LER 81-114/03L-0:on 810708,turbine Driven Auxiliary Feedwater Pump Declared Inoperable Due to Slow Operating Time for Two Steam Supply Valves.Caused by Water Hammer Problem.Sys Redesigned & Valves Retested
ML20010B009
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 08/07/1981
From: Nardoci P
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20010B006 List:
References
LER-81-114-03L, LER-81-114-3L, NUDOCS 8108130214
Download: ML20010B009 (1)


Text

l . >.

NaC PCma4 Joe U. S. NUCLEAR RECULATQRy CCMMIE*3CN (7 773 UCENSEE EVENT REPCRT EXHIBIT A CONTRCL SLOCX: l } l l l l l (PLEASE PRINT CR TYPE ALL MECUIRED INFORMAT CNI i e t o t il l N I Cl MIG l S l 1[g 0 l 0 l -l0 l0 l 0 l 010l- l 01 Olg4 s .e l 1 l 1l1 l 1 l@l l lg 3 8 . WC&MSEsCOca le is WCah8&MW"8aA i ucEh54 Tvrt A 57 C.a r te c=N T

loeil r

u es QI 015 101010 l3 1619 @l0 1710 !8 1811 @l 01 81017l8 l1 l@

a se n nacaroare a se ei occ .r u.sen svaar care :s se EVENT QESCRIMcN ANO PAQSASLE CQNSEQUENCES @

i o ,: # IWhile in Mode 3, periodic testing of two steam supply valves determined that l l (TTT1 1 they would not cycle within the required time limit. The turbine driven I lo846Inuxiliarv feedwater pump (AFP) was declared inoperable nursuant to Technical f io,sil Specification 3.7.1.2 which is reportable per Technical Specification 6.9.1.13(b).

I a is i IFven thoueh there were no incidents reoutrine the use of the AFP's, in additiott io,7gIto both motor driven AFP's availability, the valves did eventually open makingg the turbine driven AFP available also. Thus, the health and safety of the public t o t e i Iwere unaf fected. I svgreis CAuBE cauBS CQh88 vaLvt cces caos sueccce couscaent:cos suecces susc=o.

10ist lH l Hl@ W@ y@ IV l Al LI VlE l Xl@ g@ Q

. is i, is is se i, a avtMfvtAn d yy g

@ ,"L34rno 1, 81 1l a 22 l-l

=

l 1 l 114 l a a l/l u

[QJ_lj

lL l a

[--l u

l0 l u

EN IEEE c!!EErr '""e4E" aues :: 'EeTEa'n* aca"t's. "E".,'.57 **

,, M",'e n lF u Q W a @ lZf@

s y@

se l0 (0 l 0 l u

l W@

4 IN f@ lL l@ lZ [9 ] 9 l 9 [g

. as . ,,

CAuss cascaimCN ANOCcamsenva Ac;icus @

li t o i l A system redesign to correct a water hammer problem included replacing the ,

i,,,,; orifice which bleeds off air pressure from each valve with a smaller one, ,

,,,,,lresulting in a long opening time for the valves. The small orifice was y g l replaced with one of the original size, and the valves retested. ,

I t i 6. i I f

's E sec=en erwensvans @ Isc san ciscovear onenienc= @

, y W@ l01010 j@l Mode 3 l ' =U@l= Periodic Test l a 4, g, is ia = se metaAss Location ce metrase @

liisI[.2j@oosaetaAse Lyj l N/A masount o, acnvrry @l l N/A )

'e's n@,aisu " * "

' ' . .u-unason nn one-no @

li I 7 I I o I 010 l@l z.J@l N/A l l '

nue e'u'. ui '2.as auwun oescaiencah Li_[sjl0101Ol@l N/A l 7 8 9 in 12 g.

'O's i * * "s'c"n',*n'e'8 '"" @

N/A UTSI M.l

, . is ,e l

e e CAIFnoM MAC USE CNLY

o IN[@l N/A I ll lllll  ;;;gl

, .. ie u .. ,e NAugc,,mePAmeR Phillip B. Nardoci , , . (704) 373-7432

' 8108130214 810807 PDR ADOCK 05000369 S

_ _ _ pop _

__ _ _ _ _ _ _ _ _ _- _ ., _ _ _ , _ _ , _ _