05000348/LER-1981-017-03, /03L-0:on 810405,while Performing FNP-1STP-28.2, LOSP BIF Sequencer Failed to Meet Time Requirements for Picking Up Step 6.Caused by Agastat Timer Setpoint for LOSP BIF Sequencer Drifting Below Setpoint.Timer Adjusted

From kanterella
(Redirected from ML20003H987)
Jump to navigation Jump to search
/03L-0:on 810405,while Performing FNP-1STP-28.2, LOSP BIF Sequencer Failed to Meet Time Requirements for Picking Up Step 6.Caused by Agastat Timer Setpoint for LOSP BIF Sequencer Drifting Below Setpoint.Timer Adjusted
ML20003H987
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/04/1981
From:
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003H971 List:
References
LER-81-017-03L, LER-81-17-3L, NUDOCS 8105080293
Download: ML20003H987 (1)


LER-1981-017, /03L-0:on 810405,while Performing FNP-1STP-28.2, LOSP BIF Sequencer Failed to Meet Time Requirements for Picking Up Step 6.Caused by Agastat Timer Setpoint for LOSP BIF Sequencer Drifting Below Setpoint.Timer Adjusted
Event date:
Report date:
3481981017R03 - NRC Website

text

_y C_oNTRol SLOCK: l l

l l

1 l lh (PLEASE PalNT OR TYPE ALL RioulRED INFORMATioN) i R ] A l L l J lM lF ll l@l 0l 01 -l O l 0 l 0'l 010 l-1010 l@l4 Il l1 Il Il I@l_I 7

0 0 LeCENSEE CODE 14 IS LICENSa teuMats 25 26 LiC4 ssi TYPi J0 57 G i sa con'T lolil

","[ dl 015101010 i3 la la l@l 01410 I S I 911 l@l015 lo la In Il l@

3 C

8 60 68 DOCKET NUM3ER 68 69 EVF'T DATE 74 75 REPORT CATE 83 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h IO l2l l At 1855 on 4-5-81, while performing FNP-lSTP-28.2, the LOSP BIF sequencer failed to megj;j iO i3i l the time requirements for picking up step 6.

Tech. Spec. 3.8.1.1 requires two separate I io pi j independent emergency power sequencers to be operable. Tech. Spec. 3.3.1.1 action statel-g g ment requirements were met. The health and safety of'the. general public were not

,o,,g; affected.

g I

8I 10 { 8 { l I

7 09 E

ODE Su C E COMPONENT CODE SU8C dt S

E l El El@ y@ [XJ@ lR lE lL l A lY lX l@ @@ [Z j@

O 9 7

8 9

10 13 12 13 is is 23 SEQUENTIAI.

OCCURRENCE RIPORT REvtSION LER EVENT YEAR REPORT NO.

CODE TYPE 40, O ag/RO I 31 11 1-1 1011I7I W

I013I I Li

[- -I [0_J g

u 25 22 23 24 26 27 2s 29 3J 31 32 K

A T P

T-M HOURS 22 SUS IT FOR.

S.

SUPPL BAA.

F RER l_E_j@[Z_j@

[ Z_l@

[Z_j@

l010l0l0l [N_l@

lNl@

[A_j@

[ A 11 l019 l@

~

33 34 35 36 37 40 di 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTiowa 27 1 10 l l The agastat timer setpoint for the LOSP BIF. sequencer drifted below the setooint reouf redt it til I for picking up step 6.

The agastat timer setpoint was adjusted, the surveillarice test I

successfully run and the sequencer was returned to service at 2035 on 4-5-81.

]

gl

- I t.i La_I I l

I li 141 I so i

.s e A

% POWER OTHER STATUS IS RV DISCOVERY DESCatPTION h' is I [E_j@ l 0 l 4 l 8 l@l NA

~ l-

[B_l@l Performance of surveillance test l

A8TiveTY CO0 RENT LOCATION OF RELEASE RELEASED OF RELECd AMOUNT OF ACTIV'TY i is l W @ W@l NA l

l NA l

80 7

8 9 10 ft 44 45 PERSONNEL EXPOSURES NUMBER TYPE

DESCRIPTION

l il71InIninl@[Z_j@l NA s3 PERSONNEt iN2u' RIES DESCmPTiON@ ' NA

- g NuusER i la l l 0 l 0 l0 l@l

~

80 r

s9 is i2 LOSS OF OR DAMAGE TO FACILITY 819l[Zj@l NA g

S0 8 9 _

to NEc UsE oNLY PUBLICITY g,,,,,,,,,,,,yj 2101 [gj@DESCRtPTION ISSUE D l

g4 a

68 en e3 s 9 to 8105 08 0 g PHONE:

3 NA*.!E oF PREPARER