/03L-0:on 810810,leak Rate Calculation Indicated RCS Leak to Reactor Coolant Drain Tank.Caused by Packing Leakage on Valve 22RC20.Valve Repacked & Leak Rate Reduced
ML20010F279
Person / Time
Site: Salem 
Issue date: 08/28/1981
From: Dickey F
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20010F271 List:
References
LER-81-084-03L, LER-81-84-3L, NUDOCS 8109090556
Download: ML20010F279 (1)


LER-1981-084, /03L-0:on 810810,leak Rate Calculation Indicated RCS Leak to Reactor Coolant Drain Tank.Caused by Packing Leakage on Valve 22RC20.Valve Repacked & Leak Rate Reduced
Event date:
Report date:
3111981084R03 - NRC Website

text

sene pomu ass u.s tucLEca ctcutatca, couviw.

LICENSEE EVENT REPORT CoNTaOL SLO r. l l

l I

l.I l

tele Ast PalNT Ca TY;E ALL CEQUl:E0 INf 0 wATios.,

TTil In 13 is Ic ls 12 l@16 of of -I cl 01010101 -l cl Ol@l 41 ll 1111 lig[

l lg

)

l 0 9 LICEN$tt COpt to LICE Nst N.ws t m 26 Jg sigtsst 7,Pt J0

6) 661 be CON'T E

E*m":

e ! 01 Sl O! 01 01 3 l i l 1 )@l 0 18 11 l018 l1 e l 0 l a l 2 l 8l 8 l lj@

a si po:stTNvueEm as sa iv NT cat 75 ma*omT caTt a:

  • EVENT des RIPTION AND Pros AsLI CONSEQUENCE 5 O'o p 'l At approximately 0235 hours0.00272 days <br />0.0653 hours <br />3.885582e-4 weeks <br />8.94175e-5 months <br />, August 10, 1981, a leak rate calculation indicated a j

l Reactor Coolant System leak rate of 11.6 gpm to the reactor coolant drain tank. An j

l unusual event was declared in accordance with EPI-1.

At 0238 hours0.00275 days <br />0.0661 hours <br />3.935185e-4 weeks <br />9.0559e-5 months <br /> a shutdown was j o n gl commenced at the rate of 1% per minute, and action statement-3. 4. 7. . b was entered. l DTi'l I J

l i

o T l

_j 1016i I

.}

l sys'a v caust Caest Cove va a t I

cc:t ccot sus:::t coueoNt NT eost sus:oci sus:c:t IC19l lC lB l@ y@ l Bl@ l VI Al Ll Vl El Xl@ W@ W @

7 e

9 to 11 12 12 is 19 2i l

st o.'E NTea 6 00 Cue n t s:t miecat at s el :*.

Lte og EvtN'viam at*o*T NO CC t Tvrt N:

hn l8l1l l-l l 0l 8l 4l l/l l 0l 3 l lLl g

l 0l 25 22 22 as 26 21 at as, se ai a:

s op.i$

K 4 A T ON ONPLANT

& T Mount s tw Pom a

was rA str hl34 lh l Alh Uh l 0l 0l 1l 8l

[ g y g

{ g lV l 0l 8l 5 {

Z 2

36 3-40 di ey 43 aa 4-3 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l i l c l l The source of the Reactor Coolant Eystem leakage was packing leakage on valve 22RC20.J l The plant was taken off the line at 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> and was in mode 3 at 0415 hours0.0048 days <br />0.115 hours <br />6.861772e-4 weeks <br />1.579075e-4 months <br />.

J 3

l Valve 22RC20 was repacked, and the leak rate was reduced to within specification.

g l At 2045 hours0.0237 days <br />0.568 hours <br />0.00338 weeks <br />7.781225e-4 months <br />, August 10, 1981, act'.un statement 3.4.7.2.b was terminated *.

l

@l l

T a e s:-

'sT h

SPowtm CTMERITATUS Discov mv DIS 00Vtm v Dt10R* TION W @ l 0l 7l 0l h l N/A l

Q hl Leak Rate Calculation l

l t 5 ACTIVITY CONTENT mtLE AltD Os mtLE Ast AuDUNT 08 ACTIVITY LOC ATION OF mtLE ASE d,. d. h dh,i NA l

l NA

}

io Pam&ONNEL tsPosumts seuwstm TYPE DESCmiPitON 7

8 Lal of ol@L_zl@f xx I

Psm

~tt',N,v h otsCmirnoNh 8.l.wvweimcl 01 Ol@l NA l

2 n

.o L0$108 Om pawaCE TO 7ACILITY TWE DE SCmiPTsON b dhi NA l

t ee to s:

PueLiciTY NRC USE ONLY I'Itut >

Dt 5CmiPTION 1,1oj 1hl NA l

l l I l l l l l I ! ! ! ! *.:

ae io se se Pc 3 NAME OF PREPARER Frank Dickey 609-935-5100 E

PHONE-M 60 g5

' x

'~