ML20010E941
| ML20010E941 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 08/24/1981 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Phyllis Clark JERSEY CENTRAL POWER & LIGHT CO. |
| Shared Package | |
| ML20010E942 | List: |
| References | |
| NUDOCS 8109090163 | |
| Download: ML20010E941 (3) | |
See also: IR 05000219/1981010
Text
.Ag
.
.
u
,.
,
AUG 2* 1981
Docket No. 50-219.
m
q'\\bg- @f
,
Jersey Central Power and Light Company
3-
-
%
, ATTN: Mr. Philip R. Clark .
g
ob
4
-
.
Vice President - Nuclear-
y
H .U .
,
GPU Nuclear
SEP 0 81981 * 3
-
100 Interpace Parkway
R_
l
s
,
Parsippany, New Jersey 07054
co.nuen
7
4
Gentlemen:
"
Subject:
Inspection Report No. 50-219/81-10
This refers to the routine safety inspection condu ted by Mr. J. Thomas of
this office on April 1-30, 1981 at the Oyster Creek Nuclear Generating Station,
Forked River, New Jersey of activities authorized by NRC License No. DPR-16
and to the discussions of our findings held by Mr. Thomas with Mr. J.T. Carroll
and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Our inspector also verified the steps you he.ve taken to correct items of non-
compliance brought to your attention in letters dated August 20, 1980 and
September 29, 1980. We have no further questions regarding the sps you took
to correct the item in the letter dated August 20, 1980, and items A and B in
the letter dated September 29, 1980.
The enfo cement correspondence pertaining to the even+. of April 16, 1981
involving inoperability of the reactor building to suppression chamber vacuum
breakers has been provided separately to Dr. S. Bartnoff, President from the
Director, Office of Inspection and Enforcement.
Based on the results of this inspection, it appears that one other of your
activities was not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
This item
of nncompliance has been categorized into the leve', described in the Federal
Register Notice (45 FR 66754) dated October 7, 1980.
You are required to
respond to this letter and in preparing your response, you should follow the
DRPI
_0RPI
DETl h
0
.
h
T
D
TOR'
cThom /wb Gree man Knapp.
K
fr%g1
on
/
an ,
G ier -
t
- 7/2/81
~
V
' 7-L
q%
i
y jfyl ~
3
9
yte
OFFICIAL RECORD COPY
"
1
C109090163 810824 .
I
{DRADOCK05000
g
....
..
.
.
.
-
_ _ _ _ _ _ _ - _ _ _ _ _ _
-
. - .
- .;;w . n: .
.
..
.-
- ,:
. ;
.
.
.
_
..
AUG 24131
' Jersey. Central Power and Light
2
Company
instructions in Appendix A.
In addition to the need for corrective action
regarding'this specific item of. noncompliance, we are concerned about the
implementation of your' management control systems that permitted.it to occur.
!
' Consequently, in your reply, you should describe in particular, those actions
taken or. planned to improve the effectiveness of your management control
systems.
In accordance with 10 CFR 2.790 of the Commission's . regulations, a copy of.
this . letter and.the enclosures will be placed in the NRC's Public Document
~
Room.
If this report contains any information that you (or your contractors)
believe .to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within ten (10) days from the
date of-this letter of your intention to file a request' for withholding; and
(b) submit within 25-days from the date of this letter a written application
to this office to withhold such information.
Consistent with section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the owner
of the information which identifies the document or part sought to be withheld,
, ,-
E
and which contains a full statement of the reasons on the basis which it is
claimed that the information should be withheld.from public disclosure. .This
t
section further requires the statement to address with specificity the considera-
.-tions listed ir, 10 CFR 2.790(b)(4). The information sought to be withheld
shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted
L
above, the report will be placed in the Public Document Room. The telephone
.
l
notification of your intent to' request withholding, or any request for -an
extension of the 10 day period which you believe necessary, should be made to
the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.
The responses directed by this letter and the enclosed Appendix A are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
Original Signed By:
6.K.GOCA
- .
Boyce H. Grier
[
Director
L
Enclosures:
l-
1. -Appendix A, Notice of Violation
'
2.
Office of Inspection and Enforcement Inspection
-Report Number 50-219/81-10
0FFICIAL RECORD COPY
l
l
'
!
w
-
m
<
,
y
w
+r
p -
-
-aq+
___.
- __
_.
-
. .
. .
Jersey Central Power and Light
3
Company
cc w/encls:
M. Laggart, Licensing Supervisor
J. Knubel, BWR Licensing Manager
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
bcc w/encls:
Region I Docket Room (with conturrences)
Chief, Operational Support Sect!on (w/o encis)
,
OFFICIAL RECORP COPY