Letter Sequence Approval |
---|
EPID:L-2018-RNW-0012, Avilsbility of Peach Bottom SLR Application and Opportunity to Request a Hearing (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: CLI-22-04, Change Letter to Peach Bottom Subsequent Renewed Licenses March 17 2022 Rev 1, ML18179A457, ML18214A383, ML18282A029, ML19007A282, ML19007A326, ML19029B121, ML19142A369, ML19182A112, ML19205A206, ML19240A300, ML22096A298
|
MONTHYEARML18193A6892018-07-10010 July 2018, 31 July 2018 Application for Subsequent Renewed Operating Licenses Project stage: Request ML18191B2802018-08-27027 August 2018 Avilsbility of Peach Bottom SLR Application and Opportunity to Request a Hearing Project stage: Request ML18179A4572018-08-27027 August 2018 FRN Notice of Availabity and Request for Hearing Project stage: Other ML18191B0852018-08-27027 August 2018 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Exelon Generation Company, LLC, Application for Subsequent License. Project stage: Acceptance Review ML18214A3832018-09-0505 September 2018 Subsequent License Renewal Application Online Reference Portal Project stage: Other NRC-2016-0078, Comment (1) of Alan Harris on Behalf of Entergy Louisiana, LLC and Entergy Operations, Inc. on Entergy Operations, Inc; Waterford Steam Electric Station, Unit 32018-10-0303 October 2018 Comment (1) of Alan Harris on Behalf of Entergy Louisiana, LLC and Entergy Operations, Inc. on Entergy Operations, Inc; Waterford Steam Electric Station, Unit 3 Project stage: Request ML18299A2132018-10-0909 October 2018 Comment (3) of Cheryl T. Seager on Behalf of Us Environmental Protection Agency (Epa)On the Draft Environmental Impact Statement (NUREG-1437,Supplement 59) for the License Renewal of Waterford Steam Electric Station Unit 3 ML18282A0292018-10-16016 October 2018 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18323A1032018-11-30030 November 2018 NUREG-1437, Suppl. 59, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford Steam Electric Station, Unit 3 - Final Report Project stage: Acceptance Review ML19007A2822018-12-0404 December 2018 Fws to NRC, Peach Bottom Subsequent License Renewal Ipac Trust Resources List of Endangered Species, Migratory Birds, and Wetlands Project stage: Other ML18354B1132018-12-20020 December 2018 Response to NRC Request for Additional Information, Dated November 23, 2018, Regarding the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application, Environmental Requests for Additional Information Project stage: Request ML19007A3352019-01-0707 January 2019 Map of Conowingo Pond Showing Location of Stations in Trawl Zones 405, 406 and 408 - Figures Project stage: Request ML19007A3302019-01-0707 January 2019 Final Report PBAPS Thermal Study Project stage: Request ML19007A3262019-01-0707 January 2019 Response to Request Dated December 7, 2018 for Docketing of Additional Documents to Support Nrc'S Environmental Review of the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Other ML19023A0152019-01-23023 January 2019 Supplement No. 2 - Changes to the Subsequent License Renewal Application Project stage: Supplement ML19042A1312019-02-11011 February 2019 Supplement No. 3 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Supplement ML19029B1212019-02-26026 February 2019 and 3 - Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML19065A0082019-03-0505 March 2019 Response to Nrg Audit Review Information Request - Application for Subsequent Renewed Operating Licenses Section 4.6 Primary Containment Fatigue Analyses Project stage: Request ML19077A2532019-03-18018 March 2019 Supplement No. 4 - Changes to the Subsequent License Renewal Application Project stage: Supplement ML19114A2652019-04-0808 April 2019 Submittal of Revision 27 to Updated Final Safety Analysis Report and Revision 22 to Fire Protection Program and Reference Drawings Project stage: Request ML19108A4272019-04-10010 April 2019 Request for Additional Information for Peach Bottom 2 and 3 Subsequent License Renewal Application - Set 1 Project stage: Request ML19122A2892019-05-0202 May 2019 Response to NRC Requests for Additional Information, Set 1, Dated April 10, 2019 Related to Plant Subsequent License Renewal Application Project stage: Response to RAI ML19253D2922019-05-0707 May 2019 Request for Clarification of Information on Peach Bottom Water Chemistry Program Project stage: Request ML19150A2972019-05-30030 May 2019 Revised Responses to NRC Requests for Additional Information, Fire Water System, Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Response to RAI ML19255F7822019-06-0303 June 2019, 27 September 2019 Public Clarification Calls with Exelon to Discuss Exelon'S Response to NRC Requests for Additional Information on Environmental Fatigue, (RAI) B.2.1.25-1, and Potential License Renewal Aging Management Issues Project stage: Request ML19157A0092019-06-0606 June 2019 Response to NRC Request for Additional Information, Dated May 15, 2019 Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Response to RAI ML19142A3692019-06-0606 June 2019 Revised Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML19163A2222019-06-12012 June 2019 Revised Response to NRC Request for Additional Information, Buried Pipe, Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Response to RAI ML19163A2232019-06-12012 June 2019 Revised Response to NRC Request for Additional Information, Core Shroud Support Fatigue Analysis Reevaluation, Related to the Subsequent License Renewal Application Project stage: Response to RAI ML19163A2212019-06-12012 June 2019 Supplement No. 5 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Supplement ML19182A1122019-07-0101 July 2019 First 10 CFR 54.21 (B) Annual Amendment to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Other ML19193A0062019-07-12012 July 2019 Supplement No. 7 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Supplement ML19205A4332019-07-24024 July 2019 NRC061 - Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants (Final Report), NUREG-2192 (July 2017) Project stage: Approval ML19206A1802019-07-25025 July 2019 Supplement No. 8 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Supplement ML19210D4532019-07-31031 July 2019 NUREG-1437, Supplement 10, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 10, Second Renewal for Peach Bottom, Units 2 and 3 Project stage: Acceptance Review ML19210C5712019-07-31031 July 2019 Schedule Revision for the Review of the Peach Bottom Atomic Power Station Units 2 & 3 Subsequent License Renewal Application (EPID Nos. L-2018-RNW-0012/L-2018-RNW-0013) Project stage: Approval ML19199A1132019-07-31031 July 2019, 1 August 2019 Notice of Availability of Draft Supplement 10, Second Renewal to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station Units 2 and 3 Project stage: Request ML19225B9762019-08-13013 August 2019 Response to NRC Request for Clarification of Information, Dated August 1, 2019 Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Request ML19268B3512019-09-12012 September 2019 Transcript of Peach Bottom Subsequent License Renewal Draft SEIS Public Meeting Held 12 Sep 2019 Project stage: Draft Approval ML19205A2062019-09-24024 September 2019 Summary Report for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML19240A3002019-09-27027 September 2019 Public Clarification Call with Exelon to Discuss Questions on Their Coatings and Linings of Certain Components Aging Management Program and Their Inspection of Buried and Underground Piping and Tanks Aging Management Program for SLR Project stage: Other ML19238A3032019-09-27027 September 2019 Public Clarification Call with Exelon to Discuss Exelon'S Response to NRC Requests for Additional Information on Environmental Fatigue Project stage: RAI ML19246A1452019-09-27027 September 2019 Clarification Call to Discuss Exelon'S Response to NRC Requests for Additional Information (RAI) 3.3.2.1.1-1 Project stage: RAI ML19280B2552019-10-0707 October 2019 SLRA Revision to BWR Vessel Internals Program Enhancement 1 Project stage: Request ML19275E9682019-10-0707 October 2019 Issuance Letter - Safety Evaluation Report Related to the Subsequent License Renewal of Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Approval ML19280D8202019-10-31031 October 2019 Safety Evaluation Report Related to the Subsequent License Renewal Application of Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Approval ML20063L3242020-02-28028 February 2020 EPA Comments on NUREG-1437, Supplemental 10, Second Renewal, Final (Peach Bottom Project stage: Request ML20024G4292020-03-0404 March 2020 Record of Decision - Issuance of Subsequent Renewed Facility Operation License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Approval ML20010F2852020-03-0505 March 2020 Transmittal Letter - Issuance of Subsequent Renewed Facility Operating License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Station Units 2 and 3 Project stage: Approval ML22055A5572022-02-24024 February 2022 Commission Memorandum and Order (CLI-22-04) Project stage: Request 2019-04-08
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] |
Text
March 5, 2020 Mr. Michael Gallagher Vice President. License Renewal and Decommissioning Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
ISSUANCE OF SUBSEQUENT RENEWED FACILITY OPERATING LICENSE NOS. DPR-44 AND DPR-56 FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (EPID NO. L-2018-RNW-0012)
Dear Mr. Gallagher:
The U.S. Nuclear Regulatory Commission (NRC or the staff) has issued Subsequent Renewed Facility Operating License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3 (Peach Bottom), respectively. The NRC issued the subsequent renewed facility operating licenses based on its review of your application dated July 10, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18193A689),
as supplemented by letters dated September 14, 2018 (ADAMS Accession No. ML18257A143);
January 23, 2019 (ADAMS Accession No. ML19023A015); February 11, 2019 (ADAMS Accession No. ML19042A131); March 18, 2019 (ADAMS Accession No. ML19077A253);
July 1, 2019 (ADAMS Accession No. ML19182A112); July 12, 2019 (ADAMS Accession No. ML19193A006); July 25, 2019 (ADAMS Accession No. ML19206A180), July 31, 2019 (ADAMS Accession No. ML19210C571) and October 9, 2019, (ADAMS Accession No. ML19280B255).
Subsequent Renewed Facility Operating License Nos. DPR-44 and DPR-56 for Peach Bottom expire at midnight on August 8, 2053, for Unit 2 and at midnight on July 2, 2054, for Unit 3.
The technical basis for issuing the subsequent renewed facility operating licenses for Peach Bottom is set forth in Safety Evaluation Report Related to the Subsequent License Renewal Application of Peach Bottom Atomic Power Station, Units 2 and 3 (ADAMS Accession No. ML20044D902). The results of the environmental review related to the issuance of the subsequent renewed licenses are given in the record of decision which is provided as to this letter and as NUREG-1437, Supplement 10, Second Renewal, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station, Final Report (ADAMS Accession No. ML20023A937). to this letter is Subsequent Renewed Facility Operating License No. DPR-44 for Peach Bottom, Unit 2. to this letter is Subsequent Renewed Facility Operating License No. DPR-56 for Peach Bottom, Unit 3.
M. Gallagher No changes were made to the Technical Specifications or the Environmental Protection Plans as a result of this subsequent license renewal. is the record of decision. is a draft copy of the related Federal Register notice of issuance of the renewed licenses as sent to the Office of the Federal Register for publication.
If you have any questions regarding this issue, please feel free to contact me by phone at 301-415-2981, or by email at Bennett.Brady@nrc.gov.
Sincerely,
/RA/
Bennett M. Brady, Senior Project Manager License Renewal Projects Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278
Enclosures:
- 1. Peach Bottom, Unit 2 Subsequent Renewed Facility Operating License
- 2. Peach Bottom, Unit 3 Subsequent Renewed Facility Operating License
- 3. Record of Decision
- 4. Copy of draft Federal Register notice cc: Listserv
ML19364A073 (Package), ML20010F285 (Letter), ML20024G423 (Unit 2 Subsequent Renewed License), ML20024G426 (Unit 3 Subsequent Renewed License),
ML20024G429 (Record of Decision), ML20024G430 (Federal Register Notice)
- concurrence via e-mail OFFICE PM:DNRL:NLRP LA:DNRL:NLRP Tech Editor* PM:DORL* BC:DORL*
NAME BBrady SLent (ltr only) CHsu JTobin JDanna DATE 1/14/2020 1/13/2020 2/4/2020 2/27/2020 2/27/2020 OFFICE BC:NMSS:REFS* BC:DNRL:NLRP OGC (NLO)* D:DNRL OD:NRR NAME RElliott EOesterle MYoung ABradford HNieh DATE 3/3/2020 3/4/2020 3/4/2020 3/4/2020 3/5/2020 OFFICE PM:NLRP:DNRL NAME BBrady DATE 3/5/2020 Enclosure 1 Peach Bottom Atomic Power Station, Unit 2 Subsequent Renewed Facility Operating License ADAMS Accession No. ML20024G423 The Technical Specifications and the Environmental Protection Plan did not change as a result of the subsequent renewal of the Peach Bottom Atomic Power Station, Unit 2, license.
Enclosure 2 Peach Bottom Atomic Power Station, Unit 3 Subsequent Renewed Facility Operating License ADAMS Accession No. ML20024G426 The Technical Specifications and the Environmental Protection Plan did not change as a result of the subsequent renewal of the Peach Bottom Atomic Power Station, Unit 3, license.
Enclosure 3 Peach Bottom Atomic Power Station, Units 2 and 3 Subsequent License Renewal Record of Decision ADAMS Accession No. ML20024G429
Enclosure 4 Copy of the Draft Federal Register Notice of Subsequent Renewed Facility Operating Licenses Peach Bottom Atomic Power Station, Units 2 and 3 ADAMS Accession No. ML20024G430