ML20009C371

From kanterella
Jump to navigation Jump to search

Forwards Standby Diesel Generator Reliability Study Per Kr Goller 771215 Request.Followup Correspondence Will Be Submitted for Unanswered Questions Because Data Unavailable Until 780120
ML20009C371
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/18/1978
From: Betty J
FLORIDA POWER CORP.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20009C370 List:
References
TAC-43912, NUDOCS 8107200493
Download: ML20009C371 (2)


Text

<~

reece

, f 40k 79 93 a

5)$ &

e463 4e s'

Q

~

Florida Power Coasc e a v.0=

18 Januasf, 1973

,f 3-0-3-a-3

,q p~, _, ~ ~.

r' GCpn

..h.

M,. !

.\\

,si g.

6b. '

,f 7.

.a so.s

$~

~

\\

u.s_ %e.,D 9

s.

Director of Nuclear Reac:c Regulation A

c.:

"'" v i ':.:

A U. S. Nuclear F.egulatory Cc=sission re Washington, D. C.

20555

\\.p;.

s

,s

/ :,-..' \\\\7

~<V.

Dear Sir:

=

A:: ached Standby Diesel Generater Reliability Study is sub=itted in accordance with US NRC correspondence fres W. kcri g, celler, Assistant Direc:cr for Operating Reacters, Division of Operating Reacters, dated Dece=ber 15, 1977.

Fellev-up correspendence vill be subr.1: ed for those entries on the ques:ionnaire which were unable to be answered because data was net available by January 20, 1973.

Ver7 truly yours, 24./

lg l

Guy J. Beatty, Jr.

Nuclear F1,-,

Man _;,

JNK/ b a::achnerts xc:

?. F. McKee

'f i

g (4 !

lfI h

\\

W et' M 8107200493 810709 PDR ADOCK 05000302 F

PDR CRYSTAL RlVER NUCLEAR PLANT P.O. SCX l'dS, CRYSTAL Ris cR, FLA. 32629

+.

Give the accumulated time-load operating record for each X.

1.

diesel-generator unit from installation to the present (Running Hours):

Preoperational test Date Engine Sury. Testing & :

Emergency Total

Serial !!o. :

Maintenance Hrs, :

and Other Hours No Load : Loaded :

Service Hrs. :

36D871033 :
50.5 G'il LW 143.6
TDSM 12 W
380871036
TDSM 12 LH
52.0 L'H :

W

141.7 TTotal T

f: ceneratea:1 M. M

/

i.

00:

Surveillance test load (percent of continucus rating) 2.

l Give the projected or clannec time-load operation for 3.

each diesel-generator unit during the next 12 months.

Surveillance &

Eme rgenc~v Total 23

Maintenance Mrs. :

and otner :

Hours I

T. m TOR Service Mrs. :

50 O

50 I

Provide the followinc sunmary of the periodic surveillance testing 4.

experience:

12/30/76 Starting date of syveillance testing (CL :. ate) a.

b.

Periodic test interval > Sm:hiv 19 eer diesel Total numoer of surveillance tests cerformed N c.

c.

Total nutoer of test failures failure to accept load n

failure to start 5

failure to carry loaa O failures cue to coerator error 0 failure due to ecuionent not ceing operative during emergency conditions O

Supply a copy of the surveillance test procecures with :nis e.

concleted questionnaire.

SP-354, OP-707

- + - -

-g g..,