05000369/LER-1981-042-03, /03L-0:on 810406,during Mode 5 Initial Fuel Loading,Seismic Monitoring Instrument Starter Unit Was Not Operating Properly.Caused by Broken Wire & Sensitivity Potentiometer Out of Calibr.Wire Repaired

From kanterella
(Redirected from ML20009C299)
Jump to navigation Jump to search
/03L-0:on 810406,during Mode 5 Initial Fuel Loading,Seismic Monitoring Instrument Starter Unit Was Not Operating Properly.Caused by Broken Wire & Sensitivity Potentiometer Out of Calibr.Wire Repaired
ML20009C299
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/06/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20009C294 List:
References
LER-81-042-03L, LER-81-42-3L, NUDOCS 8107200444
Download: ML20009C299 (1)


LER-1981-042, /03L-0:on 810406,during Mode 5 Initial Fuel Loading,Seismic Monitoring Instrument Starter Unit Was Not Operating Properly.Caused by Broken Wire & Sensitivity Potentiometer Out of Calibr.Wire Repaired
Event date:
Report date:
3691981042R03 - NRC Website

text

Nec POAme 384 U. S. NUCLEAA RECULATORY Conansessaoff C117i LICENSEE EVENT REPORT EXHIBIT A CONTMoL sLoCK: l l l l l l.h t

(PLEAsE PRINT OR TYPE ALL AEQus AED INPCR AAATIONI i

foITl I Nl C I Ml GI S I 1 l@isl Ol 0 l-1010 l 0l 01 Ol - 10 I Ol@l 4 l 111 l 1 l 1 l@l l l secArse@

a e

. ucansas coos i.

i csase ayana 4s a

uco.u rves a Comer 101 1

"'% l Li@l 015101 Of 01316 I 91@l 0 l 410161 gl 1 ]@l o f 510l 6l g l 1lg

,ou I

8 G

Si coCEeT seum.sem S

eB Evtaf oATe 74 Ts mePoAfoATe SD EVENT DESCMIFnoN AND PRoSASLS CONSEQUENCES h ITTTl l While in Mode 5. -initial fuel loading. personnel found the Seismic Monitor-l f7TT1 I ing Instrument Starter Unit not operating peroperly. This was discovered lo141I anrine -onthiv nreventative maintenance.

This is in violation of the re-I to ist i quirements of Technical Specification Table 3.3-7.

No seismic event lo is i I occurred and redundant instrumentation was operable; therefore, the health,

lo i r l I and safety of the public were not af fected.

t o is t i I

E l T I E l@ W@ [,,_B,j@ II l N I St T l R l U [Q y@ sSEEe@

compoasart coes suecoos laist r

a e

ie is is is is se Pe,an7.2 "cE"**

"EE' "T*

camino eveNrve4a hg; I 81 11 b

l 014l2l lA g

y g

l,0_j 0

_2

=

2.

a n

=

,e

,i

=

Ea" E oIs'E#

W

'U'.'='M"o' no7.ve. '"Eu!E im Yaacr'u"Isn L.aJ@l.ljh I z l@

W@

IoIo!O@iui urr wouse g@

! Ni g u g lx l 9 l 9 l 9l g as 2

m as 21

.e

.i CAuse oesCmemon AmoConasenvs Acnoms @

ti6oIi The Remote Starter Unit of the SMA-3 System had a broken wire and the iiiiil sensitivity potenti.ometer was out of calibration.

The broken wire was L11.1.) I ronni ted and the notentiometer was recalibrated.

The instrument was then i

li t a l l decl nved onerable.

This instrument was manufactured by K-Metric.

l titel l I

'st n$

osecoveRYossentavices h its in poseen otaen status IiisI d @ lOlOf0l@l Mode 5 l W @l Personnel Observation l

r s 4, g, is is

.e

.e se I ) e l W @o or metaAssQl@l a-'='-rop acnvery h l LocAnoa os metaAse h setaAss NA l

NA l

eensoma'"t exposOes s

oesca m o @

i.u rv li171 I Ol Ol O k g,e @ l j

NA l

' penson=e't'ieuv' des ossenemoah innun l,,,,,[s.,,j l 010 10 l@l NA l

7 8 9 is is g.

E e N es'e"n',"T E ' " h ITTil L7j@l NA

[

is

,e bmoah Nmc use oNLY E. ssuel b]hl NA I ;;;;;;;;;;;;l i

is a..

,e R. W. Quellette (704) 373-7530 NAase ca pnePAMER

,,on,.

8107200444 810506 l

DR ADOCK 05000369 PDR