Forwards LER 81-032/03L-0.Detailed Event Analysis Encl
ML20009A503
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/30/1981
From: Uderitz R
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20009A504 List:
References
NUDOCS 8107130243
Download: ML20009A503 (2)


LER-1981-032, Forwards LER 81-032/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
3111981032R00 - NRC Website

text

,.

O PSEG Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 Phone 201/430-7000 June 30, 1981 Mr. Boyce H.

Grier Director of USNRC Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

LICENSE NO. DPR-75 DOCKET NO. 50-311 REPORTABLE OCCURRENCE 81-32/03L Pursuant to the requirements of Salem Generating Station Unit No. 2 Technical Specifications, Section 6.9.1.9.b, we are submitting Licensee Event Report for Reportable Occurrence 81-32/03L.

This report is required within thirty (30) days of the occurrence.

Sincerely yours,

'O s-4 h.L

)

S

/[8dk y

  1. C JUL 10 GBj p-p R.

A.

Uderitz p

General Manager -

u u.s.ugg,le y

Nuclear Production

\\w?

.4

, erry i

CC:

Director, Or ice of Inspection and Enforcement (30 copies) i Director, Office of Management Information and Program Control (3 copies)

[

6/ l 8107130243 810630 l

DR ADOCK 05000311 l

PDR The Energy People vs rc, mc : w

Report Number:

81-32/03L Report Date:

June 30, 1981 Occurrence Date:

6-3-81 Facility:

Salem Generating Station, Unit 2 Public Service Electric & Gas Company Mancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Boron Injection Tank - Out of Specification CONDITIONS PRIOR TO OCCURRENCE:

Mode 1 - Rx Power 20% - Unit Load 110 MWe DESCRIPTION OF OCCURRENCE:

i At 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br />, on June 3, 1981, a high level in No. 22 Steam Generator caused a Turbine Trip and a Reactor Trip.

The steam dump opened causing a high steamline flow, coincident with a low Tavg.

This initiated a safety injection, which caused the Boron Injection Tank concentration to decrease to less than 20,000 ppm of boron.

Action Statement 3.5.4.1 was entered.

This constituted operation in a degraded mode IAW Technical Specifi-cation 6.9.1.9.b.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

The safety injection diluted the Boron Injection Tank to less than 20,000 ppm of boron.

ANALYSIS OF OCCURRENCE:

Technical Specification 3.5.4.1 requires that with the Boron Injection Tank inoperable, restore the tank to operable status within one hour or be in hot standby and borated to shutdown margin equivalent to 1% Ak/k at 200 t within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the tank to operable status within the next 7 days or be in hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

CORRECTIVE ACTION

The Boron Injection Tank was borated to between 20,000 and 22,500 ppm boron from the Boric Acid Storage Tank.

Action Statement 3.5.4.1 was terminated at 2229 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.481345e-4 months <br />, on June 3, 1981.

FAILURE DATA:

Not Applicable Prepared By J.

J.

Espey N'

Manager - Salem Generating Station SORC Meeting No.

81-56