05000311/LER-1981-032-03, /03L-0:on 810603,boron Injection Tank Concentration Decreased Below Tech Spec Limits.Caused by Safety Injection Initiated by High Streamline Flow from High Level in Steam Generator 22.Tank Borated

From kanterella
(Redirected from ML20009A508)
Jump to navigation Jump to search
/03L-0:on 810603,boron Injection Tank Concentration Decreased Below Tech Spec Limits.Caused by Safety Injection Initiated by High Streamline Flow from High Level in Steam Generator 22.Tank Borated
ML20009A508
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/30/1981
From: Espey J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20009A504 List:
References
LER-81-032-03L, LER-81-32-3L, NUDOCS 8107130247
Download: ML20009A508 (1)


LER-1981-032, /03L-0:on 810603,boron Injection Tank Concentration Decreased Below Tech Spec Limits.Caused by Safety Injection Initiated by High Streamline Flow from High Level in Steam Generator 22.Tank Borated
Event date:
Report date:
3111981032R03 - NRC Website

text

av.wau asuwa w w a m.ura. m c t7.T7)

LICENSEE EVENT REPORT

~

CORYROL BLOctt l l

l l

l l

lh iPLEASE PRINT OR TYPE ALL CEQUIRED INFORMATION)

I 6

lo l1l lN lJ lS lG lS l2 l@l ol ol -l 0l 0l 0l 0l 0l -l Ol 0l@l 4 l 1l 1] 1l 1l@[

l lg 7

8 9 LICENSEE COOE 14 15 LICENSE NL,MSER 26 26 LICENSE TYPE JD 57 CATSe COWT l0l1l 5,'7RcE l Lhl 0] 5l 0l Ol 0l 3l 1l 1hl o l 6 l 0 l 3 l 8 l 1pl0 l 6l 310 l 3 l 1l@

7 8

60 61 DOCKET NUM8ER 68 69 EVENT DATE 74 75 REPORT DATE do EVENT DESCRIPTION AND PROBA8L'E CONSEQUENCES h g l At 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br />, on June 3, 1981, a high level in No. 22 Steam Generator resulted in g

9 a Turbine Trip, Reactor Trip and Safety Injection, Boron Injection Tank concentratiop g o g o, g decreased to less than 20,000 ppm of boron and Action Statement 3.5.4.1 was entered. g g ; This occurrence constituted operation in a degraded mode IAW Technical Specificationg iO ls l l 6.9.1.9.b.

Previous similar occurrence:

81-09.

l I O l 71 L l

10181l l

SYSTEM

CAUSE

CAUSE COMP.

VALVE COCE CODE SU8 CODE COMPONENT CODE SU8 CODE SUSCCOE l0l9) l S lF lh Wh lZ lh l ZlZ lZ lZ lZ lZ lh Wh y h 7

8 9

to 11 12 13 18 19 20 SEQUENTI AL OCCUR R E NCE REPORT R EVISION EVENT YEAR REPORT NO.

CODE TYPE NO.

h g"LE R' AOl8l1l l-l l0 l3 l2 l

]/l l0 l3 l lL l g

l0l j, GAT

_ 23 22 23 24 26 27 28 29 30 31 32 N AC ON O PLANT ME HOU"5 SB i FOR 8.

SUPPLIE MANU ACTURER lZ lgl34Zl@

lZ lQ lZl@

l0l0l0l0l W@

W@

lZl@

l Z l 9 l 9 l 9l@'

3J 3b 36 37 40 el 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h ji ;o;j The Safety Injection caused dilution of the Boron Injection Tank.

The Tank was g

ii ;i l l borated until concentration was within the allowable limits. At 2229 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.481345e-4 months <br />, on l

, j;,yl June 3, 1981, the Action Statement was terminated.

l 11 131 l l

LLL II I

7 8 9 So ST A

% POWE9 OTHER STATUS dis O RY DISCOVERY 0ESCRIPTION I1 l5 l bh l 0l 2l 0l@l N/A l

{ gl Operator Cbservation l

ACTIVITY CO TENT RELEASED OF RELEASE AMOUNT OF ACTivtTY LOCATION OF RELEASE MA l

l NA l

Q d h dhl 7

8 9 to 11 44 46 80 PERSONNEL EXPOSURES NUM8ER TYPE

DESCRIPTION

[1 l 7 l l 0l O!Oh!Zh!

l NA l

PE RSONN[L INJU IES DESCRIPTION @

NUMBER l

11 1a1Ielelol@l NA 7

8 9 11 12 80 j

LOSS OF OR QAMAGE TO FACILITY TYPE

DESCRIPTION

I lLl ! LaJ81 NA 4

7 8 9 10 BC 2 l O I [p_J@DE CRIPTION ISSUE l

N3 l

lllllll1III!l; a e in 68 69 80 5 8107130247 810630 J. J. Espey og_o35-0998 PDR ADOCK 05000311 psONz:

a, S

PDR

- v

yn,.

,,,1~

~ -

,y,v-,,


,--------e--,~,e,

-,------.----ev r,

y