LER 81-003/01T-0:on 810526,steam Generator 2A Blowdown Sample Isolation Valve Failed to Close Upon Actuation.Caused by Excessive Stem to Packing Friction Due to Dried Out Packing.Packing Gland Adjusted & Valve Stem Lubricated
ML20004F141
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 06/04/1981
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20004F136 List:
References
LER-81-003-01T, LER-81-3-1T, NUDOCS 8106160548
Download: ML20004F141 (2)


Text

n - . __:.u-- ~ _ - - - -

CRC F OEM 364 ,

U. S. NUCLEA'1 CEiULATCY COMMISSION (7 77)

. .. LICENSEE EVENT REPORT CONTROL 8 LOCK: l l l l l l (PLEASE PRINTCR TYPE ALL CEOUIRED INFK.MATl!N)

FITlS 9I Wl Il Pl B l Hl 2 l@150l0l-l0l0l0l0l0l-l0l0l@ 4l1l1l1l1l@l 14 LICENSE NUM8ER 25 26 LICENSE TYPE JO l

SFGAT$8 l@

7 LICENSEE CUoE CON'T O i l60Ll@l 610 l 5 l 0oOCKET l 0 lNUM8ER 0 l 3 l 0 l 168 l@l l l l l l l@

69 0 l EVENT 512oATE l 6 l 8 l 741 l@l 3 uRCE 75 REPORT oATE 80 7 8 EVENT DESCRIPTION AND PROGA8LE CONSEOUENCES h o 2 lDuring normal operations at 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br /> , on May 26, 1981, attempts to I g o ,3 l l cycle 2A steam generator blowdown sample isolation valve, 2CV-20 8 3, we re l io g4; lunsuccess ful. Failure of 2CV-2083 to close when actuated is a technicall l o I s l lviolation of containment integrity as defined in T. S. 15.1.d. This l o s loccurrence is reportable in accordance with T. S.

15.6.9.2.A.2 as l gp] l operating in a less conservative manner than the limiting condition of l l o is i loperation specified in T. S. 15.3.6.A.a. I 7 8 9

'SI'E "^"o*E CO sNCooE COMeONENT COoE suSS"o'o'E sVNE'og g l S l D l@ (E_j@ W@ lV l A l L lV l El Xlh W@ [D_j @ 18 19 20 y 8 9 10 11 12 13 sEOVENTIAL OCCURRENCE REPORT REVislON EVENT YEAR REPORT NO. COoE TYPE NO.

@ ,ag/RO LER l8 l1l 2% 22

[---j 23 l0l0l3l 24 26 y

27 l 0 l1 l 28 29 W30

[.-.]

31

[0_J 32 ON PLANT ME HOURS .s8 17 FOR B. su L MANUFACTURER K N AC O lEl@

33 W- @

34

[Z_j@

3b LZ_j@

36 l0 l 0 l 010 l 31 30 l_Yj@

41

[N_j@8 42

(_N_j@

43 lBl3l1l4l@

44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 27 Fi l o t IFailure of 2CV-2083 to close upon actuation was due to excessive stem tol i i packing friction resulting from dried out packina. Followina disecve w I g jof the probi.em the packing gland was adjusted and the valve stem was I g l1ubricated. The valve was tested satisfactorily and returned to I ii i,i l operation at 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> on May 26, 1981. At no time was the public l safety endangered. m 7 8 9

's**lN7s* seOwER OTNERsTATus @ "'s[o i SEv' oisCOvERv oEsCRienON @

is (_E_J@ l 110 l 0 l@l" N/A l W@l Operator observation ""

l A!riviTY CO'0 TENT LOCATION OF RELEASE i 6 OgELEAst@o OF RELEASE AMOUNTOF @lN/A ACnVtTY lN/A

@l

  • l rERsONNEt ExeOsuAEs NUM8ER TYPE oEsCRienON @

Q l0 l 0 l 0 l@(Z_j@l N/A

  • l PERsONNe'L iNau' dies NuM8ER oEsCRIPTION@ l

[i_ja_] l0 l 0 l 0 l@l N/A 80 7 8 9 11 12

^"^C@

. oN l

7 1 9 8 9 WE@lN/AE 10 80 PUBLICITY NRC USE ONLY

  • 2 o lN l l N/A l$suEo@oEsCRIPTION l lllllllllllllI 68 69 80
8 9 to ,

NAME OF PREPARER C. W. Fay PHONE: 414/277-2811 {

8,an,nn5Dr

,e .

ATTACHMENT TO LICENSEE SVENT REPORT NO. 81-O'13/O lT-0 Wisconsin Electric Power Company Point Beach Nuclear Plant Unit 2 Docket No. 50-301 i

At 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br /> on May 26, 1981, during normal power operation, Unit 2, "A" steam generator blowdown sample valve , 2CV-20 8 3, failed to close upon a manual remote signal from the control operator. The attempt to close 2CV-2083 was at the request of Chemistry Group personnel to stroke the valve. Valve 2CV-2083 is an air-operated containment isolation valve which is required to close automatically upon actuation of containment isolation. Inoperability of 2CV-2083 is a technical violation of containment integrity as defined in Technical Specification 15.1.d. This occurrence is reportable in accordance with Technical Specification 15.6.9.2. A.2 as operating in a less conservative manner than the limiting condition of operation specified in Technical Specification 15.3.6.A.a.

After an immediate investigation it was found that 2CV-2083 failed to close due to excessive stem to packing friction resulting from dried out packing. The packing was adjusted and the valve stem lubricated. Following a satis-factory operational' test on 2CV-2083, it was returned to an operable status at 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> on May 26, 1981. . .

The automatic containment isolation function of 2CV-20 83 was installed, in accordance with NUREG-0578, -

during the Unit 2 refueling outage ending on May 22, 1981.

The last operability test of 2CV-2083 was conducted on May 13, 1981, with satisfactory results. If containment isolation was initiated while 2CV-2083 was inoperable, isolation could be provided via accessible manual valves downstream of 2CV-208 3. At no time was the public safety endangered.

The nameplate data for 2CV-2083 is as follows:

Manufacturer: Copes Vulcan Body Size: 3/4" Pressure Rating: 600 psig Type: D-100-60