ML20009C294

From kanterella
Jump to navigation Jump to search
Forwards LER 81-042/03L-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009C294


LER 81-042/03L-0:on 810406,during Mode 5 Initial Fuel Loading,Seismic Monitoring Instrument Starter Unit Was Not Operating Properly.Caused by Broken Wire & Sensitivity Potentiometer Out of Calibr.Wire Repaired
ML20009C299
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/06/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C299 (1)
Forwards LER 81-042/03L-0.Detailed Event Analysis Encl
ML20009C293
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/06/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009C293 (3)