ML20004F136

From kanterella
Jump to navigation Jump to search
Forwards LER 81-003/01T-0
Date released: 01/18/2020 Download: ML20004F136


LER 81-003/01T-0:on 810526,steam Generator 2A Blowdown Sample Isolation Valve Failed to Close Upon Actuation.Caused by Excessive Stem to Packing Friction Due to Dried Out Packing.Packing Gland Adjusted & Valve Stem Lubricated
ML20004F141
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 06/04/1981
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20004F141 (2)
Forwards LER 81-003/01T-0
ML20004F135
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 06/08/1981
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20004F135 (1)