MONTHYEARML19256C5901979-05-18018 May 1979 PNO-79-118:hydraulic Snubbers Failed to Meet Bleed Rate Criteria.Probable Cause Is Air Contamination in Snubbers. Licensee Plans to Test & Repair All Snubbers Project stage: Other ML20005B2121981-06-29029 June 1981 Responds to NRC 801120 Request Re Application for License Amend to Incorporate Tech Specs Revisions Re Snubber Surveillance.License Commitment to Ansi/Asme Std Program Should Be Acceptable Alternative to License Amend Project stage: Request ML13330A4261981-12-24024 December 1981 Forwards Amend 102 to License DPR-13,consisting of Proposed Change 105 to Modify Existing Tech Specs to Be Consistent W/Sts Project stage: Request ML13326A7041982-09-0808 September 1982 Safety Evaluation Supporting Amend 63 to License DPR-13 Project stage: Approval ML13326A7051982-09-0808 September 1982 Notice of Issuance & Availability of Amend 63 to License DPR-13 Project stage: Other ML20067C4071982-11-24024 November 1982 Responds to Re Tech Specs for Snubber Surveillance.All Snubbers Defined in Ansi/Asme OM-4 Std Will Be Listed in Tech Spec Tables in Manner Similar to Current Table on Hydraulic Snubbers Project stage: Other ML20105B9341983-06-28028 June 1983 Requests Extension Until 830801 to Submit Revised Tech Specs for Snubbers,Due to Extensive Internal Review Project stage: Other ML20077G8181983-08-0101 August 1983 Extends Submittal Date for Proposed Tech Specs on Snubber Surveillance to 830901,to Allow for Resolution of Util Nuclear Review Board Comments Project stage: Other ML20077M1361983-09-0101 September 1983 Proposed Changes to Tech Specs 3.7.7 & Table 3.7-3 Re Snubber Surveillance to Include Mechanical Snubbers W/ Schedules,Actions & Acceptance Criteria for Sample Testing Project stage: Request ML20077M1341983-09-0101 September 1983 Application for Amend to License NPF-3,revising Tech Specs 3.7.7 & Table 3.7-3 Re Snubber Surveillance to Include Mechanical Snubbers W/Schedules,Actions & Acceptance Criteria for Sample Testing.Safety Evaluation Encl Project stage: Request ML20077M1301983-09-0101 September 1983 Forwards Application for Amend to License NPF-3,revising Tech Specs 3.7.7 & Table 3.7-3 Re Snubber Surveillance to Include Mechanical Snubbers W/Schedules,Actions & Acceptance Criteria for Sample Testing.Class III Fee Encl Project stage: Request ML20101T4441985-01-30030 January 1985 Proposed Tech Specs,Revising Hydraulic & Mechanical Snubber Surveillance Program,Including Changes to Visual & Functional Tests of safety-related Snubbers & Maint of Equipment & Surveillance Records Project stage: Other ML20101T4241985-01-30030 January 1985 Application for Amend to License NPF-3,revising Tech Specs 3.7.7,4.7.7 & 6.10.2.m Re Mechanical & Hydraulic Nuclear safety-related Snubbers Project stage: Request ML20137M8701986-01-22022 January 1986 Notifies That Application to Amend License NPF-3,authorizing post-transient Insp of Hydraulic & Mechanical Snubbers Will Be Submitted by 860228.Understanding That 850130 Application Will Be Approved by 860215 Confirmed Project stage: Request ML20140F9071986-03-26026 March 1986 Informs That Deletion of Footnote 6 & Addition of within Specified Range to Proposed Surveillance Requirements 4.7.7.2b & 4.7.7.2c.2,respectively,will Be Incorporated Into Apr 1986 Amend Application,Per NRC 860324 Request Project stage: Other 1983-06-28
[Table View] |
Text
_ _ - _ _ _ _ _
O Docket No. 50-346 TOLEDO
%me EDISON License No. NPF-3 RCHARO P. C AOUSE Serial No. 725 yj;7a**
I41912b9 5221 June 29, 1981 Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stolz:
This is in response to Mr. D. G. Eisenhut's letter dated November 20, 1980 (Log No. 638) concerning technical specification revisions for snubbers surveillance.
Mr. Eisenhut's letter requested a license amendment application to incorporate the applicable portion of model technical specifications to the Davis-Besse Nuclear Power Station Unit l's (DBNPS)
Technical Specifications, Appendix "A" to License No. NPF-3, to embody changes, improvements and clarifications based on recent operating experience.
Toledo Edison is participating with the American Society of Mechanical Engineers (ASME) in developing the program " Examination and Performance Testing of Nuclear Power Plant Dynamic Restraints (snubbers)", ANSI /
ASME OM-4.
This standard represents development of a program of periodic examination and testing of equipment dynamic restraints (snubbers) from pre-service inspection through the life of the plant.
Its status now reflects development by experienced utility and industry personnel as well as general industry consensus. Recognizing the degree of experience, expertise and review afforded this standard, Tcledo Edison strongly encourages its endorsement by the NRC as an acceptable alternative to your November 20, 1980 letter.
Toledo Edison is committing to the ANSI /ASME OM-4 standard. When ASNI/
ASME OM-4 is issued, DBNPS will incorporate this standard as an integral part of the inspection program. As a result of this Toledo Edison commit-ment to ANSI /ASME OM-4, no license amendment application is required.
fool Yours very truly, y