ML20010B006

From kanterella
Jump to navigation Jump to search
Forwards LER 81-114/03L-0.Detailed Event Analysis Encl
Date released: 01/24/2020 Download: ML20010B006


LER 81-114/03L-0:on 810708,turbine Driven Auxiliary Feedwater Pump Declared Inoperable Due to Slow Operating Time for Two Steam Supply Valves.Caused by Water Hammer Problem.Sys Redesigned & Valves Retested
ML20010B009
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 08/07/1981
From: Nardoci P
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010B009 (1)
Forwards LER 81-114/03L-0.Detailed Event Analysis Encl
ML20010B005
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 08/07/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20010B005 (3)