,Q > y.w if ' '
f i,
s".
OBattelle Pacme Nonhn esi Laborato ies i
r.O. Hot 9%
- Rkhbnot. Washinigtiin U.5A. 99W j
leicehunos"' 376-40031 icw 13.m.i
..j
-November 13, 1989 a
,f r
'l Mr..S. V. Pullani
- U.- S. Nuclear Regulatory Commission'
.475-Allendale Road.
King of Prussia, PA 19406
Dear Mr. Pullani:
^
OPERATOR LICENSING EXAM, 0YSTER CREEK, WEEKS OF OCTOBER 11 AND -16,1989 r
7 As per you request, the followingl list indicates how.the Oyster Creek facility' t
? comments were. addressed in regards to the R0 written examination given Octoberi J
11, 1989. Only those question / answers that the facility had comments:on are discussed. Also enclosed is'a list of strengths / weakness andt the walk-through.
scenarios you requested.
l l'.. 'Section 2, Question 2:
.The word " correct" used in the question was changed to IMMEDIATE.
Answer:.The. answer for part e. was changed from 2 to 3.
1 2.
=Section-2, Question 3:
Under Column I, part b. was changed from " reactor scram" to " reactor scram, low level." Also, pard d. under Column I was changed from " turbine i
trip" to read " turbine trip, Hi level." Under Column II two additional L
setpoints were given; 146: TAF and 170" TAF.
Answer:
Part j. was changed from 1 to 7 and part 1. was changed from 2
.to 6.
(
3.
Section 2, Answer 4 Three more correct responses were added to the seven already addressed.
Those-were:
Open 100 amp breakers.
Pull fuses.
Operate subchannel test switches.
9001230074 900110 ADOCK0500gj9 PDR V
n my, c
i 6
Mr.-S. V.=Pullani' November 13,.1989
>+
Page 2 n
- 4...Section 2, Answer 6-Discussions with Herb Tritt on 10/18/89 finalized our decision that the
-answer to this question is "2" for all parameters listed under Column I.
5.
Section.,2, Answer 7 r
Part b. was changed to accept answer 5 or 4 instead of just 5.
6.
Section 2, Answer 13-Part a. was changed from 4 to accept e4 or (8% peak to peak).
-7.
Section 2, Answer 18 Part 1. was changed to accept "B-9" o_r " Reactor operations floor high radiation."
Part 2. was changed to accept "C-9" o_r " fuel pool area high radiation."
Part 4, was changed to accept 86" g 90" TAF.
Part 5. was changed to accept 2.9 pisg g 3.5 psig.
8.
Section 3, Question 2 Under Column II, item 4 was changed to read V-21-1, -3, -5, -7, -9, and
-11 open, V-21-13, -14, -17, and -18 close, allowing containment spray pumas A&C'to start automatically.
Either V-21-14 or V-21-15, to agree wit 1 the drawing associated with this question, were accepted.
Part 7 under Column 11 was eliminated.
Answer 2: part c. changed from 7 to 4.
9.
Section 3 Answer 3 Part 3. was changed to accept 2.9 psig g 3.5 psig.
10.
Section 3, Question 5 Part b. has been deleted.
Answer 5:
Part a. was changed to accept "High Drywell Pressure of 2.9 psig or (3.5 psig). Part b. was deleted.
11.
Section 3, Question 6 Item a.2 was changed to read " Backup Core Spray Booster Pump."
iti w
s 4
3' u-f.l 1-J:
f:eI,a Mr.!S.)V. Pul1ani.
~
k,
' November 13,.1989' 3
.Page:3 V
, u.
12.
Section 3, Question 11
[
.Part a. was deleted; g
- 13. : Section 3,/ Answer 13 y
[
.Part a.2_was changed to 26 minutes.
- 14. Section 3; Answer.15.
Part a.2 was changed to' read " loss oi 3: eed or electrical signal."
l' 15.- Section 3, Answer 16 o
Reference material provided by the utility suggest that the candidates are trained-to respond as described by the Master Copy. The comment was not: accepted.
Sincerely,
')
L Timm L.'Bettendorf Operator Licensing Section-TLB:km a
l r
L..
u b
r