR-66 & NPF-73,adding New LCO 3.0.6 to Section 3/4.0, Applicability1998-03-16016 March 1998 Application for Amends to Licenses DPR-66 & NPF-73,adding New LCO 3.0.6 to Section 3/4.0, Applicability L-98-028, Application for Amends to Licenses DPR-66 & NPF-73,exempting Neutron Flux Detectors from Channel Calibr Requirements1998-03-16016 March 1998 Application for Amends to Licenses DPR-66 & NPF-73,exempting Neutron Flux Detectors from Channel Calibr Requirements L-98-016, Proposed LAR 120 to License NPF-73,allowing Increased Calculated Doses as Described in UFSAR & Request NRC Approval of Small Break Loss of Coolant Analysis Radiological Consequences Evaluation1998-01-29029 January 1998 Proposed LAR 120 to License NPF-73,allowing Increased Calculated Doses as Described in UFSAR & Request NRC Approval of Small Break Loss of Coolant Analysis Radiological Consequences Evaluation L-97-073, Application for Amend,Consisting of Proposed Change Requests 218 & 85,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors1997-12-19019 December 1997 Application for Amend,Consisting of Proposed Change Requests 218 & 85,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors L-97-052, Proposed TS Change Request 243 to License DPR-66,modifying TS Table 3.3-4 Re Emergency Bus Undevoltage Trip Setpoint, Allowable Valve & Time Delay for DG Start1997-11-0404 November 1997 Proposed TS Change Request 243 to License DPR-66,modifying TS Table 3.3-4 Re Emergency Bus Undevoltage Trip Setpoint, Allowable Valve & Time Delay for DG Start L-97-045, Application for Amend to License NPF-73,consisting of Change Request 115,modifying TS 3.4.8 by Reducing RCS Specific Activity Limits IAW GL 95-051997-10-22022 October 1997 Application for Amend to License NPF-73,consisting of Change Request 115,modifying TS 3.4.8 by Reducing RCS Specific Activity Limits IAW GL 95-05 L-97-009, Application for Amends to Licenses NPF-66 & NPF-73,changing TS to Implement line-item Improvements Provided in GL 93-08 for Removal of Response Times from TS1997-09-11011 September 1997 Application for Amends to Licenses NPF-66 & NPF-73,changing TS to Implement line-item Improvements Provided in GL 93-08 for Removal of Response Times from TS ML20217F5751997-07-28028 July 1997 Application for Amends to Licenses DPR-66,NPF-73 & NPF-58, Authorizing Holders to Possess Beaver Valley Power Station, Unit 1 & Authorizes Duquesne Light to Use & Operate Beaver Valley Unit 1 in Accordance W/Procedures ML20137C8941997-03-14014 March 1997 Proposed TS Change Requests 1A-236 & 2A-110 to Licenses DPR-66 & NPF-73,relocating TS Adminstrative Controls Re QA to QA Program Description Presented in Section 17.2 of Unit 2 UFSAR ML20147E6371997-03-10010 March 1997 Application for Amends to Licenses DPR-66 & NPF-73,modifying Specification 3.4.5 to Allow SG Tube Sleeving Using Framatome Process ML20136G2601997-03-10010 March 1997 Application for Amend to License DPR-66,consisting of Change Request 240,modifying Spec 3.4.8 by Reducing RCS Specific Activity Limits IAW GL 95-05 ML20135F9381997-03-10010 March 1997 Application for Amends 237 & 111 to Licenses DPR-66 & NPF-73,modifying TS 3.4.5 to Allow SG Tube Sleeving Using CE process.CEN-629-NP,rev 2 & CEN-629-P,rev 2 encl.CEN-629-P, Rev 2 Withheld ML20147E6241997-03-10010 March 1997 Application for Amends to Licenses DPR-66 & NPF-73,which Modifies Unit 1 Design Feature Section 5.2.1 to Add ZIRLO as Fuel Assembly Matl & Adds Ref to NRC Approved WCAP-12610 to Administrative Control 6.9.1.12 for Both Units ML20135D3861997-02-27027 February 1997 Application for Amend to License DPR-66,modifying Design Feature Section 5.3.1.2 Increasing New Fuel Storage Rack Enrichment Limit to 5 Weight % ML20132B4971996-12-13013 December 1996 Application for Amends to Licenses DPR-66 & NPF-73, Requesting Consent of NRC Under 10CFR50.80 to Indirect Transfer of Control of Interests in Plant,Units 1 & 2 Operating Licenses That Will Occur Under Proposed Merger ML20128M1301996-10-0404 October 1996 Application for Amends to Licenses DPR-66 & NPF-73 Revising Surveillance Requirements 4.1.2.3.1,4.1.2.4.1,4.5.2.b, 4.6.2.1.b & Associated Bases Sections ML20117P3241996-09-0909 September 1996 Application for Amends to Licenses DPR-99 & NPF-73, Consisting of Change Requests 226 & 98,revising Table 3.3-3 Functional Unit 4.c & Spec 3/4.5.5 & Associated Bases Section for Unit 1 & 3/4.5.4 for Unit 2 ML20117N7051996-09-0909 September 1996 Application for Amends to Licenses DPR-66 & NPF-73, Consisting of Change Requests 234 & 107,modifying Section 5, Design Features,To Include Improved STS Requirements NUREG-1431 ML20129D9971996-09-0606 September 1996 Application for Amends to Licenses DPR-66 & NPF-73,revising Tables 3.3-3,3.3-5,3.3-4,4.3-2,4.3-6,4.3-7 & Spec 3.7.1.2, Auxiliary Feedwater Sys, & Associated Bases ML20113B3301996-06-18018 June 1996 Application for Amends to Licenses DPR-66 & NPF-73, Consisting of Change Requests 235 & 109,incorporating Editorial Changes for Unit 1 & Implementing Requirements of GL 95-05 for voltage-based SG Tube Repair Criteria ML20108D0931996-04-29029 April 1996 Application for Amend to License NPF-73,consisting of Change Request 106,modifying Design Feature Section 5.3.1 to Allow Use of ZIRLO as Fuel Rod Clad Matl ML20106G9771996-03-11011 March 1996 Application for Amend to License NPF-73,consisting of Change Request 103,revising Alarm Setpoints for in-containment High Range Area Monitors & Containment Purge Monitors ML20097G0691996-02-12012 February 1996 Proposed TS Changes 225 & 96 to Licenses DPR-66 & NPF-73, Respectively,Revising SR 4.6.2.2.d of LCO 3.6.2.2, Containment Recirculation Spray Sys ML20096B0521995-12-27027 December 1995 Application for Amends to Licenses DPR-66 & NPF-73, Consisting of Change Requests 230 & 100,modifying LCO Titled, Accident Monitoring Instrumentation & Associated SRs for Unit 1 & 2 ML20095G0531995-12-15015 December 1995 Application for Amends to Licenses DPR-66 & NPF-73,removing Prescriptive Requirements of 10CFR50,Option a Re Frequencies & Test Methodology & Replacing Requirements W/Requirements of Option B 1999-09-22 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARL-99-146, LAR 149 to License NPF-73,requesting one-time Extension of Unit 2 Surveillance Interval for Snubber Functional Testing1999-09-22022 September 1999
[Table view]LAR 149 to License NPF-73,requesting one-time Extension of Unit 2 Surveillance Interval for Snubber Functional Testing L-99-145, LARs 263 & 138 for Licenses DPR-66 & NPF-73,revising TS Surveillance Std to Which Ventilation Charcoal Must Be Laboratory Tested as Recommended by GL 99-021999-09-20020 September 1999 LARs 263 & 138 for Licenses DPR-66 & NPF-73,revising TS Surveillance Std to Which Ventilation Charcoal Must Be Laboratory Tested as Recommended by GL 99-02 L-99-116, Application for Amends to Licenses DPR-66 & NPF-73,revising TS Surveillance Frequency for Quench & Recirculation Spray Systems Nozzle Air Flow Test from 5 Years to 10 Years,Per Guidance Provided in GL 93-051999-07-15015 July 1999 Application for Amends to Licenses DPR-66 & NPF-73,revising TS Surveillance Frequency for Quench & Recirculation Spray Systems Nozzle Air Flow Test from 5 Years to 10 Years,Per Guidance Provided in GL 93-05 L-99-103, Supplemental Application for Amend to License NPF-73, Including Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages1999-06-28028 June 1999 Supplemental Application for Amend to License NPF-73, Including Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages L-99-080, Application for Amend to License NPF-73,updating TS Heatup, Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 Efpys.Proprietary LTOP Sys Setpoint Review, Encl.Proprietary Info Withheld,Per 10CFR2.7091999-06-17017 June 1999 Application for Amend to License NPF-73,updating TS Heatup, Cooldown & Overpressure Protection Curves & Bases to Apply for Up to 15 Efpys.Proprietary LTOP Sys Setpoint Review, Encl.Proprietary Info Withheld,Per 10CFR2.709 L-99-091, Application for Amends to Licenses NPF-66 & NPF-73,revising Frequency Notation for Manual Functions Specified in ESFAS TS to More Clearly Denote Appropriate Refueling Frequency for Testing1999-05-27027 May 1999 Application for Amends to Licenses NPF-66 & NPF-73,revising Frequency Notation for Manual Functions Specified in ESFAS TS to More Clearly Denote Appropriate Refueling Frequency for Testing L-99-092, Application for Amends to Licenses DPR-66 & NPF-73, Relocating Seismic Monitoring Instrumentation Requirements Contained in TS 3/4.3.3.3 to Licensing Requirements Manual Based on Guidance Provided in GL 95-101999-05-27027 May 1999 Application for Amends to Licenses DPR-66 & NPF-73, Relocating Seismic Monitoring Instrumentation Requirements Contained in TS 3/4.3.3.3 to Licensing Requirements Manual Based on Guidance Provided in GL 95-10 ML20206F7551999-05-0505 May 1999 Application for Amends to Licenses DPR-66 & NPF-73, Consenting to Transfer of Dl Ownership Interests in BVPS, Units 1 & 2 to Penn Power & Dl Operating Authority of Subject Licenses to Firstenergy Nuclear Operating Co L-99-045, LARs 264 & 139 for Licenses DPR-66 & NPF-73,modifying TS Bases Section 3/4.7.13,by Adding Wording Which Discusses Design Bases of Sys in Greater Depth1999-03-16016 March 1999 LARs 264 & 139 for Licenses DPR-66 & NPF-73,modifying TS Bases Section 3/4.7.13,by Adding Wording Which Discusses Design Bases of Sys in Greater Depth L-99-043, LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements1999-03-16016 March 1999 LAR 136 for License NPF-73,revising LCO 3.7.1.3,by Increasing Min Required Volume in Primary Plant DW Storage Tank to 127,500 Gallons,By Adding New Footnote & by Revising Wording Contained in Action Statements L-99-005, Application for Amends to Licenses DPR-66 & NPF-73,changing Qualifications for Operations Mgt & Incorporating Generic Titles in TS to Eliminate Need to Develop Amend Request When Corresponding plant-specific Titles Are Changed1999-03-0303 March 1999 Application for Amends to Licenses DPR-66 & NPF-73,changing Qualifications for Operations Mgt & Incorporating Generic Titles in TS to Eliminate Need to Develop Amend Request When Corresponding plant-specific Titles Are Changed ML20199G5341999-01-18018 January 1999 LARs 220 & 88 to Licenses DPR-66 & NPF-73,revising Limiting Safety Sys Settings 2.2.1 & Associated Table 2.2-1,including Revising Nonconservative Trip Setpoints & Allowable Values L-98-238, LARs 262 & 135 to Licenses DPR-66 & DPR-73,modifying Applicable TS & Bases by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor1998-12-24024 December 1998 LARs 262 & 135 to Licenses DPR-66 & DPR-73,modifying Applicable TS & Bases by Removing Rod Position Deviation Monitor,Rod Insertion Limit Monitor,Afd Monitor & QPTR Monitor L-98-241, LARs 258 & 129 to Licenses DPR-66 & DPR-73,modifying TS 3/4.8.1, AC Sources for Units & Associated Bases to Clarify EDG Fuel Oil Storage Requirements by Addition of Term Usable1998-12-24024 December 1998 LARs 258 & 129 to Licenses DPR-66 & DPR-73,modifying TS 3/4.8.1, AC Sources for Units & Associated Bases to Clarify EDG Fuel Oil Storage Requirements by Addition of Term Usable L-98-213, LAR 261 for License DPR-66,modifying License Condition 2.C(9) to Allow one-time Extension of SG Insp Interval to Coincide with Thirteenth Refueling Outage or End of 500 Effective Full Power Days,Whichever Is Sooner1998-11-11011 November 1998 LAR 261 for License DPR-66,modifying License Condition 2.C(9) to Allow one-time Extension of SG Insp Interval to Coincide with Thirteenth Refueling Outage or End of 500 Effective Full Power Days,Whichever Is Sooner ULNRC-03910, Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld L-98-203, Application for Amend to License NPF-73,incorporating Temporary License Condition That Would Extend TS Surveillance Interval,Specified in Surveillance Requirement 4.8.1.1.1.b to First Entry Into Mode 4 After Cycle 7 RFO1998-10-16016 October 1998 Application for Amend to License NPF-73,incorporating Temporary License Condition That Would Extend TS Surveillance Interval,Specified in Surveillance Requirement 4.8.1.1.1.b to First Entry Into Mode 4 After Cycle 7 RFO L-98-202, Proposed LARs 246 & 116 to Licenses DPR-66 & NPF-73,deleting Two License Requirements,Modifying LCO Applicability, Modifying Three Definitions,Changing Action Statement Number & Deleting Meteorological Monitoring Spec1998-10-15015 October 1998 Proposed LARs 246 & 116 to Licenses DPR-66 & NPF-73,deleting Two License Requirements,Modifying LCO Applicability, Modifying Three Definitions,Changing Action Statement Number & Deleting Meteorological Monitoring Spec L-98-201, Application for Amends to Licenses DPR-66 & NPF-73,adding Discussion That Explains Why Use of Time Constants, Expressed as Equality Such as T = X Seconds Are Acceptable1998-10-15015 October 1998 Application for Amends to Licenses DPR-66 & NPF-73,adding Discussion That Explains Why Use of Time Constants, Expressed as Equality Such as T = X Seconds Are Acceptable L-98-185, Application for Amend to License NPF-73,eliminating Potential for non-conservative Interpretation of TS 3.1.2.8 Values for RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative Controls1998-09-24024 September 1998 Application for Amend to License NPF-73,eliminating Potential for non-conservative Interpretation of TS 3.1.2.8 Values for RWST & Bat Min Contained Volume & Eliminating Need for Plant Administrative Controls L-98-144, Application for Amends to Licenses DPR-66 & NPF-73,revising UFSAR to Address Potential Flooding of Intake Structure Pump Cubicles Shared by Both Units1998-07-13013 July 1998 Application for Amends to Licenses DPR-66 & NPF-73,revising UFSAR to Address Potential Flooding of Intake Structure Pump Cubicles Shared by Both Units L-98-146, Application for Amends to Licenses DPR-66 & NPF-73,modifying TS 3.7.1.1, SVs & Associated Bases to Incorporate Improved STS Guidance of NUREG-1431 & Recommendations of W Nuclear Safety Advisory Ltr 94-01,dtd 9401201998-07-0909 July 1998 Application for Amends to Licenses DPR-66 & NPF-73,modifying TS 3.7.1.1, SVs & Associated Bases to Incorporate Improved STS Guidance of NUREG-1431 & Recommendations of W Nuclear Safety Advisory Ltr 94-01,dtd 940120 L-98-143, Supplemental Application to Amend Licenses DPR-66 & NPF-73, Modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors & Was Submitted 9712191998-07-0909 July 1998 Supplemental Application to Amend Licenses DPR-66 & NPF-73, Modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors & Was Submitted 971219 L-98-127, LARs 256 & 126 to Licenses DPR-66 & NPF-73,modifying Channel Calibr Definition to Exclude RTDs & Thermocouples from TS Channel Calibr Requirements1998-06-19019 June 1998 LARs 256 & 126 to Licenses DPR-66 & NPF-73,modifying Channel Calibr Definition to Exclude RTDs & Thermocouples from TS Channel Calibr Requirements L-98-046, Application for Amends to Licenses DPR-66 & NPF-73,revising Engineered Safety Feature Actuation Sys Instrumentation Table 3.3-3,action 34 & Associated Bases Section1998-03-17017 March 1998 Application for Amends to Licenses DPR-66 & NPF-73,revising Engineered Safety Feature Actuation Sys Instrumentation Table 3.3-3,action 34 & Associated Bases Section L-98-048, Application for Amends to Licenses DPR-66 & NPF-73,adding New LCO 3.0.6 to Section 3/4.0, Applicability1998-03-16016 March 1998 Application for Amends to Licenses DPR-66 & NPF-73,adding New LCO 3.0.6 to Section 3/4.0, Applicability L-98-028, Application for Amends to Licenses DPR-66 & NPF-73,exempting Neutron Flux Detectors from Channel Calibr Requirements1998-03-16016 March 1998 Application for Amends to Licenses DPR-66 & NPF-73,exempting Neutron Flux Detectors from Channel Calibr Requirements L-98-016, Proposed LAR 120 to License NPF-73,allowing Increased Calculated Doses as Described in UFSAR & Request NRC Approval of Small Break Loss of Coolant Analysis Radiological Consequences Evaluation1998-01-29029 January 1998 Proposed LAR 120 to License NPF-73,allowing Increased Calculated Doses as Described in UFSAR & Request NRC Approval of Small Break Loss of Coolant Analysis Radiological Consequences Evaluation L-97-073, Application for Amend,Consisting of Proposed Change Requests 218 & 85,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors1997-12-19019 December 1997 Application for Amend,Consisting of Proposed Change Requests 218 & 85,modifying Source Range Neutron Flux Requirements to Allow Use of Alternate Detectors L-97-052, Proposed TS Change Request 243 to License DPR-66,modifying TS Table 3.3-4 Re Emergency Bus Undevoltage Trip Setpoint, Allowable Valve & Time Delay for DG Start1997-11-0404 November 1997 Proposed TS Change Request 243 to License DPR-66,modifying TS Table 3.3-4 Re Emergency Bus Undevoltage Trip Setpoint, Allowable Valve & Time Delay for DG Start L-97-045, Application for Amend to License NPF-73,consisting of Change Request 115,modifying TS 3.4.8 by Reducing RCS Specific Activity Limits IAW GL 95-051997-10-22022 October 1997 Application for Amend to License NPF-73,consisting of Change Request 115,modifying TS 3.4.8 by Reducing RCS Specific Activity Limits IAW GL 95-05 L-97-009, Application for Amends to Licenses NPF-66 & NPF-73,changing TS to Implement line-item Improvements Provided in GL 93-08 for Removal of Response Times from TS1997-09-11011 September 1997 Application for Amends to Licenses NPF-66 & NPF-73,changing TS to Implement line-item Improvements Provided in GL 93-08 for Removal of Response Times from TS ML20217F5751997-07-28028 July 1997 Application for Amends to Licenses DPR-66,NPF-73 & NPF-58, Authorizing Holders to Possess Beaver Valley Power Station, Unit 1 & Authorizes Duquesne Light to Use & Operate Beaver Valley Unit 1 in Accordance W/Procedures ML20148E0981997-05-28028 May 1997 Amend 204 to License DPR-66,changing TS 5.3.1.2 to Increase Max Allowable U-235 Enrichment of New Fuel Assemblies in New Fuel Storage Racks to 5.0 Weight Percent W/Tolerance of +0.05 Weight Percent ML20137C8941997-03-14014 March 1997 Proposed TS Change Requests 1A-236 & 2A-110 to Licenses DPR-66 & NPF-73,relocating TS Adminstrative Controls Re QA to QA Program Description Presented in Section 17.2 of Unit 2 UFSAR ML20136G2601997-03-10010 March 1997 Application for Amend to License DPR-66,consisting of Change Request 240,modifying Spec 3.4.8 by Reducing RCS Specific Activity Limits IAW GL 95-05 ML20135F9381997-03-10010 March 1997 Application for Amends 237 & 111 to Licenses DPR-66 & NPF-73,modifying TS 3.4.5 to Allow SG Tube Sleeving Using CE process.CEN-629-NP,rev 2 & CEN-629-P,rev 2 encl.CEN-629-P, Rev 2 Withheld ML20147E6241997-03-10010 March 1997 Application for Amends to Licenses DPR-66 & NPF-73,which Modifies Unit 1 Design Feature Section 5.2.1 to Add ZIRLO as Fuel Assembly Matl & Adds Ref to NRC Approved WCAP-12610 to Administrative Control 6.9.1.12 for Both Units ML20147E6371997-03-10010 March 1997 Application for Amends to Licenses DPR-66 & NPF-73,modifying Specification 3.4.5 to Allow SG Tube Sleeving Using Framatome Process ML20135D3861997-02-27027 February 1997 Application for Amend to License DPR-66,modifying Design Feature Section 5.3.1.2 Increasing New Fuel Storage Rack Enrichment Limit to 5 Weight % ML20132B4971996-12-13013 December 1996 Application for Amends to Licenses DPR-66 & NPF-73, Requesting Consent of NRC Under 10CFR50.80 to Indirect Transfer of Control of Interests in Plant,Units 1 & 2 Operating Licenses That Will Occur Under Proposed Merger ML20128M1301996-10-0404 October 1996 Application for Amends to Licenses DPR-66 & NPF-73 Revising Surveillance Requirements 4.1.2.3.1,4.1.2.4.1,4.5.2.b, 4.6.2.1.b & Associated Bases Sections ML20117P3241996-09-0909 September 1996 Application for Amends to Licenses DPR-99 & NPF-73, Consisting of Change Requests 226 & 98,revising Table 3.3-3 Functional Unit 4.c & Spec 3/4.5.5 & Associated Bases Section for Unit 1 & 3/4.5.4 for Unit 2 ML20117N7051996-09-0909 September 1996 Application for Amends to Licenses DPR-66 & NPF-73, Consisting of Change Requests 234 & 107,modifying Section 5, Design Features,To Include Improved STS Requirements NUREG-1431 ML20129D9971996-09-0606 September 1996 Application for Amends to Licenses DPR-66 & NPF-73,revising Tables 3.3-3,3.3-5,3.3-4,4.3-2,4.3-6,4.3-7 & Spec 3.7.1.2, Auxiliary Feedwater Sys, & Associated Bases ML20113B3301996-06-18018 June 1996 Application for Amends to Licenses DPR-66 & NPF-73, Consisting of Change Requests 235 & 109,incorporating Editorial Changes for Unit 1 & Implementing Requirements of GL 95-05 for voltage-based SG Tube Repair Criteria ML20108D0931996-04-29029 April 1996 Application for Amend to License NPF-73,consisting of Change Request 106,modifying Design Feature Section 5.3.1 to Allow Use of ZIRLO as Fuel Rod Clad Matl ML20106G9771996-03-11011 March 1996 Application for Amend to License NPF-73,consisting of Change Request 103,revising Alarm Setpoints for in-containment High Range Area Monitors & Containment Purge Monitors ML20097G0691996-02-12012 February 1996 Proposed TS Changes 225 & 96 to Licenses DPR-66 & NPF-73, Respectively,Revising SR 4.6.2.2.d of LCO 3.6.2.2, Containment Recirculation Spray Sys ML20096B0521995-12-27027 December 1995 Application for Amends to Licenses DPR-66 & NPF-73, Consisting of Change Requests 230 & 100,modifying LCO Titled, Accident Monitoring Instrumentation & Associated SRs for Unit 1 & 2 1999-09-22 |
Text
.-
y .w e
T#
912) 4ss r>ooo 435 Satn Avenue g Q"g'8"#' Septe p \l7M b83 -
Director of Nuclear Reactor Regulation [d # ,e 'O On[kqD United States Nuclear Regulatory Commission Attn: Mr. Steven A. Varga, Chief '
b rg i q Operating Reactors Branch No. 1 ' - (I , ik,Q' H',
Division of Licensing ly C Washington, DC 20555 }(;
[g{f
,) r 'ip 46 t y C;;y x
Reference:
Beaver Valley Power Station, Unit No. 1 r ,)
Docket No. 50-334, License No. DPR-66 ..! i, . i Proposed Revision 3 to Change Request No. 62 to Operating License Gentlemen:
Enclosed are three (3) originals and thirty-seven (37) copies of proposed Revision 3 to Change Request 62 of the Beaver Velley Power Station Technical Specification Appendix A. This proposal requests that Change Request No. 62 as previously submitted and penuing review be modified as follows: Figure 6.2.1 has been updated to reflect the actual titles used for personnel reporting tc the Manager, Nuclear Support Services and to shov that the Radiation Technicims report to the Radiological Operations Coordinator. Section 6.3 has been expanded to include the Radiation protection Staff under the minimum qualifications of ANS1 N18.1-1971, the Radiation Centrol Supervisor title was changed to Radio-logical Operations Coordinator. Cection 6.5 expands the OSC membership to add the Study Projects Coordinator to the Senior Testing Coordinator position; the second note at the bottom of page 6-5 was added to state the minimum qualifications that OSC members shall meet; Section 6.8.2 has been changed to include the responsible Department Manager with the Plant Superintendent as to who can approve procedures.
Safety Evaluation The purpose of this proposed revision is to update Figure 6.2-1 and set forth the minimum qualifications for members of the OSC, and to reflect actual titles of staff pers.anel.
The OSC and ORC have reviewed this proposed revision to the Technical Specifications and have determined that there are no unreviewed safety implications associated with this change and that this revision does not constitute an unreviewed safety question.
.!ince this is a revision to an existing change request, we have determined that no fee is required. j Very truly yours, l-lO0l j
ll(
J. J. Carey Vice President, Nuclear 8109240259 810917 PDR ADOCK 05000334 P .PDR
g ..-
I *
-Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License-No. DPR-66 Technical Specification Appendix "A" Change Request No. lA-62, Revision 3 Page 2 cc: Mr. D. A. Beckman, Resident Inspector U.S. Nuclear Regulatory Commission Beaver Valley Power-Station Shippingport,-PA 15077 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555
.s f y y.
i.. . _ _ _ . _ __ __